Northward Construction
- Based in
- Pacifica
- On San Francisco permits
- Dec 2016 to Oct 2022
- Last 24 months
- 0 permits filed
11 permits since 2000: 11 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 14, 2022 | Completed final sign-off Jun 2023 | 8 Ardenwood Wy | 2nd fl: renovation (e) full bathroom. add shower to (e) half bath. replace window not visible from st.Details
2nd fl: renovation (e) full bathroom. add shower to (e) half bath. replace window not visible from st. | $18,000 |
| Jul 14, 2022 | Completed final sign-off Aug 2022 | 1374 18th Av | repair face of house to return to as-is condition.replace post, door frame, stucco, to comply with nov 202288799Details
repair face of house to return to as-is condition.replace post, door frame, stucco, to comply with nov 202288799 | $7,000 |
| May 12, 2021 | Completed final sign-off Aug 2021 | 1234 11th Av | as-is bathroom remodel.Details
as-is bathroom remodel. | $15,000 |
| Nov 19, 2020 | Completed final sign-off Oct 2021 | 322 Virginia Av | bathroom remodel - as-is toilet, vanity, sink, shower pan, exhaust fan, 1 gpci/circuit, 3 light fixtures.Details
bathroom remodel - as-is toilet, vanity, sink, shower pan, exhaust fan, 1 gpci/circuit, 3 light fixtures. | $25,000 |
| Jun 11, 2020 | Completed final sign-off Oct 2020 | 767 Panorama Dr | remodel 2 bathrooms, remodel 1 powder room, remodel 1 kitchen.Details
remodel 2 bathrooms, remodel 1 powder room, remodel 1 kitchen. | $100,000 |
| Oct 10, 2019 | Completed final sign-off Oct 2021 | 80 Clairview Ct | new living space at ground fl, in existing envelope. 1 bedroom, 1 bath, laundry. new furnace & water heater. replace exterior door at rear yard. 200 amp service upgrade. relocate main drain waste vent stack.Details
new living space at ground fl, in existing envelope. 1 bedroom, 1 bath, laundry. new furnace & water heater. replace exterior door at rear yard. 200 amp service upgrade. relocate main drain waste vent stack. | $36,000 |
| Jun 6, 2019 | Completed final sign-off Dec 2019 | 3833 18th St | remodel two bathrooms. one on the second and one on the third floor.Details
remodel two bathrooms. one on the second and one on the third floor. | $16,000 |
| Feb 12, 2019 | Completed final sign-off Jul 2020 | 8 Ardenwood Wy | replace 2 windows in kind & remove 1 window @ south side elevation. replace 1 window in kind at light court. renovate existing kitchen. add half bath. replace furnace and water heaterDetails
replace 2 windows in kind & remove 1 window @ south side elevation. replace 1 window in kind at light court. renovate existing kitchen. add half bath. replace furnace and water heater | $48,000 |
| Nov 13, 2017 | Completed final sign-off Oct 2018 | 3028 Buchanan St | bath remodel - replace (e) tub/shower, vanity, tub and window with (n) in same locations. remove pony wall & reverse door swing. replace light fixtures with newDetails
bath remodel - replace (e) tub/shower, vanity, tub and window with (n) in same locations. remove pony wall & reverse door swing. replace light fixtures with new | $15,000 |
| Feb 15, 2017 | Completed final sign-off Apr 2017 | 58 Tioga Av | repair/replace tile on 1st landing of front stairs in kind for kind. reuse existing terrazzo and tile. no expansion or change to stair dimensionsDetails
repair/replace tile on 1st landing of front stairs in kind for kind. reuse existing terrazzo and tile. no expansion or change to stair dimensions | $5,000 |
| Dec 19, 2016 | Completed final sign-off Dec 2017 | 122 Hugo St | renovation of extg 3rd floor unit. renovation of extg bath and new kitchen, new bath. replace 2nd floor windows like for like.Details
renovation of extg 3rd floor unit. renovation of extg bath and new kitchen, new bath. replace 2nd floor windows like for like. | $60,000 |