Eric Staten
- Listed as
- architect, engineer
- Firm
- Does Architecture
- Based in
- San Francisco
- On San Francisco permits
- Jun 2011 to Aug 2026
42 permits since 2000 (architect on 41 permits, engineer on 1 permit): 35 completed, 2 in progress, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 5, 2026 | In progress filed Aug 2026, not yet issued | 2126 24th St | A+G Design+Build | remodel (e) kitchen, no structural changes, demolish selected non-structural partitions, new casework, appliances, plumbing fixtures,lighting,electrical and finishes.Details
remodel (e) kitchen, no structural changes, demolish selected non-structural partitions, new casework, appliances, plumbing fixtures,lighting,electrical and finishes. | $25,000 |
| Feb 27, 2026 | Completed final sign-off Sep 2026 | 1930 Grove St | A+G Design+Build | unit 3- remodel (e) kitchen no sturcrtural changes demo selected non structural partitions, new casework, appliances plumbing fixtures and electrical fnishes and lightings.Details
unit 3- remodel (e) kitchen no sturcrtural changes demo selected non structural partitions, new casework, appliances plumbing fixtures and electrical fnishes and lightings. | $51,144 |
| Feb 27, 2026 | In progress issued Apr 2026 | 600 Arkansas St | A+G Design+Build | partial bathroom renovation. (n) tub, patch and repair floor at (e) tub. relocate wd, new finishes. (e) lighting and wall outlets to remain. (n) nonstructural partition and cabinet.Details
partial bathroom renovation. (n) tub, patch and repair floor at (e) tub. relocate wd, new finishes. (e) lighting and wall outlets to remain. (n) nonstructural partition and cabinet. | $10,000 |
| Oct 3, 2025 | Completed final sign-off Jun 2026 | 723 46th Av | A+G Design+Build | infill of existing property-line lightwell with new roof and wall, structural framing changes. new skylights and parapet wall. replace ligthwell stair, and replace the kitchen and bath.Details
infill of existing property-line lightwell with new roof and wall, structural framing changes. new skylights and parapet wall. replace ligthwell stair, and replace the kitchen and bath. | $109,391 |
| Sep 4, 2025 | Completed final sign-off Dec 2025 | 22 Montezuma St | A+G Design+Build | replace (e) gas furnace w/(n) heat pump roof mounted; reinforce (e) rafters under conderser unitDetails
replace (e) gas furnace w/(n) heat pump roof mounted; reinforce (e) rafters under conderser unit | $25,000 |
| Mar 4, 2025 | Completed final sign-off Mar 2025 | 666 Morse St | A+G Design+Build | show skylight location @ kitchen revision to pa#2024-0726-7375Details
show skylight location @ kitchen revision to pa#2024-0726-7375 | |
| Sep 10, 2024 | Completed final sign-off Oct 2024 | 22 Montezuma St | A+G Design+Build | voluntary foundation bolting and dry rot repair. add new gyp board at basement west property line wall. no exterior work.Details
voluntary foundation bolting and dry rot repair. add new gyp board at basement west property line wall. no exterior work. | $1,500 |
| Aug 15, 2024 | Completed final sign-off Sep 2024 | 2126 24th St | A+G Design+Build | demolition existing bathroom and replace in kind with new finishes, plumbing fixtures, accessories, lighting, and electrical.Details
demolition existing bathroom and replace in kind with new finishes, plumbing fixtures, accessories, lighting, and electrical. | $20,552 |
| Apr 10, 2024 | Completed final sign-off Jul 2024 | 2621 Bryant St | A+G Design+Build | lower level demo kitchen finishes, fixture & appliances, install new of the same. no structural changes. new electrical & plumbingDetails
lower level demo kitchen finishes, fixture & appliances, install new of the same. no structural changes. new electrical & plumbing | $59,425 |
| Nov 16, 2023 | Completed final sign-off Apr 2024 | 341 Corbett Av | Eastwood Development Incorporated | revision to pa# 202109279265: to relocate and resize several window openings. removal and replacement of entire stucco facade in kind. update 3rd floor rear shearwall to strongwall.Details
revision to pa# 202109279265: to relocate and resize several window openings. removal and replacement of entire stucco facade in kind. update 3rd floor rear shearwall to strongwall. | $20,000 |
| Jul 6, 2023 | Completed final sign-off Dec 2023 | 1930 Grove St | A+G Design+Build | bathroom remodel: change (e) layout add fanDetails
bathroom remodel: change (e) layout add fan | $15,000 |
| Mar 28, 2023 | Completed final sign-off Mar 2024 | 386 Hill St | Barker-O'donoghue Master Bldrs | replace kitchen w/new kitchen in e location, remodel laundry rm, replace side window w/new fixed window, not visible from street, remodel 3rd flr to include 3 bedrooms & 2 bathrooms. new lighting & electrical, new plumbing, fixtures & appliances.Details
replace kitchen w/new kitchen in e location, remodel laundry rm, replace side window w/new fixed window, not visible from street, remodel 3rd flr to include 3 bedrooms & 2 bathrooms. new lighting & electrical, new plumbing, fixtures & appliances. | $136,110 |
| Mar 10, 2023 | Completed final sign-off Apr 2024 | 341 Corbett Av | Eastwood Development Incorporated | revision to pa# 2021-0927-9265 to remove fire sprinkler requirementDetails
revision to pa# 2021-0927-9265 to remove fire sprinkler requirement | |
| Dec 20, 2022 | Never finaled issued Mar 2023, no final | 4439 24th St | removations & infill addition per 2.a.b #4; remodel the e sun rm, kitchen, bathrooms & bedrooms. new lighting & sun tunnels in area of n work. infill the e west lightwell per 2.a.b #4, exception 5a. add a n dormer to rear roof. n doors & windows on rear facade.Details
removations & infill addition per 2.a.b #4; remodel the e sun rm, kitchen, bathrooms & bedrooms. new lighting & sun tunnels in area of n work. infill the e west lightwell per 2.a.b #4, exception 5a. add a n dormer to rear roof. n doors & windows on rear facade. | $75,000 | |
| Nov 15, 2022 | Completed final sign-off Feb 2024 | 849 Sanchez St | Barker-O'donoghue Master Bldrs | revision to pa#202203099585 to extend the roof deck to the edge of the extg roof on the east side at rear yard. change the guard rail to glass on 3 sides, and add a glass window guard to the south and west sides of the approved stair hatch. all guards to be 42 above the stop of the extg roof.Details
revision to pa#202203099585 to extend the roof deck to the edge of the extg roof on the east side at rear yard. change the guard rail to glass on 3 sides, and add a glass window guard to the south and west sides of the approved stair hatch. all guards to be 42 above the stop of the extg roof. | $28,000 |
| Aug 5, 2022 | Completed final sign-off Sep 2023 | 262 Waller St | Parkin Construction Inc | (n) int structural framing create a (n) shared entry in the (e) bldg envelope. (n) electrical and lighting. demo two side wall windows, not visible from the street. add a rear landing in the required yard, less than 3' above grade. no other exterior changes. no changes to the front facade.Details
(n) int structural framing create a (n) shared entry in the (e) bldg envelope. (n) electrical and lighting. demo two side wall windows, not visible from the street. add a rear landing in the required yard, less than 3' above grade. no other exterior changes. no changes to the front facade. | $179,000 |
| Mar 9, 2022 | Completed final sign-off Feb 2024 | 849 Sanchez St | Barker-O'donoghue Master Bldrs | add (n) roof deck, cable guard rail, roof access hatch, & interior stair. replace roofing. remodel (e) kitchen & bathrooms. remove & replace 2nd fl terrace flooring in-kind. new lighting in areas of new work. new whole house fan & ducted ac.Details
add (n) roof deck, cable guard rail, roof access hatch, & interior stair. replace roofing. remodel (e) kitchen & bathrooms. remove & replace 2nd fl terrace flooring in-kind. new lighting in areas of new work. new whole house fan & ducted ac. | $138,552 |
| Nov 5, 2021 | Completed final sign-off Jun 2024 | 1436 Palou Av | Reliable Construction Inc | (n) wood deck,wood planters & remove (e) window & replace w/ (n) door @ rear wall. (n) lighting @ deck. concrete steps,retaining wall & footings.Details
(n) wood deck,wood planters & remove (e) window & replace w/ (n) door @ rear wall. (n) lighting @ deck. concrete steps,retaining wall & footings. | $25,000 |
| Sep 27, 2021 | Completed final sign-off Apr 2024 | 341 Corbett Av | Eastwood Development Incorporated | renovation & expand top unit. demo interior partitions, kitch & bath on 2nd flr. demo 3rd flr framing & rf. replace kitch, bath, & stair on 2nd flr, rebuild & expand habitable area on 3rd flr (n) bathrm, laundry, closets. (n) rf frame & dormers. (n) comp shingle rf, (n)windows & drDetails
renovation & expand top unit. demo interior partitions, kitch & bath on 2nd flr. demo 3rd flr framing & rf. replace kitch, bath, & stair on 2nd flr, rebuild & expand habitable area on 3rd flr (n) bathrm, laundry, closets. (n) rf frame & dormers. (n) comp shingle rf, (n)windows & dr | $216,600 |
| May 21, 2021 | Completed final sign-off Feb 2022 | 146 Gambier St | Mela Construction Co | new wood deck <10' above grade with cable rail & metal panel guardrails, planters, new swing door with sidelight.Details
new wood deck <10' above grade with cable rail & metal panel guardrails, planters, new swing door with sidelight. | $15,000 |
| May 13, 2021 | Completed final sign-off Nov 2022 | 1843 Church St | Reliable Construction Inc | new 2-level wood deck and stair with pre-fabricated metal and cable guardrail. new concrete landing at grade. replace existing rear windows with new rear windows and doors. add new exterior lighting.Details
new 2-level wood deck and stair with pre-fabricated metal and cable guardrail. new concrete landing at grade. replace existing rear windows with new rear windows and doors. add new exterior lighting. | $28,000 |
| Oct 21, 2020 | Completed final sign-off Mar 2023 | 398 12th St | Structoris Inc. | remodel (e) kitchen of (e) bar/restaurant to serve expanded menu of food. remove & repl with (n) grease producing appliances, new hood/exhaust, new roof fan. new walk-in fridge. new ul300 ansul fire protection system under sep permit.Details
remodel (e) kitchen of (e) bar/restaurant to serve expanded menu of food. remove & repl with (n) grease producing appliances, new hood/exhaust, new roof fan. new walk-in fridge. new ul300 ansul fire protection system under sep permit. | $25,000 |
| Jan 29, 2020 | Expired or cancelled cancelled Jan 2026 | 1 Idora Av | remove e fence at wood side drive . dig post holes, pour concrete footings. install fence posts. clad fenceDetails
remove e fence at wood side drive . dig post holes, pour concrete footings. install fence posts. clad fence | $10,000 | |
| Oct 21, 2019 | Completed final sign-off Jun 2021 | 800 Carolina St | Parkin Construction Inc | horizontal addition & interior renovation: add storage rm to basement, redesign interior layout on 1st & 2nd flr, add bay & new windows to facade, add laundry & bathroom to the 2nd flr and enlarge the master rm. replace all exterior doors & windows.Details
horizontal addition & interior renovation: add storage rm to basement, redesign interior layout on 1st & 2nd flr, add bay & new windows to facade, add laundry & bathroom to the 2nd flr and enlarge the master rm. replace all exterior doors & windows. | $200,000 |
| Sep 3, 2019 | Completed final sign-off Feb 2022 | 54 Macondray Ln | Sing Wong | work @ 54 macondray lane only. horizontal addition & interior renovation: 3rd floor: demolish & replace (e) kitchen, remove wall between living & kitchen. add washer/dryer. relocate br closet. 4th floor: demo (e) roof structure & rear yard. add new master, lounge, demo (e) bath & replace.Details
work @ 54 macondray lane only. horizontal addition & interior renovation: 3rd floor: demolish & replace (e) kitchen, remove wall between living & kitchen. add washer/dryer. relocate br closet. 4th floor: demo (e) roof structure & rear yard. add new master, lounge, demo (e) bath & replace. | $165,000 |
| Aug 8, 2019 | Expired or cancelled withdrawn May 2020 | 1871 08th Av | legalize third unit per ordinance no. 43-14. improve unit (2 bedroom & 1 bath) to meet all applicable code requirements. no excavation.Details
legalize third unit per ordinance no. 43-14. improve unit (2 bedroom & 1 bath) to meet all applicable code requirements. no excavation. | $32,000 | |
| Jul 31, 2019 | Completed final sign-off May 2020 | 18 Chicago Wy | Sing Wong | int reno - add bathroom, office & laundry on ground flr. modify doors, replace window & door demo kitchen & replace w/a new kitchen, remove fireplace, add living room caseworkDetails
int reno - add bathroom, office & laundry on ground flr. modify doors, replace window & door demo kitchen & replace w/a new kitchen, remove fireplace, add living room casework | $100,000 |
| Aug 29, 2018 | Never finaled issued Oct 2018, no final | 104 Lundys Ln | Klep Construction Inc. | revision to 201806071214 add a parapet at the side lightwell change construction type of fire rated property line wall. intumescent paint is not required.Details
revision to 201806071214 add a parapet at the side lightwell change construction type of fire rated property line wall. intumescent paint is not required. | $500 |
| Jul 27, 2018 | Completed final sign-off Jan 2020 | 1 Idora Av | Charles Brusch | replace front & side windows in (e) opening. replace rears windows w/sliding doors. add new rear deck, new site stair & retainin wall. remodel kitchen & 2 baths. enlarge opening to l.r & d.r. add new closet, change bedroom doors, enlarge bdrm 3 closet, new ductsDetails
replace front & side windows in (e) opening. replace rears windows w/sliding doors. add new rear deck, new site stair & retainin wall. remodel kitchen & 2 baths. enlarge opening to l.r & d.r. add new closet, change bedroom doors, enlarge bdrm 3 closet, new ducts | $125,000 |
| Jun 7, 2018 | Completed final sign-off Sep 2019 | 104 Lundys Ln | Klep Construction Inc. | demo (e) rear stair, replace and enlarge fron window, replace front doors, add new meter abinet, reloate gas meter, replace back door, add new skylights, demo portions of 1st and 2nd floor interior walls & stairs, add new stair, remodel 1 bath, add new bath & 2 bedrooms, new elec & plumbingDetails
demo (e) rear stair, replace and enlarge fron window, replace front doors, add new meter abinet, reloate gas meter, replace back door, add new skylights, demo portions of 1st and 2nd floor interior walls & stairs, add new stair, remodel 1 bath, add new bath & 2 bedrooms, new elec & plumbing | $250,000 |
| Jun 5, 2018 | Completed final sign-off Jan 2019 | 955 Corbett Av | #8: demo (2) non-structural partitions. demo (e) kitchen floor, cabinets, appliances, plumbing fixtures & elec. install (n) tile floor, new cabinets, counters, backsplash, elec. outlets, sink, faucet, d/w, lighting, upgrade electrical panel.Details
#8: demo (2) non-structural partitions. demo (e) kitchen floor, cabinets, appliances, plumbing fixtures & elec. install (n) tile floor, new cabinets, counters, backsplash, elec. outlets, sink, faucet, d/w, lighting, upgrade electrical panel. | $20,000 | |
| Dec 22, 2016 | Completed final sign-off Jul 2021 | 1858 Church St | remove portions of (e)structure, excavate g/f, horiz & vert. addition;renovate the structure to remain; modify living, replace dining;replace kitchen,add family rm, add 2 bedrms, 3.5 baths, add closets, laundry utility and modify garageDetails
remove portions of (e)structure, excavate g/f, horiz & vert. addition;renovate the structure to remain; modify living, replace dining;replace kitchen,add family rm, add 2 bedrms, 3.5 baths, add closets, laundry utility and modify garage | $900,000 | |
| Aug 30, 2016 | Completed final sign-off Mar 2017 | 1100 Sacramento St | Stephenson Construction Co | interior renovation of one unit in a 34 unit bldg, on the 3rd floor: reconfigure entry, gallery, dining room, kitchen, master suite includes master bath & closet, and guest bath. replace (e) steam radiator panels in kind in living room & dining room.Details
interior renovation of one unit in a 34 unit bldg, on the 3rd floor: reconfigure entry, gallery, dining room, kitchen, master suite includes master bath & closet, and guest bath. replace (e) steam radiator panels in kind in living room & dining room. | $109,000 |
| Feb 10, 2016 | Completed final sign-off Aug 2016 | 178 Holladay Av | Sing Wong | interior renovation consisting of new bathroom on 2nd floor, with new polycarbonate dome skylight. not visible from streetDetails
interior renovation consisting of new bathroom on 2nd floor, with new polycarbonate dome skylight. not visible from street | $8,000 |
| Dec 18, 2015 | Never finaled issued Mar 2016, no final | 1606 Harrison St | interior renovation of an existing 2-story industrial bldg. new interior partitions, new ada bathrooms, new mechanical & electrical work under deferred permits. no change in occupancy & no structural changes. n/a maher ordinanceDetails
interior renovation of an existing 2-story industrial bldg. new interior partitions, new ada bathrooms, new mechanical & electrical work under deferred permits. no change in occupancy & no structural changes. n/a maher ordinance | $114,000 | |
| Nov 10, 2015 | Completed final sign-off Mar 2016 | 2646 Broderick St | Centric Building Inc. | 2/f bathroom remodel, electrical, plumbing, new stonetile fixtures, vanity, drywall & paint. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged.Details
2/f bathroom remodel, electrical, plumbing, new stonetile fixtures, vanity, drywall & paint. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. | $67,000 |
| Jun 9, 2015 | Completed final sign-off Jul 2017 | 879 Sanchez St | Ng's Landmark Bldg & Engineering | replace (e) greenhouse roof w/(n) insulated wood frame door in same location. replace (e) doors & windows w/(n) doors & windows-replace (e) prop line windows in kind. replace (e) deck w/(n) wood deck. build (n) landscape planters, fence & stair.Details
replace (e) greenhouse roof w/(n) insulated wood frame door in same location. replace (e) doors & windows w/(n) doors & windows-replace (e) prop line windows in kind. replace (e) deck w/(n) wood deck. build (n) landscape planters, fence & stair. | $54,850 |
| Aug 15, 2013 | Completed final sign-off Feb 2015 | 468 Lansdale Av | demolish (e) ground floor deck & construct a (n) 2 level rear deck at the ground & 1st floor within allowable building area. replace (e) rear window w/a (n) sliding glass door to match (e) styleDetails
demolish (e) ground floor deck & construct a (n) 2 level rear deck at the ground & 1st floor within allowable building area. replace (e) rear window w/a (n) sliding glass door to match (e) style | $95,000 | |
| Mar 15, 2013 | Completed final sign-off Jan 2014 | 932 Shotwell St | Sing Wong | first floor unit - interior renovation of existing unit incl structural, mech, plumbing, new interior finishes, fixtures, lighting, new windows & doors to match existing, not visible from the street.Details
first floor unit - interior renovation of existing unit incl structural, mech, plumbing, new interior finishes, fixtures, lighting, new windows & doors to match existing, not visible from the street. | $92,000 |
| Oct 5, 2012 | Completed final sign-off Nov 2019 | 398 12th St | Occidental Express | comply with complaint# 201217661-ada upgrades to main entrance, path of travel & restrooms. new lighting.Details
comply with complaint# 201217661-ada upgrades to main entrance, path of travel & restrooms. new lighting. | $118,000 |
| Jun 21, 2012 | Completed final sign-off Nov 2012 | 429 Douglass St | Sing Wong | remodel kitchen on 1st fl, relocate washer/dryer on the 2nd fl, remodel master bathroom on 3rd fl, add new steps in front courtyard <30" high, remove decorative water feature at front courtyard, remodel kitchen door in (e) opening, add new skylight at 1st flDetails
remodel kitchen on 1st fl, relocate washer/dryer on the 2nd fl, remodel master bathroom on 3rd fl, add new steps in front courtyard <30" high, remove decorative water feature at front courtyard, remodel kitchen door in (e) opening, add new skylight at 1st fl | $150,000 |
| Jun 29, 2011 | Completed final sign-off Nov 2011 | 4376 24th St | Brautovich Construction Inc. | revision to 201106097754. dryrot repair to existing wall. reframe. remove existing aluminum siding per plansDetails
revision to 201106097754. dryrot repair to existing wall. reframe. remove existing aluminum siding per plans | $2,500 |