Back to bathroom remodel contractors
M J C Construction
- Based in
- San Mateo
- On San Francisco permits
- Jan 2014 to Jun 2023
- Last 24 months
- 0 permits filed
22 permits since 2000: 22 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 10 completed. Typically 2 days from filing to permit and 163 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2023 | Completed final sign-off Sep 2023 | 3517 Sacramento St | remodel kitchen, bathroom, and half bathroomDetails
remodel kitchen, bathroom, and half bathroom | $40,000 |
| Mar 6, 2020 | Completed final sign-off Nov 2020 | 28 Nebraska St | remove old lath and plaster from walls on top floor; 2nd floor kitchen and bath. replace with sheetrock with insulation and 5/8 gypboard. type "x" remodel kitchen(100sqft) & bathroom(80 sqft)Details
remove old lath and plaster from walls on top floor; 2nd floor kitchen and bath. replace with sheetrock with insulation and 5/8 gypboard. type "x" remodel kitchen(100sqft) & bathroom(80 sqft) | $30,000 |
| Mar 6, 2020 | Completed final sign-off Nov 2020 | 28 Nebraska St | 2nd fl remove wall between kitchen & dining room. infill lightwell at bathroom. replace front windows w/ casements. gr fl e storage rooms and full bathDetails
2nd fl remove wall between kitchen & dining room. infill lightwell at bathroom. replace front windows w/ casements. gr fl e storage rooms and full bath | $45,000 |
| Sep 17, 2019 | Completed final sign-off Jan 2021 | 22 22nd Av | interior remodel - remodel (e) baths & kitchen, removal & addition of new baths; convert (e) basement storage space workout room; no exterior work is proposed. relocation of interior partitions and finishes & minor structural work. (e) furnace to remainDetails
interior remodel - remodel (e) baths & kitchen, removal & addition of new baths; convert (e) basement storage space workout room; no exterior work is proposed. relocation of interior partitions and finishes & minor structural work. (e) furnace to remain | $1,500,000 |
| Aug 1, 2018 | Completed final sign-off Jan 2019 | 1706 17th Av | bathroom and kitchen renovation 1st fl including new bathrm, conversion of 159 sf storage to habitable living infill portion of (e) interior patio for habitable space, new roofingDetails
bathroom and kitchen renovation 1st fl including new bathrm, conversion of 159 sf storage to habitable living infill portion of (e) interior patio for habitable space, new roofing | $24,000 |
| Nov 15, 2016 | Completed final sign-off Mar 2017 | 246 Detroit St | bathroom remodel with no changes to floor plan. update plumbing, replace all bathroom fixtures, lighting, fan and all electrical, retile and paint.Details
bathroom remodel with no changes to floor plan. update plumbing, replace all bathroom fixtures, lighting, fan and all electrical, retile and paint. | $30,000 |
| Aug 3, 2016 | Completed final sign-off Apr 2018 | 980 Baker St | unit 2 - interior demo of (e) 2nd flr area for new stair opening. proposed stair to connect 1st & 2nd flrs. configuration of new wall at 1st - new bedroom/bath/closet/ new egress windows at rear. l/s, mep under separate permit.Details
unit 2 - interior demo of (e) 2nd flr area for new stair opening. proposed stair to connect 1st & 2nd flrs. configuration of new wall at 1st - new bedroom/bath/closet/ new egress windows at rear. l/s, mep under separate permit. | $100,000 |
| Jul 6, 2016 | Completed final sign-off Dec 2016 | 10 22nd Av | partial lower level remodel. remodel 2 baths and adding a shower.Details
partial lower level remodel. remodel 2 baths and adding a shower. | $20,000 |
| Apr 19, 2016 | Completed final sign-off Dec 2016 | 10 22nd Av | reconfigure kitchen/pantry, add bath in library at existing plumbing location, reconfigure hall and closets, remodel existing baths, laundry room addition, minor remodeling and casework throughout; revision to permit 201603104742.Details
reconfigure kitchen/pantry, add bath in library at existing plumbing location, reconfigure hall and closets, remodel existing baths, laundry room addition, minor remodeling and casework throughout; revision to permit 201603104742. | $137,200 |
| Mar 10, 2016 | Completed final sign-off Aug 2016 | 10 22nd Av | soft demo kitchen, bath, millwork, removal living, second level and basement. replace in kind. all new lighting shall be led.Details
soft demo kitchen, bath, millwork, removal living, second level and basement. replace in kind. all new lighting shall be led. | $5,000 |