Block 0062, lot 032
454 Lombard St
- City’s use
- Single Family Residential
- Built
- 1974
- Stories
- 1
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 1,150 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 14, 2018 | Never finaled issued Aug 2018, no final | 454 Lombard St | street spaceDetails
street space | ||
| Jul 6, 2018 | Completed final sign-off Nov 2018 | 454 Lombard St | Andrew Chekene Enterprises/ Dba Ac Enter | revision to 201802080783 change to joistsDetails
revision to 201802080783 change to joists | $7,000 |
| Jun 7, 2018 | Never finaled issued Jun 2018, no final | 454 Lombard St | street spaceDetails
street space | ||
| May 11, 2018 | Expired or cancelled withdrawn Dec 2018 | 454 Lombard St | Andrew Chekene Enterprises/ Dba Ac Enter | revision to 201802080783: replace post 2x 10 x 16ft and 4x4 post on front & rear balcony.Details
revision to 201802080783: replace post 2x 10 x 16ft and 4x4 post on front & rear balcony. | $8,000 |
| Apr 4, 2018 | Never finaled issued Apr 2018, no final | 454 Lombard St | street spaceDetails
street space | ||
| Feb 8, 2018 | Completed final sign-off Nov 2018 | 454 Lombard St | Andrew Chekene Enterprises/ Dba Ac Enter | revision to pa 2017-0809-4298 - repair front and rear balconies per plan. plans to reflect window replacement under pa 2017-1213-6410 for lightwell #1 and lightwell #2 (11 windows total) comply with sfdbi info s-10.Details
revision to pa 2017-0809-4298 - repair front and rear balconies per plan. plans to reflect window replacement under pa 2017-1213-6410 for lightwell #1 and lightwell #2 (11 windows total) comply with sfdbi info s-10. | $30,000 |
| Jan 23, 2018 | Never finaled issued Jan 2018, no final | 454 Lombard St | street spaceDetails
street space | ||
| Dec 13, 2017 | Completed final sign-off Nov 2018 | 454 Lombard St | Andrew Chekene Enterprises/ Dba Ac Enter | rev. to app# 2017-08-09-4298. remodel (e) (2) lightwells vinyl windows and replace in kind in both lightwellsDetails
rev. to app# 2017-08-09-4298. remodel (e) (2) lightwells vinyl windows and replace in kind in both lightwells | $10,000 |
| Nov 13, 2017 | Never finaled issued Nov 2017, no final | 454 Lombard St | street spaceDetails
street space | ||
| Aug 17, 2017 | Completed final sign-off Aug 2018 | 454 Lombard St | Andrew Chekene Enterprises/ Dba Ac Enter | soft story retrofit pser sfebc chapter 4d, 2016 cebc appendix a-4, new type shear walls, steel column retrofit inside garage at 6 location and steel column retrofit at front of building at 2 location.Details
soft story retrofit pser sfebc chapter 4d, 2016 cebc appendix a-4, new type shear walls, steel column retrofit inside garage at 6 location and steel column retrofit at front of building at 2 location. | $40,000 |
| Aug 9, 2017 | Completed final sign-off Nov 2018 | 454 Lombard St | Andrew Chekene Enterprises/ Dba Ac Enter | repair front and rear balconies per plans in kind. repair 2 lightwells per plans. common area onlyDetails
repair front and rear balconies per plans in kind. repair 2 lightwells per plans. common area only | $120,000 |
| May 29, 2014 | Completed final sign-off Dec 2014 | 454 Lombard St | Rod Muscio Electrical | replace fire alarm like for like. provide elevator recall and shutdown . common areaDetails
replace fire alarm like for like. provide elevator recall and shutdown . common area | $20,000 |
| Jan 16, 2014 | Never finaled issued Jan 2014, no final | 454 Lombard St | Saarman Construction,Ltd. | remove portions of the extg finishes at 1st,2nd, and 3rd floors. rear balconiesat 454 lombard in order to access the structural integrity of the extg framing by structural engineer. repair in like kind. less than 50%. does not effect work at egress.Details
remove portions of the extg finishes at 1st,2nd, and 3rd floors. rear balconiesat 454 lombard in order to access the structural integrity of the extg framing by structural engineer. repair in like kind. less than 50%. does not effect work at egress. | $6,000 |
| Jan 14, 2013 | Never finaled issued Jan 2013, no final | 454 Lombard St | street spaceDetails
street space | ||
| Dec 12, 2012 | Completed final sign-off Jul 2013 | 454 Lombard St | Andrew Chekene Enterprises/ Dba Ac Enter | strengthen/stiffer front cantilivered deks: at first level.install new cntilered steel channels alongside (e) steel centerline w-16 beam to supply (e) cantilevered wood beam. work on common area.Details
strengthen/stiffer front cantilivered deks: at first level.install new cntilered steel channels alongside (e) steel centerline w-16 beam to supply (e) cantilevered wood beam. work on common area. | $3,000 |
| Nov 23, 2010 | Completed final sign-off Mar 2011 | 454 Lombard St | San Francisco Fire Protection | emergency fire panel replacement.Details
emergency fire panel replacement. | $700 |
| Oct 4, 2010 | Completed final sign-off Nov 2010 | 454 Lombard St | Hai's Roofing Company | reroofingDetails
reroofing | $40,000 |
| Oct 1, 2010 | Completed final sign-off Oct 2010 | 454 Lombard St | Rain Defense | tear-off all concrete and fix same, dry-rotted & joist floor. replace with waterproofing membrane, thin-set concrete & flashing. (no tile work), balcony size 3'x25'.Details
tear-off all concrete and fix same, dry-rotted & joist floor. replace with waterproofing membrane, thin-set concrete & flashing. (no tile work), balcony size 3'x25'. | $1,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Andrew Chekene Enterprises/ Dba Ac Enter (7), Hai's Roofing Company, Rain Defense, Rod Muscio Electrical, Saarman Construction,Ltd., San Francisco Fire Protection
- Engineers
- Jason Pisano, Michael Hom
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.