Back to bathroom remodel contractors
Clarity Construction Group
- Based in
- San Jose
- On San Francisco permits
- May 2024 to Aug 2026
- Last 24 months
- 12 permits filed
13 permits since 2000: 5 completed, 7 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
8 bathroom remodel permits: 4 completed, 4 in progress. Typically 0 days from filing to permit and 104 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2026 | In progress issued Jul 2026 | 4650 Irving St | existing kitchen remodel including new appliances, cabinet & island space. new powder room with sink & toilet. half bathroom remodel including new sink, toilet & shower. total area of remodel 380 sq. ft.Details
existing kitchen remodel including new appliances, cabinet & island space. new powder room with sink & toilet. half bathroom remodel including new sink, toilet & shower. total area of remodel 380 sq. ft. | $45,000 |
| Jul 2, 2026 | In progress issued Jul 2026 | 1600 Webster St | like for like bathroom remodel, no structural changes, replace toilet, vanity sink, fan, upgrade mep to code as neededDetails
like for like bathroom remodel, no structural changes, replace toilet, vanity sink, fan, upgrade mep to code as needed | $15,000 |
| May 27, 2026 | Completed final sign-off Oct 2026 | 666 28th St | 1/f: interior remodel for one (e) bathroom at 180 sq ft. no exterior work. no structural work. adding a bedroom door.Details
1/f: interior remodel for one (e) bathroom at 180 sq ft. no exterior work. no structural work. adding a bedroom door. | $25,000 |
| Nov 21, 2025 | Completed final sign-off May 2026 | 1704 Broderick St | bathroom remodel (remove wall between toilet-room to bathroom. frame new walk-in shower and install plumbing - install new 1 sink, vanity and toilet. close the toilet room door. change to opening at the bathroom door. upgrade m.e.p. to code.Details
bathroom remodel (remove wall between toilet-room to bathroom. frame new walk-in shower and install plumbing - install new 1 sink, vanity and toilet. close the toilet room door. change to opening at the bathroom door. upgrade m.e.p. to code. | $25,000 |
| Oct 31, 2025 | Completed final sign-off Jan 2026 | 1505 La Salle Av | master bathroom remodel no structual changes like for like 62 sq ft. showerDetails
master bathroom remodel no structual changes like for like 62 sq ft. shower | $20,000 |
| Sep 9, 2025 | Completed final sign-off Dec 2025 | 290 San Carlos St | apt 3: two bathrooms remodel, like for like. no structural changes. master - shower 50sqft. hallway - tub 35sqft. no removal of wallsDetails
apt 3: two bathrooms remodel, like for like. no structural changes. master - shower 50sqft. hallway - tub 35sqft. no removal of walls | $34,000 |
| May 15, 2025 | In progress issued May 2025 | 220 Hartford St | bathroom remodel. install new 1 sink vanity and toilet. upgrade mep to code. no structural changes like for like.Details
bathroom remodel. install new 1 sink vanity and toilet. upgrade mep to code. no structural changes like for like. | $30,000 |
| May 9, 2024 | In progress issued May 2024 | 1101 Green St | unit 1501- kitchen and bathroom remodel to include (4) recess lights in office, relocate subpanel and add quarter shut off valve in bathroomDetails
unit 1501- kitchen and bathroom remodel to include (4) recess lights in office, relocate subpanel and add quarter shut off valve in bathroom | $85,000 |