Dewell Built Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2013 to Jun 2021
- Last 24 months
- 0 permits filed
15 permits since 2000: 12 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2021 | Never finaled issued Aug 2021, no final | 1468 Grove St | revision to pa 2019-0807-8122 new soft floor framing and dry rotDetails
revision to pa 2019-0807-8122 new soft floor framing and dry rot | $7,000 |
| Aug 22, 2020 | Completed final sign-off Jan 2021 | 16 Hillway Av | revision to pa 201608175231. modification to previously approved rear deck and stair to grade.Details
revision to pa 201608175231. modification to previously approved rear deck and stair to grade. | |
| Jul 16, 2020 | Completed final sign-off Feb 2021 | 3824 18th St | kitchen & (2) bathrooms remodel; upgradingDetails
kitchen & (2) bathrooms remodel; upgrading | $36,000 |
| Jan 17, 2020 | Expired or cancelled cancelled Jan 2026 | 16 Hillway Av | revision to permit # 2016-0817-5231: t-24 replace. radiant floor to repace furnace/ forced air.Details
revision to permit # 2016-0817-5231: t-24 replace. radiant floor to repace furnace/ forced air. | |
| Aug 7, 2019 | Completed final sign-off Nov 2021 | 1468 Grove St | interior only: remodel of existing bathroom in condo unit. exercise room floor repair. rodent proofing in mech space/cellar storage.Details
interior only: remodel of existing bathroom in condo unit. exercise room floor repair. rodent proofing in mech space/cellar storage. | $25,000 |
| Jul 15, 2019 | Completed final sign-off Oct 2019 | 776 17th Av | bathroom remodeling/upgrade, electrical, plumbing, new shower pan.Details
bathroom remodeling/upgrade, electrical, plumbing, new shower pan. | $15,000 |
| May 31, 2019 | Completed final sign-off Jan 2020 | 49 Prospect Av | interior renovation at 1st fl - convert existing storage and utility rooms to a bedroom and bathroomDetails
interior renovation at 1st fl - convert existing storage and utility rooms to a bedroom and bathroom | $28,000 |
| Aug 17, 2016 | Completed final sign-off Jan 2021 | 16 Hillway Av | third story rear addition to include first floor office & bathroom, second floor family room addition, powder room and deck, third floor bathroom, laundry closet and bathroom.Details
third story rear addition to include first floor office & bathroom, second floor family room addition, powder room and deck, third floor bathroom, laundry closet and bathroom. | $50,000 |
| May 27, 2015 | Completed final sign-off Sep 2015 | 163 Wood St | masterbath remodeling / guest bath remodeling. electrical & plumbing under seperate permit.Details
masterbath remodeling / guest bath remodeling. electrical & plumbing under seperate permit. | $14,000 |
| Apr 21, 2015 | Completed final sign-off Sep 2015 | 28 05th Av | remodel 1 bathroom; to comply with cec150.0(k)5Details
remodel 1 bathroom; to comply with cec150.0(k)5 | $12,000 |
| Mar 17, 2015 | Completed final sign-off May 2015 | 136 Mateo St | bathroom remodel - shower pan, plumbing and electrical upgrade, new lighting fan, vanityDetails
bathroom remodel - shower pan, plumbing and electrical upgrade, new lighting fan, vanity | $5,500 |
| Mar 17, 2015 | Completed final sign-off Sep 2015 | 634 Missouri St | unit c - upper unit: kitchen remodel, two bathrooms remodels - new cabinets, appliances, bathrs upgrading fixtures, tile, bath tubs, vanitiesDetails
unit c - upper unit: kitchen remodel, two bathrooms remodels - new cabinets, appliances, bathrs upgrading fixtures, tile, bath tubs, vanities | $10,400 |
| Aug 20, 2014 | Completed final sign-off Nov 2014 | 16 Hillway Av | removing non-load bearing bedroom wall, framing new bedroom wall with separate entrance & doorway.Details
removing non-load bearing bedroom wall, framing new bedroom wall with separate entrance & doorway. | $3,000 |
| Mar 18, 2014 | Never finaled issued Mar 2014, no final | 3379 22nd St | bathroom remodeling on 2nd floor.Details
bathroom remodeling on 2nd floor. | $16,000 |
| Nov 25, 2013 | Completed final sign-off Jan 2014 | 62 Bridgeview Dr | dryrot repair, bolting bottom plate to concrete foundation, stucco repair front facde replace in kind.Details
dryrot repair, bolting bottom plate to concrete foundation, stucco repair front facde replace in kind. | $6,000 |