Block 1337, lot 021
22 22nd Ave
- City’s use
- Single Family Residential
- Built
- 1926
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 7 bathrooms
- Building
- 7,465 sq ft
- Lot
- 10,440 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 19, 2019 | Completed final sign-off Jan 2021 | 22 22nd Av | M J C Construction | window and exterior door replacement in-kind. new windows and doors will be wood.Details
window and exterior door replacement in-kind. new windows and doors will be wood. | $200,000 |
| Oct 8, 2019 | Completed final sign-off Jan 2021 | 22 22nd Av | M J C Construction | revision to permit #201909171804. additional work to include the conversion of a 1st fl storage space to a conditioned workout room and install installation of radiant floor heating throughout. 1st fl bedroom shall also be removed. maher naDetails
revision to permit #201909171804. additional work to include the conversion of a 1st fl storage space to a conditioned workout room and install installation of radiant floor heating throughout. 1st fl bedroom shall also be removed. maher na | $30,000 |
| Sep 23, 2019 | Completed final sign-off Jan 2021 | 22 22nd Av | M J C Construction | remediation of dryrot and termite damage to exterior building envelope and structural framing. work to include repair and or replacement in kind of e exterior waterproofing,plaster, trim, decorative detailing, downspouts, roofing and framing as required. replacement of entry patio waterproofing andDetails
remediation of dryrot and termite damage to exterior building envelope and structural framing. work to include repair and or replacement in kind of e exterior waterproofing,plaster, trim, decorative detailing, downspouts, roofing and framing as required. replacement of entry patio waterproofing and | $30,000 |
| Sep 17, 2019 | Completed final sign-off Jan 2021 | 22 22nd Av | M J C Construction | interior remodel - remodel (e) baths & kitchen, removal & addition of new baths; convert (e) basement storage space workout room; no exterior work is proposed. relocation of interior partitions and finishes & minor structural work. (e) furnace to remainDetails
interior remodel - remodel (e) baths & kitchen, removal & addition of new baths; convert (e) basement storage space workout room; no exterior work is proposed. relocation of interior partitions and finishes & minor structural work. (e) furnace to remain | $1,500,000 |
| Aug 28, 2019 | Completed final sign-off Jan 2021 | 22 22nd Av | M J C Construction | top 2 floors -replace lath & plaster w/ 5/8" gypboard with 5d coolernials @ 4 " on center or equivalent screws. remove some asbestos. no remodelling.Details
top 2 floors -replace lath & plaster w/ 5/8" gypboard with 5d coolernials @ 4 " on center or equivalent screws. remove some asbestos. no remodelling. | $39,000 |
| Aug 16, 2019 | Never finaled issued Aug 2019, no final | 22 22nd Av | street spaceDetails
street space | ||
| Dec 4, 2018 | Completed final sign-off Nov 2020 | 22 22nd Av | M J C Construction | relocation of (e) entry columns and entry along 22nd ave to align w/ main entry of house. rebuild entry stairs to connect to (e) entry stair. rebuild portion of (e) wall along prop line at 22nd ave. reconfig (e) retaining wall along north prop lineDetails
relocation of (e) entry columns and entry along 22nd ave to align w/ main entry of house. rebuild entry stairs to connect to (e) entry stair. rebuild portion of (e) wall along prop line at 22nd ave. reconfig (e) retaining wall along north prop line | $30,000 |
| Sep 21, 2017 | Never finaled issued Nov 2018, no final | 22 22nd Av | remodel to (e) single family home. garage to be lowered to match level of (e) basement . exterior deck added at level 1 on east facade. **comply w/ maher **Details
remodel to (e) single family home. garage to be lowered to match level of (e) basement . exterior deck added at level 1 on east facade. **comply w/ maher ** | $983,832 | |
| Oct 1, 2007 | Never finaled issued Oct 2007, no final | 22 22nd Av | sidewalk repairDetails
sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- M J C Construction (6)
- Architects
- Jonathan Feldman (4)
- Engineers
- Donald David
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.