Clarity Construction Group
- Based in
- San Jose
- On San Francisco permits
- May 2024 to Aug 2026
- Last 24 months
- 12 permits filed
13 permits since 2000: 5 completed, 7 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 expired or cancelled. Typically 160 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2025 | Expired or cancelled suspend Sep 2026 | 3829 25th St | add lower level dwelling unit. veritical addition to add 3rd story; add rooftop terrace. remove and replace front stair and 2nd level entry.Details
add lower level dwelling unit. veritical addition to add 3rd story; add rooftop terrace. remove and replace front stair and 2nd level entry. | $995,900 |