Back to bathroom remodel contractors
Sheehan Construction Solutions
- Based in
- San Francisco
- On San Francisco permits
- Jan 2018 to Aug 2021
- Last 24 months
- 0 permits filed
13 permits since 2000: 6 completed, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 376 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2021 | Completed final sign-off Mar 2022 | 867 25th Av | remodel 2x bathrooms- new insulation, sheetrock and tile- 80 sq ft- no moving walls.Details
remodel 2x bathrooms- new insulation, sheetrock and tile- 80 sq ft- no moving walls. | $9,000 |
| Sep 23, 2020 | Never finaled issued Sep 2020, no final | 2904 California St | unit 2. bathroom remodel - tile, insulation, sheetrockDetails
unit 2. bathroom remodel - tile, insulation, sheetrock | $4,000 |
| Sep 10, 2020 | Completed final sign-off Sep 2021 | 363 04th Av | bathroom remodel of upper unit & new kitchen cabinetsDetails
bathroom remodel of upper unit & new kitchen cabinets | $5,000 |
| Nov 14, 2019 | Expired or cancelled withdrawn Jun 2021 | 1678 Fulton St | revision to 201803204114, 1st fl. change 1/2 bath to utility room, utility room to full bath, closet to laundry closet, new closet at living rm, dining rm, 2nd fl reconfigure location of baths and closets, eliminate officeDetails
revision to 201803204114, 1st fl. change 1/2 bath to utility room, utility room to full bath, closet to laundry closet, new closet at living rm, dining rm, 2nd fl reconfigure location of baths and closets, eliminate office | |
| Mar 20, 2018 | Completed final sign-off Jul 2021 | 1678 Fulton St | interior remodel, convert 1st fl. storage to living room, kitchen, half bath, utility room, convert 2nd fl. to three bedrooms, 2 full baths and officeDetails
interior remodel, convert 1st fl. storage to living room, kitchen, half bath, utility room, convert 2nd fl. to three bedrooms, 2 full baths and office | $100,000 |