Got Power Inc Dba C D & Power

Contractor license
757162
State license record
Based in
Martinez
On San Francisco permits
Aug 2009 to May 2017
Last 24 months
0 permits filed

8 permits since 2000: 7 completed, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
May 18, 2017Completed
final sign-off May 2021
333 Baker Stgenerator & concrete pad replacement. no new electrical loads.
Details
Permit
201705186955
Status
complete
Filed
May 18, 2017
Permit issued
Jul 24, 2019
Final sign-off
May 12, 2021
Declared cost
$60,000
Address
333 Baker St

generator & concrete pad replacement. no new electrical loads.

Open the permit page

$60,000
Aug 17, 2016Expired or cancelled
cancelled Feb 2020
832 Folsom Stgenerator (100kw) set & anchored to concrete pad. elec, auto transfer switch, exhaust. ref pa 201603212603. maher n/a.
Details
Permit
201608175199
Status
cancelled
Filed
Aug 17, 2016
Declared cost
$50,000
Address
832 Folsom St

generator (100kw) set & anchored to concrete pad. elec, auto transfer switch, exhaust. ref pa 201603212603. maher n/a.

Open the permit page

$50,000
Sep 24, 2012Completed
final sign-off Feb 2013
888 Brannan Stlift generator with 325 gallon integral double-walled tank into place and anchor within existing outdoor room, run generator exhaust and vents up above roof line 12 feet above grade.
Details
Permit
201209240452
Status
complete
Filed
Sep 24, 2012
Permit issued
Sep 25, 2012
Final sign-off
Feb 7, 2013
Declared cost
$100,000
Address
888 Brannan St

lift generator with 325 gallon integral double-walled tank into place and anchor within existing outdoor room, run generator exhaust and vents up above roof line 12 feet above grade.

Open the permit page

$100,000
Nov 22, 2011Completed
final sign-off Nov 2012
750 02nd St1st & 8th floors-refer to pa# 2008-0731-8072-install fill port material, dual piping, transfer switch, remote annunicator, 2 day tanks, 30kw generator estop & everything necessary for generator install for back-up elevator.
Details
Permit
201111229429
Status
complete
Filed
Nov 22, 2011
Permit issued
Dec 12, 2011
Final sign-off
Nov 27, 2012
Declared cost
$150,000
Address
750 02nd St

1st & 8th floors-refer to pa# 2008-0731-8072-install fill port material, dual piping, transfer switch, remote annunicator, 2 day tanks, 30kw generator estop & everything necessary for generator install for back-up elevator.

Open the permit page

$150,000
Apr 30, 2010Completed
final sign-off Nov 2010
100 Pine Stwork @ 8th floor. removing old 250 kw generator & replaceing with new 250 kw generator that meets mission standards setting on existing panel. running 8 ft of double wall fuel line to new 200 gallon fuel tank.
Details
Permit
201004301414
Status
complete
Filed
Apr 30, 2010
Permit issued
Jul 30, 2010
Final sign-off
Nov 30, 2010
Declared cost
$100,000
Address
100 Pine St

work @ 8th floor. removing old 250 kw generator & replaceing with new 250 kw generator that meets mission standards setting on existing panel. running 8 ft of double wall fuel line to new 200 gallon fuel tank.

Open the permit page

$100,000
Oct 30, 2009Completed
final sign-off Jul 2010
1099 Fillmore Strevision pa# 2009-0806-4260-will be replacing a concrete pad under approved generator
Details
Permit
200910300240
Status
complete
Filed
Oct 30, 2009
Permit issued
Oct 30, 2009
Final sign-off
Jul 22, 2010
Declared cost
$4,000
Address
1099 Fillmore St

revision pa# 2009-0806-4260-will be replacing a concrete pad under approved generator

Open the permit page

$4,000
Oct 23, 2009Completed
final sign-off Jul 2010
1099 Fillmore Strevision to appl #200908064260 - pipe size reduced from 3" to 1-1/4".
Details
Permit
200910239691
Status
complete
Filed
Oct 23, 2009
Permit issued
Oct 23, 2009
Final sign-off
Jul 23, 2010
Address
1099 Fillmore St

revision to appl #200908064260 - pipe size reduced from 3" to 1-1/4".

Open the permit page

Aug 6, 2009Completed
final sign-off Jul 2010
1099 Fillmore Stinstall generator upon (e) concrete pad.bolt down using read head type wedge anchors.new 2" conduit four 3/0 and one #1 wire to feed from generator to new 400 amp ats, from main service to new too amp ats. new 400 amp emerg panel.new 2"conduit with four 3/0 & #1 wire to feed from 400 amp emerg panel
Details
Permit
200908064260
Status
complete
Filed
Aug 6, 2009
Permit issued
Sep 24, 2009
Final sign-off
Jul 22, 2010
Declared cost
$175,000
Address
1099 Fillmore St

install generator upon (e) concrete pad.bolt down using read head type wedge anchors.new 2" conduit four 3/0 and one #1 wire to feed from generator to new 400 amp ats, from main service to new too amp ats. new 400 amp emerg panel.new 2"conduit with four 3/0 & #1 wire to feed from 400 amp emerg panel

Open the permit page

$175,000