M J C Construction
- Based in
- San Mateo
- On San Francisco permits
- Jan 2014 to Jun 2023
- Last 24 months
- 0 permits filed
22 permits since 2000: 22 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2023 | Completed final sign-off Sep 2023 | 3517 Sacramento St | remodel kitchen, bathroom, and half bathroomDetails
remodel kitchen, bathroom, and half bathroom | $40,000 |
| Mar 6, 2020 | Completed final sign-off Nov 2020 | 28 Nebraska St | remove old lath and plaster from walls on top floor; 2nd floor kitchen and bath. replace with sheetrock with insulation and 5/8 gypboard. type "x" remodel kitchen(100sqft) & bathroom(80 sqft)Details
remove old lath and plaster from walls on top floor; 2nd floor kitchen and bath. replace with sheetrock with insulation and 5/8 gypboard. type "x" remodel kitchen(100sqft) & bathroom(80 sqft) | $30,000 |
| Mar 6, 2020 | Completed final sign-off Nov 2020 | 28 Nebraska St | 2nd fl remove wall between kitchen & dining room. infill lightwell at bathroom. replace front windows w/ casements. gr fl e storage rooms and full bathDetails
2nd fl remove wall between kitchen & dining room. infill lightwell at bathroom. replace front windows w/ casements. gr fl e storage rooms and full bath | $45,000 |
| Feb 11, 2020 | Completed final sign-off Feb 2020 | 428 Lyon St | his inspector requested a rated egresss corridor. permit to build 2 rated walls, 2 doors to resolve compliaint 202009251Details
his inspector requested a rated egresss corridor. permit to build 2 rated walls, 2 doors to resolve compliaint 202009251 | $400 |
| Nov 19, 2019 | Completed final sign-off Jan 2021 | 22 22nd Av | window and exterior door replacement in-kind. new windows and doors will be wood.Details
window and exterior door replacement in-kind. new windows and doors will be wood. | $200,000 |
| Oct 8, 2019 | Completed final sign-off Jan 2021 | 22 22nd Av | revision to permit #201909171804. additional work to include the conversion of a 1st fl storage space to a conditioned workout room and install installation of radiant floor heating throughout. 1st fl bedroom shall also be removed. maher naDetails
revision to permit #201909171804. additional work to include the conversion of a 1st fl storage space to a conditioned workout room and install installation of radiant floor heating throughout. 1st fl bedroom shall also be removed. maher na | $30,000 |
| Sep 23, 2019 | Completed final sign-off Jan 2021 | 22 22nd Av | remediation of dryrot and termite damage to exterior building envelope and structural framing. work to include repair and or replacement in kind of e exterior waterproofing,plaster, trim, decorative detailing, downspouts, roofing and framing as required. replacement of entry patio waterproofing andDetails
remediation of dryrot and termite damage to exterior building envelope and structural framing. work to include repair and or replacement in kind of e exterior waterproofing,plaster, trim, decorative detailing, downspouts, roofing and framing as required. replacement of entry patio waterproofing and | $30,000 |
| Sep 17, 2019 | Completed final sign-off Jan 2021 | 22 22nd Av | interior remodel - remodel (e) baths & kitchen, removal & addition of new baths; convert (e) basement storage space workout room; no exterior work is proposed. relocation of interior partitions and finishes & minor structural work. (e) furnace to remainDetails
interior remodel - remodel (e) baths & kitchen, removal & addition of new baths; convert (e) basement storage space workout room; no exterior work is proposed. relocation of interior partitions and finishes & minor structural work. (e) furnace to remain | $1,500,000 |
| Aug 28, 2019 | Completed final sign-off Jan 2021 | 22 22nd Av | top 2 floors -replace lath & plaster w/ 5/8" gypboard with 5d coolernials @ 4 " on center or equivalent screws. remove some asbestos. no remodelling.Details
top 2 floors -replace lath & plaster w/ 5/8" gypboard with 5d coolernials @ 4 " on center or equivalent screws. remove some asbestos. no remodelling. | $39,000 |
| Mar 18, 2019 | Completed final sign-off Mar 2020 | 428 Lyon St | interior reno of all 3 levels plus abatement of nov 201896283 - provide smoke and carbon monoxide detctors, provide fire extinguishers type 2a 10bc & provide self closing devices & primary locking device @ exterior doors. comply with nov 201896283 items 3, 4 and 5Details
interior reno of all 3 levels plus abatement of nov 201896283 - provide smoke and carbon monoxide detctors, provide fire extinguishers type 2a 10bc & provide self closing devices & primary locking device @ exterior doors. comply with nov 201896283 items 3, 4 and 5 | $400,000 |
| Jan 30, 2019 | Completed final sign-off Feb 2020 | 428 Lyon St | kitchen remodel. no walls added removedDetails
kitchen remodel. no walls added removed | $18,500 |
| Dec 4, 2018 | Completed final sign-off Nov 2020 | 22 22nd Av | relocation of (e) entry columns and entry along 22nd ave to align w/ main entry of house. rebuild entry stairs to connect to (e) entry stair. rebuild portion of (e) wall along prop line at 22nd ave. reconfig (e) retaining wall along north prop lineDetails
relocation of (e) entry columns and entry along 22nd ave to align w/ main entry of house. rebuild entry stairs to connect to (e) entry stair. rebuild portion of (e) wall along prop line at 22nd ave. reconfig (e) retaining wall along north prop line | $30,000 |
| Aug 1, 2018 | Completed final sign-off Jan 2019 | 1706 17th Av | bathroom and kitchen renovation 1st fl including new bathrm, conversion of 159 sf storage to habitable living infill portion of (e) interior patio for habitable space, new roofingDetails
bathroom and kitchen renovation 1st fl including new bathrm, conversion of 159 sf storage to habitable living infill portion of (e) interior patio for habitable space, new roofing | $24,000 |
| Nov 15, 2016 | Completed final sign-off Mar 2017 | 246 Detroit St | bathroom remodel with no changes to floor plan. update plumbing, replace all bathroom fixtures, lighting, fan and all electrical, retile and paint.Details
bathroom remodel with no changes to floor plan. update plumbing, replace all bathroom fixtures, lighting, fan and all electrical, retile and paint. | $30,000 |
| Aug 3, 2016 | Completed final sign-off Apr 2018 | 980 Baker St | unit 2 - interior demo of (e) 2nd flr area for new stair opening. proposed stair to connect 1st & 2nd flrs. configuration of new wall at 1st - new bedroom/bath/closet/ new egress windows at rear. l/s, mep under separate permit.Details
unit 2 - interior demo of (e) 2nd flr area for new stair opening. proposed stair to connect 1st & 2nd flrs. configuration of new wall at 1st - new bedroom/bath/closet/ new egress windows at rear. l/s, mep under separate permit. | $100,000 |
| Jul 6, 2016 | Completed final sign-off Dec 2016 | 10 22nd Av | partial lower level remodel. remodel 2 baths and adding a shower.Details
partial lower level remodel. remodel 2 baths and adding a shower. | $20,000 |
| Apr 19, 2016 | Completed final sign-off Dec 2016 | 10 22nd Av | reconfigure kitchen/pantry, add bath in library at existing plumbing location, reconfigure hall and closets, remodel existing baths, laundry room addition, minor remodeling and casework throughout; revision to permit 201603104742.Details
reconfigure kitchen/pantry, add bath in library at existing plumbing location, reconfigure hall and closets, remodel existing baths, laundry room addition, minor remodeling and casework throughout; revision to permit 201603104742. | $137,200 |
| Mar 18, 2016 | Completed final sign-off Jan 2017 | 625 Jarboe Av | substitution of shotcrete for cast-in-place concrete. revision to app#201512094531Details
substitution of shotcrete for cast-in-place concrete. revision to app#201512094531 | |
| Mar 10, 2016 | Completed final sign-off Aug 2016 | 10 22nd Av | soft demo kitchen, bath, millwork, removal living, second level and basement. replace in kind. all new lighting shall be led.Details
soft demo kitchen, bath, millwork, removal living, second level and basement. replace in kind. all new lighting shall be led. | $5,000 |
| Mar 10, 2016 | Completed final sign-off Aug 2016 | 10 22nd Av | window replacement within existing opennigs. 81 sash to match original. marvin true divided-light sash.Details
window replacement within existing opennigs. 81 sash to match original. marvin true divided-light sash. | $150,000 |
| Feb 20, 2015 | Completed final sign-off Apr 2015 | 2 Montalvo Av | to obtain final inspection for work approved under pa#201303283314. all work is complete.Details
to obtain final inspection for work approved under pa#201303283314. all work is complete. | |
| Jan 8, 2014 | Completed final sign-off Apr 2014 | 527 14th Av | replace all windows with new marvin clad windows (aluminum clad wood). street facing, 29 windowsDetails
replace all windows with new marvin clad windows (aluminum clad wood). street facing, 29 windows | $40,000 |