David Cumby
- Listed as
- architect, engineer
- Firm
- Cumby Architecture
- Based in
- San Francisco
- On San Francisco permits
- Aug 2008 to Aug 2026
155 permits since 2000 (architect on 153 permits, engineer on 2 permits): 111 completed, 14 in progress, 16 never finaled, 14 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 155.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 10, 2026 | In progress issued Sep 2026 | 173 Downey St | Shoshan Construction Services | revision to pa#202506259462: replace drivewap concrete slab in kind.Details
revision to pa#202506259462: replace drivewap concrete slab in kind. | $1,700 |
| Aug 5, 2026 | In progress issued Aug 2026 | 263 08th Av | Roly Construction | renovation at third floor apartment #265. replace 7 windows at street facade, 4 at side and rear, 1 new window at side. add 20 sq ft at existing light well. renovate kitchen, renovate 1 bathroom, add 1 new full bath.Details
renovation at third floor apartment #265. replace 7 windows at street facade, 4 at side and rear, 1 new window at side. add 20 sq ft at existing light well. renovate kitchen, renovate 1 bathroom, add 1 new full bath. | $140,000 |
| Jul 15, 2026 | In progress filed Jul 2026, not yet issued | 325 Elsie St | (n) living space within (e) ground floor level. (n) full bath, relocate (e) washer and dryerDetails
(n) living space within (e) ground floor level. (n) full bath, relocate (e) washer and dryer | $70,000 | |
| Jul 10, 2026 | In progress filed Jul 2026, not yet issued | 3121 20th St | Roly Construction | unit 3: at existing mezzanine - infill floor opening, replace 2 skylights, add 2 new heat pumps.Details
unit 3: at existing mezzanine - infill floor opening, replace 2 skylights, add 2 new heat pumps. | $22,000 |
| Feb 23, 2026 | In progress issued Mar 2026 | 2917 25th St | Chavez Plumbing | rev to 202512302942: at top floor, add shower to (e) 1/2 bath, replace 1 window in-kind at rear yard. install new ventless washer/dryer.Details
rev to 202512302942: at top floor, add shower to (e) 1/2 bath, replace 1 window in-kind at rear yard. install new ventless washer/dryer. | $14,000 |
| Dec 10, 2025 | Completed final sign-off Sep 2026 | 3121 20th St | Roly Construction | unit 3: revision to permit 202512010627. replace tub with shower in existing bathroom.Details
unit 3: revision to permit 202512010627. replace tub with shower in existing bathroom. | $3,000 |
| Oct 6, 2025 | In progress issued Oct 2025 | 3859 23rd St | 3/f: renovate one full bath. expand one half bath to full bath. relocate washer/dryer.Details
3/f: renovate one full bath. expand one half bath to full bath. relocate washer/dryer. | $47,000 | |
| Sep 15, 2025 | In progress issued Dec 2025 | 1550 Diamond St | Roly Construction | revision to pa #202501108136. relocate kitchen, change primary bath & half bath layout at 3rd floor. add one new fire rated window. window replacement at east, south and west facades. replace quardrail in kind at east facing roof deck. 2 new skylights.Details
revision to pa #202501108136. relocate kitchen, change primary bath & half bath layout at 3rd floor. add one new fire rated window. window replacement at east, south and west facades. replace quardrail in kind at east facing roof deck. 2 new skylights. | $78,000 |
| Sep 11, 2025 | Completed final sign-off Mar 2026 | 3213 Folsom St | Simon & Brother Construction Inc | revision 202406265325- add fire rated window and skylight . not visible from street. reconfigure bathroom layout.Details
revision 202406265325- add fire rated window and skylight . not visible from street. reconfigure bathroom layout. | $6,000 |
| Jul 31, 2025 | In progress issued Dec 2025 | 173 Downey St | Shoshan Construction Services | renovate kitchen. renovate 3 bathrooms. add (1) new bathroom on 3/f and (1) half bath on 2/f. new elevator, new radiant heating at all 3 floors. new air conditioning at 3/f.Details
renovate kitchen. renovate 3 bathrooms. add (1) new bathroom on 3/f and (1) half bath on 2/f. new elevator, new radiant heating at all 3 floors. new air conditioning at 3/f. | $378,000 |
| Mar 7, 2025 | In progress issued Mar 2025 | 1550 Diamond St | Roly Construction | revision to pa #2025-0110-8136 remove unpermitted roof over deck at rear yard. replace windows at 2nd & 3rd fl. replace interior stair run from 2nd to 3rd fl. at 3rd fl, renovate one bath, add new full bath.Details
revision to pa #2025-0110-8136 remove unpermitted roof over deck at rear yard. replace windows at 2nd & 3rd fl. replace interior stair run from 2nd to 3rd fl. at 3rd fl, renovate one bath, add new full bath. | $36,000 |
| Jan 10, 2025 | In progress issued Jan 2025 | 1550 Diamond St | Roly Construction | new conditioned space within existing first floor. replace 2 windows in kind - renovate kitchen and bath, relocate partitions at second floor - new furnace - add 1 new windowDetails
new conditioned space within existing first floor. replace 2 windows in kind - renovate kitchen and bath, relocate partitions at second floor - new furnace - add 1 new window | $45,000 |
| Dec 19, 2024 | In progress issued Dec 2024 | 5945 03rd St | unit c; all work to be done on existing 2nd flr. new doors and interior windows at existing second floor counseling room - no structural work.Details
unit c; all work to be done on existing 2nd flr. new doors and interior windows at existing second floor counseling room - no structural work. | $20,000 | |
| Nov 8, 2024 | Completed final sign-off May 2025 | 1901 Ocean Av | Bejarano Construction 9inc | change of use to expand (e) restaurant into retail space. add take out sales counter, and prep spaces in (e) vacant retail ground floor space.Details
change of use to expand (e) restaurant into retail space. add take out sales counter, and prep spaces in (e) vacant retail ground floor space. | $30,000 |
| Sep 4, 2024 | Completed final sign-off Mar 2026 | 3213 Folsom St | Simon & Brother Construction Inc | abate dcp 2023-007701enf. add one new adu in existing detached structure per govt code section 65852.2Details
abate dcp 2023-007701enf. add one new adu in existing detached structure per govt code section 65852.2 | $45,000 |
| May 15, 2024 | In progress issued May 2024 | 2163 Union St | Blue Jade Construction Inc | mechnical system - outside air ventilation, exhaust for storage/recology bin spaces. ref ti permit 202402055230Details
mechnical system - outside air ventilation, exhaust for storage/recology bin spaces. ref ti permit 202402055230 | $12,000 |
| Feb 5, 2024 | In progress issued Apr 2024 | 2163 Union St | Blue Jade Construction Inc | new cafe in (e) commercial space, new counters, refrigerators and stainless steel sinks, mechanincal ventilation deferred submital. ada push button door operator, wireless, adhesive attachmentDetails
new cafe in (e) commercial space, new counters, refrigerators and stainless steel sinks, mechanincal ventilation deferred submital. ada push button door operator, wireless, adhesive attachment | $60,000 |
| Sep 7, 2023 | Expired or cancelled withdrawn Dec 2024 | 5945 03rd St | Ehj Construction,Inc., R. C. Construction | tenant improvement: new counseling room at ground floor. new doors adn interior windows at (e) second floor counseling rooms - no structural work.Details
tenant improvement: new counseling room at ground floor. new doors adn interior windows at (e) second floor counseling rooms - no structural work. | $26,700 |
| Aug 29, 2023 | Completed final sign-off Jul 2024 | 281 Madison St | revision to 202207289457: clarify fire rated wall detailsDetails
revision to 202207289457: clarify fire rated wall details | ||
| Jan 6, 2023 | Expired or cancelled cancelled Jan 2026 | 298 Pacific Av | Kerley Construction Inc | revision to pa 2021-0423-9261 provide accessible seating at bar with counter attached to existing bar and replace exxisting wall mounted counter with accessible counterDetails
revision to pa 2021-0423-9261 provide accessible seating at bar with counter attached to existing bar and replace exxisting wall mounted counter with accessible counter | $4,200 |
| Dec 29, 2022 | Completed final sign-off Aug 2024 | 231 Sanchez St | apt #2: new heating system to be ductless mini split w/ heat pump.Details
apt #2: new heating system to be ductless mini split w/ heat pump. | $8,000 | |
| Dec 29, 2022 | Completed final sign-off Aug 2024 | 231 Sanchez St | revision pa #201909091085: change heating system at adu to be ductless mini split w/ heat pump.Details
revision pa #201909091085: change heating system at adu to be ductless mini split w/ heat pump. | $8,000 | |
| Dec 9, 2022 | Completed final sign-off Nov 2023 | 143 Jersey St | Chavez Plumbing | replace front exterior stair in kind. remove segment of sloped roof at rear yard, southwest corner. replace 1 window in kind at rear yard. remove 2 windows and add 3 new windows at rear yard. all new windows wood frame alum clad.Details
replace front exterior stair in kind. remove segment of sloped roof at rear yard, southwest corner. replace 1 window in kind at rear yard. remove 2 windows and add 3 new windows at rear yard. all new windows wood frame alum clad. | $19,500 |
| Oct 14, 2022 | Completed final sign-off Jun 2023 | 8 Ardenwood Wy | Northward Construction | 2nd fl: renovation (e) full bathroom. add shower to (e) half bath. replace window not visible from st.Details
2nd fl: renovation (e) full bathroom. add shower to (e) half bath. replace window not visible from st. | $18,000 |
| May 24, 2022 | Completed final sign-off Feb 2023 | 2260 Chestnut St | new cheese shop: plumbing work, electrical work, new floor, new window. tenant improvement. no structural work. no walls modified or infilled. no layout changes.Details
new cheese shop: plumbing work, electrical work, new floor, new window. tenant improvement. no structural work. no walls modified or infilled. no layout changes. | $50,000 | |
| Mar 10, 2022 | Completed final sign-off Sep 2023 | 1335 Divisadero St | Ren Lei Construction Co | revision to premit 201507010499 convert additional 287 sqft of existing unconditioned space to living space alter window layout at south side elevation. relocate interior stair from 1st to 2nd floor. revise kitchen, master bath, two full bath designs. remove one full bath.Details
revision to premit 201507010499 convert additional 287 sqft of existing unconditioned space to living space alter window layout at south side elevation. relocate interior stair from 1st to 2nd floor. revise kitchen, master bath, two full bath designs. remove one full bath. | $40,000 |
| Dec 14, 2021 | Completed final sign-off Dec 2022 | 1967 Sutter St | Ryan Construction | t.i. : new accessible restroom, new windows and door at rear elevation, new lighting and heating.Details
t.i. : new accessible restroom, new windows and door at rear elevation, new lighting and heating. | $46,000 |
| Nov 24, 2021 | Completed final sign-off Jun 2022 | 2626 Union St | Herling Construction | existing top fl. apartment - renovate (e) kitchen, alter ceiling at hall, bedroom, and kitchenDetails
existing top fl. apartment - renovate (e) kitchen, alter ceiling at hall, bedroom, and kitchen | $30,000 |
| Oct 19, 2021 | Completed final sign-off Oct 2022 | 1426 18th St | change of use from existing vacant office to new specialty grocery in existing ground fl commercial space. renovate (e) restroom.Details
change of use from existing vacant office to new specialty grocery in existing ground fl commercial space. renovate (e) restroom. | $55,000 | |
| Sep 16, 2021 | Completed final sign-off May 2022 | 424 College Av | Jfieco | renovate (e) exterior stair. revise stair layout at lower landing. replace brick treads and risers with stone tile finish replace existing guardrail with new 42" high guardrailDetails
renovate (e) exterior stair. revise stair layout at lower landing. replace brick treads and risers with stone tile finish replace existing guardrail with new 42" high guardrail | $12,000 |
| Dec 23, 2020 | Never finaled filed Dec 2020, never issued | 890 Hayes St | place of assembly permit for 2 (e) spaces- "dining" at 1st flr level to be a2 occupancy, assembly w/o fixed seats & "kings hall" at 3rd flr level to be a3 occupancy assembly w/o fixed seats. no physical changes to (e) conditions proposed under this applicationDetails
place of assembly permit for 2 (e) spaces- "dining" at 1st flr level to be a2 occupancy, assembly w/o fixed seats & "kings hall" at 3rd flr level to be a3 occupancy assembly w/o fixed seats. no physical changes to (e) conditions proposed under this application | ||
| Dec 23, 2020 | Expired or cancelled cancelled Jan 2026 | 815 Buena Vista West Av | place of assembly permit for 2 (e) space- "harvey hall" at 2nd flr level to be a3 occupancy, assembly w/o fixed seats. no physical changes to (e) conditions proposed under this application.Details
place of assembly permit for 2 (e) space- "harvey hall" at 2nd flr level to be a3 occupancy, assembly w/o fixed seats. no physical changes to (e) conditions proposed under this application. | ||
| Oct 16, 2020 | Completed final sign-off May 2024 | 1415 South Van Ness Av | Wickman Development And Construction | revision to pa# 201703242338. revision to foundation work.Details
revision to pa# 201703242338. revision to foundation work. | $30,000 |
| Oct 14, 2020 | Completed final sign-off May 2024 | 1409 South Van Ness Av | Wickman Development And Construction | revision to pa 201703242335. revision to foundation work.Details
revision to pa 201703242335. revision to foundation work. | $30,000 |
| Oct 9, 2020 | Completed final sign-off Apr 2021 | 48 Cook St | to comply with notice of violation 202044081: remove wood fence and gate build within front yard setback, install new 6'-0 wood fence and gate in compliance with front setback and reduce height of any portion fo (e) side property line fencing to be 6'-0" max abv gradeDetails
to comply with notice of violation 202044081: remove wood fence and gate build within front yard setback, install new 6'-0 wood fence and gate in compliance with front setback and reduce height of any portion fo (e) side property line fencing to be 6'-0" max abv grade | $8,000 | |
| Oct 2, 2020 | Completed final sign-off Dec 2021 | 130 Saint Germain Av | Ramos General Construction Inc. | rev to pa201608114833: new interior stair and guardrail framing.Details
rev to pa201608114833: new interior stair and guardrail framing. | $35,000 |
| Oct 1, 2020 | Expired or cancelled withdrawn Mar 2022 | 1335 Divisadero St | Sheehan Construction Solutions | revision to permit application #201508053439 - reduce scope of work of original permit. existing interior partitions, stair, and mechanical equipment to remain. no new living space at ground floorDetails
revision to permit application #201508053439 - reduce scope of work of original permit. existing interior partitions, stair, and mechanical equipment to remain. no new living space at ground floor | |
| Sep 22, 2020 | In progress issued Feb 2025 | 247 Upper Tr | Ramos General Construction Inc. | erect a four story type 5b construction two family dwelling and one basement.Details
erect a four story type 5b construction two family dwelling and one basement. | $750,000 |
| Jan 3, 2020 | Completed final sign-off Jan 2020 | 62 Tioga Av | Lake Marine Construction Inc | revision to pa# 201707141933; change heating system to be radion heat with gas combo boiler (space heating and domestic hot water)Details
revision to pa# 201707141933; change heating system to be radion heat with gas combo boiler (space heating and domestic hot water) | |
| Dec 6, 2019 | Completed final sign-off Apr 2021 | 163 28th St | Bgg Construction Inc | revision to pa# 2019-0829-0327: replace brick in-kind at street facade. relocate recessed entry door - 3 foot from facade. new 8 ft tall wood fence at rear yard. at ground floor, relocate doors and partitions, change master bath layout. replace interior stair in kindDetails
revision to pa# 2019-0829-0327: replace brick in-kind at street facade. relocate recessed entry door - 3 foot from facade. new 8 ft tall wood fence at rear yard. at ground floor, relocate doors and partitions, change master bath layout. replace interior stair in kind | $28,000 |
| Nov 14, 2019 | Expired or cancelled cancelled Apr 2025 | 3213 Folsom St | legalize and remodel (e) dwelling unit per unit legalization ord no 43-14. remodel unit construct (n) toter enclosure (under separate permit). assign street address to legalized unit.Details
legalize and remodel (e) dwelling unit per unit legalization ord no 43-14. remodel unit construct (n) toter enclosure (under separate permit). assign street address to legalized unit. | $45,000 | |
| Oct 16, 2019 | Completed final sign-off Oct 2023 | 101 Landers St | Rinaldi Construction | comply w/ nov#201932231 & 201932221 to demolish a detached one story, type 5b, garage bldg.Details
comply w/ nov#201932231 & 201932221 to demolish a detached one story, type 5b, garage bldg. | $1,820 |
| Oct 16, 2019 | Completed final sign-off Oct 2023 | 101 Landers St | Rinaldi Construction | to erect a one story, type 5b, detached garage bldg.Details
to erect a one story, type 5b, detached garage bldg. | $35,500 |
| Oct 10, 2019 | Completed final sign-off Oct 2021 | 80 Clairview Ct | Northward Construction | new living space at ground fl, in existing envelope. 1 bedroom, 1 bath, laundry. new furnace & water heater. replace exterior door at rear yard. 200 amp service upgrade. relocate main drain waste vent stack.Details
new living space at ground fl, in existing envelope. 1 bedroom, 1 bath, laundry. new furnace & water heater. replace exterior door at rear yard. 200 amp service upgrade. relocate main drain waste vent stack. | $36,000 |
| Sep 17, 2019 | Completed final sign-off Dec 2019 | 1563 Mission St | R. C. Construction | ti @ 2nd fl - remove interior partitions, add new parttions and doorsDetails
ti @ 2nd fl - remove interior partitions, add new parttions and doors | $40,000 |
| Aug 29, 2019 | Completed final sign-off Apr 2021 | 163 28th St | Bgg Construction Inc | new living space at gr fl e envelope, 2 bedrooms, 2 baths, 1 office, laundry, mech 2nd fl. replace kitchen, remove full bath, add 1/2 bath. replace 2 windows at street facade, increase width of garage door due to 10' new doors and windows at rear yard. remove portion of e wood deck at rear yardDetails
new living space at gr fl e envelope, 2 bedrooms, 2 baths, 1 office, laundry, mech 2nd fl. replace kitchen, remove full bath, add 1/2 bath. replace 2 windows at street facade, increase width of garage door due to 10' new doors and windows at rear yard. remove portion of e wood deck at rear yard | $264,000 |
| Aug 22, 2019 | Completed final sign-off Oct 2023 | 101 Landers St | Rinaldi Construction | to comply w/ nov #201932231 & #201932221. revision to permit #201411202125. new roof deck on detached garage w/ 42 inch guardrails. add and replace stair run. add 1 hour rated wall at stair & lanudry.Details
to comply w/ nov #201932231 & #201932221. revision to permit #201411202125. new roof deck on detached garage w/ 42 inch guardrails. add and replace stair run. add 1 hour rated wall at stair & lanudry. | $18,000 |
| Aug 9, 2019 | Completed final sign-off Feb 2020 | 730 Howard St | Kieran Collins Construction | at (e) storage space for "samovar tea lounge", provide enclosure and install (n) interior partitions per health department requestDetails
at (e) storage space for "samovar tea lounge", provide enclosure and install (n) interior partitions per health department request | $7,000 |
| Jun 21, 2019 | Completed final sign-off Jul 2020 | 549 Union St | Custom Construction Enterprises | all work at 2nd fl level, unit 549: renovate kitchen & bathroom, add new bathroom. new furnace & water heater. no fire alarm system in building. now sprinkler system on 2nd floor.Details
all work at 2nd fl level, unit 549: renovate kitchen & bathroom, add new bathroom. new furnace & water heater. no fire alarm system in building. now sprinkler system on 2nd floor. | $75,000 |
| Jun 7, 2019 | Completed final sign-off Sep 2019 | 299 Guerrero St | to comply with accessible business entrance program ord 51-16 entry door: replace existing door hardware with lever style door hardware only.Details
to comply with accessible business entrance program ord 51-16 entry door: replace existing door hardware with lever style door hardware only. | $500 | |
| May 31, 2019 | Completed final sign-off Jan 2020 | 49 Prospect Av | Dewell Built Inc. | interior renovation at 1st fl - convert existing storage and utility rooms to a bedroom and bathroomDetails
interior renovation at 1st fl - convert existing storage and utility rooms to a bedroom and bathroom | $28,000 |
| Mar 25, 2019 | Completed final sign-off Mar 2020 | 551 Union St | Custom Construction Enterprises | all work at unit 551 (3rd flr) renovate kitchen and bathroom. add new bathroom, new furnance and w/hDetails
all work at unit 551 (3rd flr) renovate kitchen and bathroom. add new bathroom, new furnance and w/h | $58,000 |
| Mar 18, 2019 | Never finaled issued Apr 2019, no final | 3574 17th St | revision to pa 2016-0708-1921 - new concrete stairs and retaining walls at rear yard and below grade level. new open metal guardrail at grade level. new concrete footing under existing entry stair at front of building.Details
revision to pa 2016-0708-1921 - new concrete stairs and retaining walls at rear yard and below grade level. new open metal guardrail at grade level. new concrete footing under existing entry stair at front of building. | $18,000 | |
| Feb 12, 2019 | Completed final sign-off Jul 2020 | 8 Ardenwood Wy | Northward Construction | replace 2 windows in kind & remove 1 window @ south side elevation. replace 1 window in kind at light court. renovate existing kitchen. add half bath. replace furnace and water heaterDetails
replace 2 windows in kind & remove 1 window @ south side elevation. replace 1 window in kind at light court. renovate existing kitchen. add half bath. replace furnace and water heater | $48,000 |
| Oct 17, 2018 | Completed final sign-off Nov 2019 | 72 Uranus Tr | Art Of Italy Inc Dba: Aoi Group | revision to app#201702088966. replace 2 windows with sliding glass door at rear yard. install new furnace. changes to structural framing.Details
revision to app#201702088966. replace 2 windows with sliding glass door at rear yard. install new furnace. changes to structural framing. | $12,000 |
| Jun 7, 2018 | Never finaled issued Oct 2020, no final | 3574 17th St | Ryan Construction | revision to permit #201607081921 - new title 24 reports for 2 residential units.Details
revision to permit #201607081921 - new title 24 reports for 2 residential units. | |
| May 23, 2018 | Completed final sign-off Sep 2023 | 41 Newburg St | Perez Construction Llc. | expand (e)3rd fl w/ 297 sqft addition & add 313 sq ft roof deck @ 3rd fl level. @ street facade, replace/relocate (1)window, @ rear yard replace (1)window & (1)sliding glass door, relocate (1)window. (n)interior stair, renovate (e)kitchen, renovate (2)bath, add(2)bath. ** maher: n/a **Details
expand (e)3rd fl w/ 297 sqft addition & add 313 sq ft roof deck @ 3rd fl level. @ street facade, replace/relocate (1)window, @ rear yard replace (1)window & (1)sliding glass door, relocate (1)window. (n)interior stair, renovate (e)kitchen, renovate (2)bath, add(2)bath. ** maher: n/a ** | $325,000 |
| Mar 2, 2018 | Never finaled issued Mar 2018, no final | 1230 21st Av | rev to 201507313053 replace windows at st facade, remove 2 at windows at north light well, replace 8 at rear yard, replace 1; reduce dormer @ south, add 2 skylights. unit b, 1st fl - relocate w/d, expand kitchen, remove closet, replace closet door. 2nd fl - new laundry location/unit a 2nd fl - revisDetails
rev to 201507313053 replace windows at st facade, remove 2 at windows at north light well, replace 8 at rear yard, replace 1; reduce dormer @ south, add 2 skylights. unit b, 1st fl - relocate w/d, expand kitchen, remove closet, replace closet door. 2nd fl - new laundry location/unit a 2nd fl - revis | $12,000 | |
| Feb 16, 2018 | Completed final sign-off Aug 2018 | 226 Naples St | Roly Construction | 2nd fl - new roof deck on existing roof. new sliding door and window at deck.Details
2nd fl - new roof deck on existing roof. new sliding door and window at deck. | $18,000 |
| Feb 16, 2018 | Completed final sign-off May 2018 | 1546 Waller St | interior renovation of 1 apartment at 1546 waller. renovate (e) kitchen (private use kitchen), renovate (e) bath, add half bath. new space heating and water heating.Details
interior renovation of 1 apartment at 1546 waller. renovate (e) kitchen (private use kitchen), renovate (e) bath, add half bath. new space heating and water heating. | $40,000 | |
| Feb 15, 2018 | Completed final sign-off Aug 2018 | 143 Jersey St | Chavez Plumbing | 3rd fl: renovate master bedroom, relocate master bath.Details
3rd fl: renovate master bedroom, relocate master bath. | $26,000 |
| Feb 1, 2018 | Completed final sign-off Nov 2019 | 72 Uranus Tr | Art Of Italy Inc Dba: Aoi Group | at street facade: replace 3 windows, at north elevation replace 2 windows at west elevation (rear yard) remove 7 windows & 1 door, install 4 windows & 1 door. at south elevation remove 7 windows & install 7 windows. 7 south & 1 north fire rated aluminum frame. all others marvin integrity fiberglassDetails
at street facade: replace 3 windows, at north elevation replace 2 windows at west elevation (rear yard) remove 7 windows & 1 door, install 4 windows & 1 door. at south elevation remove 7 windows & install 7 windows. 7 south & 1 north fire rated aluminum frame. all others marvin integrity fiberglass | $15,000 |
| Dec 19, 2017 | Completed final sign-off Jan 2019 | 544 Natoma St | J & J South West Construction Inc | at ground floor: remove sound insulated double stud partitions and sound insulated doors. at 2 control rooms and one vocal booth. install new double stud sound insulated partitions, new sound insulated doors, and interior finishes in one sound studio space and vocal booth. n/a for maherDetails
at ground floor: remove sound insulated double stud partitions and sound insulated doors. at 2 control rooms and one vocal booth. install new double stud sound insulated partitions, new sound insulated doors, and interior finishes in one sound studio space and vocal booth. n/a for maher | $170,000 |
| Dec 18, 2017 | Expired or cancelled expired Jun 2022 | 1964 Larkin St | new bedroom, bath, closet at 1st. new interior stair from new living space to (e) 2nd flr. new egress cprridor at 1st, at north elevation, new exterior door, increase wall ht at light well, replace wood fence at south light wall new 68 sf one story infillDetails
new bedroom, bath, closet at 1st. new interior stair from new living space to (e) 2nd flr. new egress cprridor at 1st, at north elevation, new exterior door, increase wall ht at light well, replace wood fence at south light wall new 68 sf one story infill | $118,000 | |
| Nov 17, 2017 | Completed final sign-off May 2018 | 111 Caselli Av | Citidev Inc. | interior renovation at third floor; remove segment of partition and install casework at media room . new lighting at media roomDetails
interior renovation at third floor; remove segment of partition and install casework at media room . new lighting at media room | $6,000 |
| Nov 2, 2017 | Completed final sign-off Jun 2018 | 329 San Jose Av | Citidev Inc. | exterior stair at rear yard repaired in kind. no change to stair dimentsion. fence at rear yard replaced with new 6 ft tall wood fence. voluntary foundation upgrades. tme stair is arequired means of egress, no new fire rated walls.Details
exterior stair at rear yard repaired in kind. no change to stair dimentsion. fence at rear yard replaced with new 6 ft tall wood fence. voluntary foundation upgrades. tme stair is arequired means of egress, no new fire rated walls. | $26,000 |
| Sep 7, 2017 | Completed final sign-off Dec 2017 | 685 20th Av | Ho Bok Construction | to comply with physical inspection report cc-8141.remove sunroom enclosure at (e) unit 685 deck.install 42in high wood guardrail facing rear yard. repair (e) property line wall at deck.install new electrical panel to serve common areas. replace (e) small fuse panel in 687.Details
to comply with physical inspection report cc-8141.remove sunroom enclosure at (e) unit 685 deck.install 42in high wood guardrail facing rear yard. repair (e) property line wall at deck.install new electrical panel to serve common areas. replace (e) small fuse panel in 687. | $5,000 |
| Aug 31, 2017 | Never finaled issued Sep 2017, no final | 1544 Waller St | interior renovation of two apts. in each unit renovate exisitng kitchen, renovate existing bath, add half bath. new space & water heating.Details
interior renovation of two apts. in each unit renovate exisitng kitchen, renovate existing bath, add half bath. new space & water heating. | $70,000 | |
| Aug 11, 2017 | Never finaled issued Apr 2018, no final | 1011 Howard St | G C Builders | at ground floor - new trash room within existing envelope. no changes visible from street. n/a maher ordinance. life safety deferred if required.Details
at ground floor - new trash room within existing envelope. no changes visible from street. n/a maher ordinance. life safety deferred if required. | $12,000 |
| Jul 26, 2017 | Completed final sign-off Jul 2018 | 306 Bartlett St | revision to pa 2015-0126-6688. change exterior siding on south, west, and north sides from channel rustic wood siding to fiber cement hardie sidingDetails
revision to pa 2015-0126-6688. change exterior siding on south, west, and north sides from channel rustic wood siding to fiber cement hardie siding | $6,000 | |
| Jul 14, 2017 | Completed final sign-off Jan 2020 | 62 Tioga Av | Lake Marine Construction Inc | horizontal addition. 1-story tal addition at rear yard. add new half bath and washer/dryer.Details
horizontal addition. 1-story tal addition at rear yard. add new half bath and washer/dryer. | $120,000 |
| Jun 30, 2017 | Expired or cancelled expired Jul 2024 | 281 Madison St | Levi's Construction Co | vertical & horizontal extension. renoveation. 1st floor: new light well. remove deck & stair @ rear yard. expand 4'0" @ rear. remove 1 bath. add 2 bathrooms. new interior stair. 2nd floor: new kitchen, bath & interior stair. new deck. add new 3rd floor with bedroom, bath, closet & 2 decks.Details
vertical & horizontal extension. renoveation. 1st floor: new light well. remove deck & stair @ rear yard. expand 4'0" @ rear. remove 1 bath. add 2 bathrooms. new interior stair. 2nd floor: new kitchen, bath & interior stair. new deck. add new 3rd floor with bedroom, bath, closet & 2 decks. | $440,000 |
| Jun 27, 2017 | Expired or cancelled expired Jun 2022 | 1964 Larkin St | renovate one apartment #1964 - relocate kitchen, renovate bath & relocate half bath. at all 3 residential floros - remove one interior wall , install new posts & beams. install new posts, beams & footings at ground floor.Details
renovate one apartment #1964 - relocate kitchen, renovate bath & relocate half bath. at all 3 residential floros - remove one interior wall , install new posts & beams. install new posts, beams & footings at ground floor. | $55,000 | |
| Jun 21, 2017 | Completed final sign-off Jun 2021 | 248 Page St | De Brus Construction Inc, S F Garage Company Inc. | add 3 adu's per ordinance# 162-16 @ ground floor. unit"a": 2 bedroom & 2 baths. unit"b": 1 bedroom & 1 bath. unit "c": 1 bedroom & 1 bath.Details
add 3 adu's per ordinance# 162-16 @ ground floor. unit"a": 2 bedroom & 2 baths. unit"b": 1 bedroom & 1 bath. unit "c": 1 bedroom & 1 bath. | $306,000 |
| Jun 2, 2017 | Completed final sign-off Jul 2019 | 473 Diamond St | Lake Marine Construction Inc | relocate kitchen, remove interior wall & install new beams & posts.Details
relocate kitchen, remove interior wall & install new beams & posts. | $40,000 |
| May 31, 2017 | Completed final sign-off Oct 2018 | 1490 45th Av | Kingfish Construction Llc. | at 2nd flr remove interior walls at kitchen and dining room. (e) light court infill add roof and skylightDetails
at 2nd flr remove interior walls at kitchen and dining room. (e) light court infill add roof and skylight | $9,000 |
| May 30, 2017 | Completed final sign-off May 2022 | 1964 Larkin St | replace 62 windows in kind. windows visible from the street. shall be wood frame aluminum clad "marvin windows)Details
replace 62 windows in kind. windows visible from the street. shall be wood frame aluminum clad "marvin windows) | $31,000 | |
| Apr 14, 2017 | Completed final sign-off Aug 2023 | 3481 Mission St | revision to 2016-1213-4821, change layout at 2nd fl to 2 bedrooms, 1 bath and studio to 1 bedroom 1 bath units. change extg studio to new 1 bedroom apartment instead of studio.Details
revision to 2016-1213-4821, change layout at 2nd fl to 2 bedrooms, 1 bath and studio to 1 bedroom 1 bath units. change extg studio to new 1 bedroom apartment instead of studio. | ||
| Apr 11, 2017 | Completed final sign-off Oct 2017 | 11 Wright St | Grip Art Inc. Dba Jan Heyneker Custom Wk | 2nd floor - remove interior walls and install new posts and beams. renovate kitchen. replace sliding glass door at rear yardDetails
2nd floor - remove interior walls and install new posts and beams. renovate kitchen. replace sliding glass door at rear yard | $30,000 |
| Mar 24, 2017 | Completed final sign-off May 2024 | 1415 South Van Ness Av | Wickman Development And Construction | under add unit per ord 162-16, add (1) (n) adu @ the ground floor with (2) bdrms, (1) bath & (1) kitchen. (6) new windows at side/rear yard. add (n) laundry room. ref soft story permit #2016-0908-7164.Details
under add unit per ord 162-16, add (1) (n) adu @ the ground floor with (2) bdrms, (1) bath & (1) kitchen. (6) new windows at side/rear yard. add (n) laundry room. ref soft story permit #2016-0908-7164. | $117,000 |
| Mar 24, 2017 | Completed final sign-off May 2024 | 1409 South Van Ness Av | Wickman Development And Construction | 1 adu per ord 162-16, add (1) (n) adu @ the ground flr with (2) bdrms, (1) bath & (1) kitchen. (6) new windows at side/rear yard. relocate laundry rm. ref soft story permit #2016-0908-7161.Details
1 adu per ord 162-16, add (1) (n) adu @ the ground flr with (2) bdrms, (1) bath & (1) kitchen. (6) new windows at side/rear yard. relocate laundry rm. ref soft story permit #2016-0908-7161. | $117,000 |
| Mar 17, 2017 | Completed final sign-off Feb 2019 | 215 Santa Ynez Av | at ground floor within extg envelope, remove interior walls, add new bedroom, closet, full bath, half bath. add new inerior stair. 4 new windows at side/rear yard. relocate washer/dryer. replace portion of concrete slab at garage. at 2nd floor renovate extg kitchen. remove one window.Details
at ground floor within extg envelope, remove interior walls, add new bedroom, closet, full bath, half bath. add new inerior stair. 4 new windows at side/rear yard. relocate washer/dryer. replace portion of concrete slab at garage. at 2nd floor renovate extg kitchen. remove one window. | $121,000 | |
| Mar 2, 2017 | Completed final sign-off Feb 2018 | 2927 Broderick St | Citidev Inc. | ground flr: remove (e) brick flue, install new wood framing and concrete footing. at 3rd flr - remove brick ewe and portion of interior walls. install new posts & beams. renovate kitchen, bath and half bathDetails
ground flr: remove (e) brick flue, install new wood framing and concrete footing. at 3rd flr - remove brick ewe and portion of interior walls. install new posts & beams. renovate kitchen, bath and half bath | $70,000 |
| Feb 17, 2017 | Expired or cancelled expired Feb 2025 | 1009 Fell St | Wickman Development And Construction | under ordinance 162-16, add (1)(n) residential unit @ the basement. (2)bed, (1)bath, (6)(n) windows @ rear yard. ** maher: n/a **Details
under ordinance 162-16, add (1)(n) residential unit @ the basement. (2)bed, (1)bath, (6)(n) windows @ rear yard. ** maher: n/a ** | $95,000 |
| Feb 17, 2017 | Never finaled issued Oct 2019, no final | 433 Pierce St | Wickman Development And Construction | under ordinance 162-16, add (1)(n) residential unit @ the basement, studio, (1) bath. (4)(n) windows @ rear yard. (2)(n) windows @ street. ** maher: n/a **Details
under ordinance 162-16, add (1)(n) residential unit @ the basement, studio, (1) bath. (4)(n) windows @ rear yard. (2)(n) windows @ street. ** maher: n/a ** | $110,000 |
| Feb 17, 2017 | Expired or cancelled expired Mar 2026 | 431 Pierce St | Wickman Development And Construction | under ordinance 162-16, add (1)(n) residential unit @ basement. (2) bedroom, (2) bath, (8) windows @ rear yard. ** maher: n/a **Details
under ordinance 162-16, add (1)(n) residential unit @ basement. (2) bedroom, (2) bath, (8) windows @ rear yard. ** maher: n/a ** | $116,000 |
| Jan 17, 2017 | Completed final sign-off Nov 2018 | 423 Faxon Av | Tong Cheong Construction Co | under ord 162-16 add one adu with (1) bdrm, (1)bath, (4) (n) windows and (1) skylight. add 1/2 bath at ground lvl serving the (e) residential unit.Details
under ord 162-16 add one adu with (1) bdrm, (1)bath, (4) (n) windows and (1) skylight. add 1/2 bath at ground lvl serving the (e) residential unit. | $92,000 |
| Jan 13, 2017 | Expired or cancelled expired Feb 2025 | 1017 Fell St | Wickman Development And Construction | under ordinance 162-16 add (1) (n) residential unit @ basement level. unit a: 1 bed, 1 bath. 6 (n) windows @ rear yard.Details
under ordinance 162-16 add (1) (n) residential unit @ basement level. unit a: 1 bed, 1 bath. 6 (n) windows @ rear yard. | $72,000 |
| Dec 29, 2016 | Completed final sign-off Nov 2017 | 155 San Aleso Av | Norcross Building Solutions | at ground flr - add new bathroom, office, closets and w/d within (e) envelope. at 2nd flr - renovate kitchen, 1 bathroom, add second bathroom, replace 15 windows on north side, 5 windows at rear & 1 on south. remove 1 window at rear and 3 at south. add 2 skylights.Details
at ground flr - add new bathroom, office, closets and w/d within (e) envelope. at 2nd flr - renovate kitchen, 1 bathroom, add second bathroom, replace 15 windows on north side, 5 windows at rear & 1 on south. remove 1 window at rear and 3 at south. add 2 skylights. | $96,000 |
| Dec 22, 2016 | Completed final sign-off Apr 2017 | 37 Fairmount St | L E D Construction | 2nd floor: remove portion of interior walls, remove extg kitchen, remove extg 2 windows and 1 door at rear yard. intall new beams,posts, footings and new kitchen. install 3 new windows and one door at rear yard.Details
2nd floor: remove portion of interior walls, remove extg kitchen, remove extg 2 windows and 1 door at rear yard. intall new beams,posts, footings and new kitchen. install 3 new windows and one door at rear yard. | $28,000 |
| Nov 10, 2016 | Never finaled issued Dec 2019, no final | 1126 Pacific Av | under ordinance 162-16: add one adu with one bdrm, one bath. the (n) residential unit shall be equipped with an automatic fire sprinkler system meeting the standards of nfpa 13.Details
under ordinance 162-16: add one adu with one bdrm, one bath. the (n) residential unit shall be equipped with an automatic fire sprinkler system meeting the standards of nfpa 13. | $70,000 | |
| Nov 3, 2016 | Expired or cancelled withdrawn May 2018 | 1964 Larkin St | add new garage within extg ground floor level. add new curb cut and new driveway.Details
add new garage within extg ground floor level. add new curb cut and new driveway. | $40,000 | |
| Oct 19, 2016 | Completed final sign-off Dec 2017 | 160 Marview Wy | Chavez Plumbing | at ground floor, remove bathroom, add new bathroom, bedroom and family room. replace washer and dryer. replace one window facing side yard. at 2nd floor: renovate extg bathrom, remove one bedroom, add walk in closet, and replace 2 windows facing street.Details
at ground floor, remove bathroom, add new bathroom, bedroom and family room. replace washer and dryer. replace one window facing side yard. at 2nd floor: renovate extg bathrom, remove one bedroom, add walk in closet, and replace 2 windows facing street. | $80,000 |
| Sep 8, 2016 | Completed final sign-off May 2024 | 1415 South Van Ness Av | Wickman Development And Construction | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4; adu under permit #201703242338Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4; adu under permit #201703242338 | $56,000 |
| Sep 8, 2016 | Completed final sign-off May 2024 | 1409 South Van Ness Av | Wickman Development And Construction | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $56,000 |
| Aug 15, 2016 | Completed final sign-off Apr 2017 | 909 Haight St | Ac And Company | unit 5: revision to ref pa 201607081908: install new gas furnance 80% afve and new aire ducts with r6 insluationDetails
unit 5: revision to ref pa 201607081908: install new gas furnance 80% afve and new aire ducts with r6 insluation | $7,000 |
| Aug 11, 2016 | Completed final sign-off Nov 2021 | 130 Saint Germain Av | Ramos General Construction Inc. | renovation & addition to single family house. addition is underneath the (e) house. renovate & expand 2nd fl to include master bedroom, (2) baths, bedroom, office, laundry. add (n) 1st fl with (2) bedrooms, (2)baths. (n) interior stair.Details
renovation & addition to single family house. addition is underneath the (e) house. renovate & expand 2nd fl to include master bedroom, (2) baths, bedroom, office, laundry. add (n) 1st fl with (2) bedrooms, (2)baths. (n) interior stair. | $380,000 |
| Jul 8, 2016 | Completed final sign-off Apr 2017 | 909 Haight St | Ac And Company | unit 5: interior renovation in 1 apartment. renovate kitchen, replace bath fixtures, add new shower, expand opening in 1 interior wallDetails
unit 5: interior renovation in 1 apartment. renovate kitchen, replace bath fixtures, add new shower, expand opening in 1 interior wall | $19,000 |
| Jul 8, 2016 | Completed final sign-off Oct 2022 | 3574 17th St | Citidev Inc. | under ord 30-15. add 2 new residential units at the grd floor. unit "a" 1 bedroom, 1 bath with office. unit "b" 1 bedroom, 1 bath. soft story appl #2016-0630-1274. sprinklers to nfpa-13 on deferred submittal.Details
under ord 30-15. add 2 new residential units at the grd floor. unit "a" 1 bedroom, 1 bath with office. unit "b" 1 bedroom, 1 bath. soft story appl #2016-0630-1274. sprinklers to nfpa-13 on deferred submittal. | $160,000 |
| Jun 7, 2016 | Completed final sign-off Sep 2016 | 3574 17th St | Citidev Inc. | revision to pa #201512175371 - at street facade ground floor level change exterior wall finish to stucco with decorative reveal pattern. remove one wall opening.Details
revision to pa #201512175371 - at street facade ground floor level change exterior wall finish to stucco with decorative reveal pattern. remove one wall opening. | $1,000 |