Block 3617, lot 051
20 Hill St
- City’s use
- Single Family Residential
- Built
- 1885
- Stories
- 2
- Units
- 1
- Rooms
- 5 bedrooms, 2 bathrooms
- Building
- 1,800 sq ft
- Lot
- 3,420 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 13, 2026 | In progress issued Mar 2026 | 20 Hill St | D K G Construction Inc | subsurface storm drainage: right side of house facing street, roughly 20' of 4" pipe with filter fabric to drain into sewer. drainage being installed along property line and not below adjacent footing. work requested by field inspector.Details
subsurface storm drainage: right side of house facing street, roughly 20' of 4" pipe with filter fabric to drain into sewer. drainage being installed along property line and not below adjacent footing. work requested by field inspector. | $5,000 |
| Oct 7, 2025 | In progress issued Oct 2025 | 20 Hill St | D K G Construction Inc | installation of footings in sequence for house remodel.Details
installation of footings in sequence for house remodel. | $10,000 |
| Sep 9, 2022 | In progress issued Apr 2025 | 20 Hill St | D K G Construction Inc | 2 story horizontal addition at the rear and single story horizontal garage expansion at the front of the house. interior remodel. requires a certificate of appropriatness.Details
2 story horizontal addition at the rear and single story horizontal garage expansion at the front of the house. interior remodel. requires a certificate of appropriatness. | $300,000 |
| Jan 11, 2022 | Completed final sign-off Apr 2023 | 20 Hill St | Guan Construction | install recessed led lighting on top 2 floors hallway. convert the (e) bedroom into a new master sunroom and new walkin closet on top floor per plan. add fireplace in bedroom.Details
install recessed led lighting on top 2 floors hallway. convert the (e) bedroom into a new master sunroom and new walkin closet on top floor per plan. add fireplace in bedroom. | $15,000 |
| Sep 24, 2021 | Completed final sign-off Oct 2021 | 20 Hill St | replace (e) kitchen counters and replace (e) vanity in bathroom. no new kitchen cabinets, no new kitchen appliances. lights per cenc 150.0 k.Details
replace (e) kitchen counters and replace (e) vanity in bathroom. no new kitchen cabinets, no new kitchen appliances. lights per cenc 150.0 k. | $1,500 | |
| Jul 7, 2003 | Completed final sign-off Jun 2004 | 20 Hill St | Mickey Bailey Const. | remove existing deck (s) & replace per plansDetails
remove existing deck (s) & replace per plans | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- D K G Construction Inc (3), Guan Construction, Mickey Bailey Const.
- Architects
- Megan Hannon
- Engineers
- Raymond Situ (2), Erwin O'toole, Jason Pisano