Block 4881, lot 026
5945 03rd St
- City’s use
- Industrial
- Built
- 1985
- Stories
- 1
- Building
- 2,985 sq ft
- Zoning
- PDR2
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 6, 2025 | Completed final sign-off Feb 2025 | 5945 03rd St | unit c-revision 202412197144- to remove the remodel of the 1st floor bathroom from the scope of work to revise the da checklist to indicate an (e) condition serving the area of remodel fully comply with access requirements no further upgrades required or performedDetails
unit c-revision 202412197144- to remove the remodel of the 1st floor bathroom from the scope of work to revise the da checklist to indicate an (e) condition serving the area of remodel fully comply with access requirements no further upgrades required or performed | ||
| Dec 19, 2024 | In progress issued Dec 2024 | 5945 03rd St | unit c; all work to be done on existing 2nd flr. new doors and interior windows at existing second floor counseling room - no structural work.Details
unit c; all work to be done on existing 2nd flr. new doors and interior windows at existing second floor counseling room - no structural work. | $20,000 | |
| Sep 7, 2023 | Expired or cancelled withdrawn Dec 2024 | 5945 03rd St | Ehj Construction,Inc., R. C. Construction | tenant improvement: new counseling room at ground floor. new doors adn interior windows at (e) second floor counseling rooms - no structural work.Details
tenant improvement: new counseling room at ground floor. new doors adn interior windows at (e) second floor counseling rooms - no structural work. | $26,700 |
| Mar 22, 2012 | Completed final sign-off Apr 2012 | 5945 03rd St | R. C. Construction | revision to pa# 2012-0309-5756-upgrade (e) ground floor restroom to accessible restroom, upgrade (e) stair guardrails, add 90 minute rated door. relocate (e) entry gate/doorDetails
revision to pa# 2012-0309-5756-upgrade (e) ground floor restroom to accessible restroom, upgrade (e) stair guardrails, add 90 minute rated door. relocate (e) entry gate/door | $19,800 |
| Mar 9, 2012 | Completed final sign-off Apr 2012 | 5945 03rd St | R. C. Construction | #c: change of use: existing office space in "s-2" occupancy change to "b" occupancy and partial s-2Details
#c: change of use: existing office space in "s-2" occupancy change to "b" occupancy and partial s-2 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- R. C. Construction (3), Ehj Construction,Inc.
- Architects
- David Cumby (3), Cumby Architecture
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.