10 permits since 2000 (engineer on 10 permits): 7 completed, 2 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- C B 2 Builders Incorporated (2), Got Power Inc Dba C D & Power (2), American Technologies Inc, Ewsf Inc., J H Construction, Level Land Builders Inc., Narrowback Construction Co., Twenty Two Group World Inc
- Architects
- Gregor Markel (2), Karl Danielson, Matt Hollis
- Engineers
- Mansour Firouzian (3), Dorel Anghel (2), Donald David, Engin Yagmur, Jason Pisano, Leslie Homan
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 7
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 5, 2026 | In progress issued Nov 2026 | 570 Townsend St | Ewsf Inc. | r/r (e) restrooms and make 7 ada restrooms. relocate front stair and isntall new ada platform lift.. voluntary structural strengthening. install new windows, roll-up door, bike ra-ck & locker. replace (e) metal roof in-kind. change use from retial to to r&d lab.Details
r/r (e) restrooms and make 7 ada restrooms. relocate front stair and isntall new ada platform lift.. voluntary structural strengthening. install new windows, roll-up door, bike ra-ck & locker. replace (e) metal roof in-kind. change use from retial to to r&d lab. | $836,500 |
| Jun 3, 2025 | In progress issued May 2026 | 498 Beach St | Level Land Builders Inc. | tenant improvement of a 5,102sf food truck renovation, full restaurant use located at northeast corner of jones & beach in fisherman's wharf. project will provide 5 food truck stalls with designated entry points for each truck.Details
tenant improvement of a 5,102sf food truck renovation, full restaurant use located at northeast corner of jones & beach in fisherman's wharf. project will provide 5 food truck stalls with designated entry points for each truck. | $250,000 |
| May 22, 2024 | Completed final sign-off May 2025 | 1333 Bush St | C B 2 Builders Incorporated | ti of existing commercial kitchen. addition of new two compartment prep sinks, relocate existing station, addition of two gfci receptacles in existing dry storage room and associated breakers in existing electrical panels. replace finishes as needed.Details
ti of existing commercial kitchen. addition of new two compartment prep sinks, relocate existing station, addition of two gfci receptacles in existing dry storage room and associated breakers in existing electrical panels. replace finishes as needed. | $20,000 |
| Jan 31, 2023 | Completed final sign-off Aug 2024 | 1000 Montgomery St | C B 2 Builders Incorporated | revision to pa# 202102044020. deficiencies in several (e) fire barries & partitions were discovered that were approved as part of pa# 8405871 & pa# 8715181 but not installed in their entirety. scope of this project is to repair those deficiencies & bring them back up to level & detail.Details
revision to pa# 202102044020. deficiencies in several (e) fire barries & partitions were discovered that were approved as part of pa# 8405871 & pa# 8715181 but not installed in their entirety. scope of this project is to repair those deficiencies & bring them back up to level & detail. | $600,000 |
| Feb 14, 2018 | Completed final sign-off Sep 2019 | 35 San Juan Av | American Technologies Inc | fire/smoke damage repair. work includes, windows (like for like), drywall, ele, insulation, plm, cabinets, countertops, ada upgrades such as ramp to front door, hand rail, bathrooms, hvac including ductwork, roofing (1 sq patch) maher naDetails
fire/smoke damage repair. work includes, windows (like for like), drywall, ele, insulation, plm, cabinets, countertops, ada upgrades such as ramp to front door, hand rail, bathrooms, hvac including ductwork, roofing (1 sq patch) maher na | $145,000 |
| Jan 6, 2017 | Never finaled issued Mar 2017, no final | 2379 Chestnut St | J H Construction | upgrade electrical service. reference pa# 2016/04/08/4307. ** maher: n/a **Details
upgrade electrical service. reference pa# 2016/04/08/4307. ** maher: n/a ** | $4,000 |
| Apr 21, 2014 | Completed final sign-off Sep 2015 | 101 Townsend St | Narrowback Construction Co. | new restrooms & hvac for warm shell. new windows @ 2nd & 3rd floor. new glass roll up doors. paint & patch exterior. new roof deck with stair & elevator penthouses. ** maher: compliance with ordinance no# 155-13 not required **Details
new restrooms & hvac for warm shell. new windows @ 2nd & 3rd floor. new glass roll up doors. paint & patch exterior. new roof deck with stair & elevator penthouses. ** maher: compliance with ordinance no# 155-13 not required ** | $1,500,000 |
| Jul 25, 2013 | Completed final sign-off Apr 2014 | 200 Kansas St | Twenty Two Group World Inc | lighting work only for retail store approved under pa#201305156983 & mechanical work under pa#201306210193Details
lighting work only for retail store approved under pa#201305156983 & mechanical work under pa#201306210193 | $266,266 |
| Apr 30, 2010 | Completed final sign-off Nov 2010 | 100 Pine St | Got Power Inc Dba C D & Power | work @ 8th floor. removing old 250 kw generator & replaceing with new 250 kw generator that meets mission standards setting on existing panel. running 8 ft of double wall fuel line to new 200 gallon fuel tank.Details
work @ 8th floor. removing old 250 kw generator & replaceing with new 250 kw generator that meets mission standards setting on existing panel. running 8 ft of double wall fuel line to new 200 gallon fuel tank. | $100,000 |
| Oct 23, 2009 | Completed final sign-off Jul 2010 | 1099 Fillmore St | Got Power Inc Dba C D & Power | revision to appl #200908064260 - pipe size reduced from 3" to 1-1/4".Details
revision to appl #200908064260 - pipe size reduced from 3" to 1-1/4". |