Sheehan Construction Solutions
- Based in
- San Francisco
- On San Francisco permits
- Jan 2018 to Aug 2021
- Last 24 months
- 0 permits filed
13 permits since 2000: 6 completed, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2021 | Never finaled filed Aug 2021, never issued | 266 32nd Av | addition to (e) 3-story bldg.extend ground floor 10' horizontally into back yard. build-out 2nd and 3rd floor to be flush with (e) rear wall. rebuild & reconfigure existing roof deck. replace (e) rooftop trellis with glass penthouse for internal stair access to roof level.Details
addition to (e) 3-story bldg.extend ground floor 10' horizontally into back yard. build-out 2nd and 3rd floor to be flush with (e) rear wall. rebuild & reconfigure existing roof deck. replace (e) rooftop trellis with glass penthouse for internal stair access to roof level. | $350,000 |
| Apr 16, 2021 | Completed final sign-off Mar 2022 | 867 25th Av | remodel 2x bathrooms- new insulation, sheetrock and tile- 80 sq ft- no moving walls.Details
remodel 2x bathrooms- new insulation, sheetrock and tile- 80 sq ft- no moving walls. | $9,000 |
| Oct 1, 2020 | Completed final sign-off Sep 2021 | 365 04th Av | administrative permit to correct address on pa 202009103850Details
administrative permit to correct address on pa 202009103850 | $15,000 |
| Oct 1, 2020 | Expired or cancelled withdrawn Mar 2022 | 1335 Divisadero St | revision to permit application #201508053439 - reduce scope of work of original permit. existing interior partitions, stair, and mechanical equipment to remain. no new living space at ground floorDetails
revision to permit application #201508053439 - reduce scope of work of original permit. existing interior partitions, stair, and mechanical equipment to remain. no new living space at ground floor | |
| Sep 23, 2020 | Never finaled issued Sep 2020, no final | 2904 California St | unit 2. bathroom remodel - tile, insulation, sheetrockDetails
unit 2. bathroom remodel - tile, insulation, sheetrock | $4,000 |
| Sep 10, 2020 | Completed final sign-off Sep 2021 | 363 04th Av | bathroom remodel of upper unit & new kitchen cabinetsDetails
bathroom remodel of upper unit & new kitchen cabinets | $5,000 |
| Jan 14, 2020 | Completed final sign-off May 2020 | 614 28th Av | replace stucco at front facade to match (e) stucco (not smooth). no other work under this permit.Details
replace stucco at front facade to match (e) stucco (not smooth). no other work under this permit. | $15,000 |
| Nov 14, 2019 | Expired or cancelled withdrawn Jun 2021 | 1678 Fulton St | revision to 201803204114, 1st fl. change 1/2 bath to utility room, utility room to full bath, closet to laundry closet, new closet at living rm, dining rm, 2nd fl reconfigure location of baths and closets, eliminate officeDetails
revision to 201803204114, 1st fl. change 1/2 bath to utility room, utility room to full bath, closet to laundry closet, new closet at living rm, dining rm, 2nd fl reconfigure location of baths and closets, eliminate office | |
| Oct 25, 2019 | Expired or cancelled withdrawn Oct 2023 | 35 Broad St | add (n) 3rd story. create (n) 3rd story rear deck. convert (e) stairway to 3rd flr and add (n) 2nd stairs to rear. addition of one unit. ** maher: n/a **Details
add (n) 3rd story. create (n) 3rd story rear deck. convert (e) stairway to 3rd flr and add (n) 2nd stairs to rear. addition of one unit. ** maher: n/a ** | $100,000 |
| May 21, 2019 | Never finaled issued May 2019, no final | 1678 Fulton St | street spaceDetails
street space | |
| Mar 20, 2018 | Completed final sign-off Jul 2021 | 1678 Fulton St | interior remodel, convert 1st fl. storage to living room, kitchen, half bath, utility room, convert 2nd fl. to three bedrooms, 2 full baths and officeDetails
interior remodel, convert 1st fl. storage to living room, kitchen, half bath, utility room, convert 2nd fl. to three bedrooms, 2 full baths and office | $100,000 |
| Feb 21, 2018 | Completed final sign-off Sep 2018 | 266 32nd Av | all work in garage only. replace overhead door and back door, extend mechanical closet, add trash closet and finish ceiling.Details
all work in garage only. replace overhead door and back door, extend mechanical closet, add trash closet and finish ceiling. | $10,000 |
| Jan 31, 2018 | Never finaled issued Feb 2018, no final | 45 Broad St | remove and replace extg foundation. reinforce 1st floor wood diaphgram. n/a for maherDetails
remove and replace extg foundation. reinforce 1st floor wood diaphgram. n/a for maher | $20,000 |