Block 3780, lot 006
888 Brannan St
- City’s use
- Commercial Retail
- Built
- 1920
- Stories
- 4
- Rooms
- 8 bathrooms
- Building
- 112,470 sq ft
- Lot
- 31,588 sq ft
- Zoning
- UMU
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 29, 2026 | In progress issued Nov 2026 | 888 Brannan St | Source Planning And Construction Inc | revision to pa #202609107888 include non-structural and finish work of new all gender restrooms, egress door and path of travel upgrades. new permit revision to include change to restroom layout and relocation of proposed egress door due to on-site conflicts.Details
revision to pa #202609107888 include non-structural and finish work of new all gender restrooms, egress door and path of travel upgrades. new permit revision to include change to restroom layout and relocation of proposed egress door due to on-site conflicts. | |
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 888 Brannan St | 1st floor:interior demolition of non-structural elements & new construction of 4 all gender restrooms & new ada upgrades for pot. no changes to exterior bldg, site, landscape, use, or bldg structure are proposed. mep, life safety, fire alarm and sprinkler modifications are under seperate permits.Details
1st floor:interior demolition of non-structural elements & new construction of 4 all gender restrooms & new ada upgrades for pot. no changes to exterior bldg, site, landscape, use, or bldg structure are proposed. mep, life safety, fire alarm and sprinkler modifications are under seperate permits. | $250,000 | |
| Sep 10, 2026 | In progress issued Sep 2026 | 888 Brannan St | Source Planning And Construction Inc | 1/fl-scope of work consist of selective interior demo of no strutural elements and new construction of all gender restrooms and new egress door from tenant suite. new ada upgrades for building path of travel. no change to building structure or exterior. please withdraw 202503202668 prior to issuancDetails
1/fl-scope of work consist of selective interior demo of no strutural elements and new construction of all gender restrooms and new egress door from tenant suite. new ada upgrades for building path of travel. no change to building structure or exterior. please withdraw 202503202668 prior to issuanc | $250,000 |
| Jun 24, 2026 | Completed final sign-off Aug 2026 | 888 Brannan St | Novo Construction Inc | 2nd fl interior tenant improvement to include construction of non structural non rated partition and doorDetails
2nd fl interior tenant improvement to include construction of non structural non rated partition and door | $71,725 |
| Apr 29, 2026 | In progress issued May 2026 | 888 Brannan St | Novo Construction Inc | electrical work at 2nd, 3rd, and 4th floors.Details
electrical work at 2nd, 3rd, and 4th floors. | $35,000 |
| Apr 29, 2026 | Completed final sign-off Jun 2026 | 888 Brannan St | Novo Construction Inc | 1/f: electrical work for tenant improvement on the 1st floor storage area. ref arch 202604078996.Details
1/f: electrical work for tenant improvement on the 1st floor storage area. ref arch 202604078996. | $15,000 |
| Apr 7, 2026 | Completed final sign-off Jun 2026 | 888 Brannan St | Novo Construction Inc | 1st fl - interior tenant improvement to include selective demo and construction of non-structural partitions and finishes. elect/lighting under separate permitDetails
1st fl - interior tenant improvement to include selective demo and construction of non-structural partitions and finishes. elect/lighting under separate permit | $85,000 |
| Feb 24, 2026 | Completed final sign-off Jun 2026 | 888 Brannan St | Novo Construction Inc | 4th fl ref pa #2026-0107-3338: deferred electricalDetails
4th fl ref pa #2026-0107-3338: deferred electrical | $15,000 |
| Feb 17, 2026 | Completed final sign-off Jun 2026 | 888 Brannan St | Novo Construction Inc | 4th fl - mechanical work for ti ref pa 202601073338Details
4th fl - mechanical work for ti ref pa 202601073338 | $60,000 |
| Jan 7, 2026 | Completed final sign-off Jun 2026 | 888 Brannan St | Novo Construction Inc | 4th fl - interior ti to include selective demolition and construction of non-structural partitions, finishes, ceiling and millwork. mech/elec under separate permitDetails
4th fl - interior ti to include selective demolition and construction of non-structural partitions, finishes, ceiling and millwork. mech/elec under separate permit | $350,000 |
| Mar 20, 2025 | Expired or cancelled withdrawn Sep 2026 | 888 Brannan St | Alsterlind Construction Inc. | 1/fl- suite 101- ti includes the demo and removal of interior finishes and furnishings changing banquet tables to booths and painting.Details
1/fl- suite 101- ti includes the demo and removal of interior finishes and furnishings changing banquet tables to booths and painting. | $18,000 |
| Jul 26, 2024 | In progress issued Jul 2024 | 888 Brannan St | Giampolini & Co Dba Giampolini/Courtney | exterior maintenance at non-historic elevations flat wall concrete spall repair consisting of matcheng mortar (back of building)Details
exterior maintenance at non-historic elevations flat wall concrete spall repair consisting of matcheng mortar (back of building) | $75,000 |
| Feb 22, 2024 | Completed final sign-off Apr 2024 | 888 Brannan St | Pyro-Comm Systems, Inc. | 3/f: 2 new speaker strobes, 1 speaker strobe to be relocated to provide proper coverage ref 202311130708Details
3/f: 2 new speaker strobes, 1 speaker strobe to be relocated to provide proper coverage ref 202311130708 | $1,500 |
| Feb 15, 2024 | In progress filed Feb 2024, not yet issued | 888 Brannan St | dish: install (3)(n) antennas, (6)(n) rrvs, (1)(n) cabinet rack, (1)(n) emon-omon; no batteries proposed.Details
dish: install (3)(n) antennas, (6)(n) rrvs, (1)(n) cabinet rack, (1)(n) emon-omon; no batteries proposed. | $125,000 | |
| Feb 14, 2024 | Expired or cancelled withdrawn Mar 2024 | 888 Brannan St | Pyro-Comm Systems, Inc. | ref pa# 2023-1113-0708. fire alarm as built to show 3 added strobes in phone room; 2 relay module for door drop and heat pump, 1 duct detector for heat pump, 2 duct detector for 2fsd removed.Details
ref pa# 2023-1113-0708. fire alarm as built to show 3 added strobes in phone room; 2 relay module for door drop and heat pump, 1 duct detector for heat pump, 2 duct detector for 2fsd removed. | |
| Jan 25, 2024 | In progress issued Jan 2024 | 888 Brannan St | Pioneer Fire Inc. | 3/f: relocate (2) sprinkler headsDetails
3/f: relocate (2) sprinkler heads | $300 |
| Jan 19, 2024 | Completed final sign-off Apr 2024 | 888 Brannan St | Novo Construction Inc | 3/f: mechanical and electrical work for tenant improvement on 3rd flr, ref pa# 202312112268.Details
3/f: mechanical and electrical work for tenant improvement on 3rd flr, ref pa# 202312112268. | $42,000 |
| Jan 5, 2024 | In progress issued Feb 2024 | 888 Brannan St | Hathaway Dinwiddie Co. | 4th floor: revise pa #202308164591 to include increased occupancy to gathering space and revised furniture configuration.Details
4th floor: revise pa #202308164591 to include increased occupancy to gathering space and revised furniture configuration. | |
| Dec 11, 2023 | In progress issued Dec 2023 | 888 Brannan St | Novo Construction Inc | 3/f: selective demolition and construction of non-load bearing partitions, modifications to existing ceiling and tile. mep deferred.Details
3/f: selective demolition and construction of non-load bearing partitions, modifications to existing ceiling and tile. mep deferred. | $379,482 |
| Nov 13, 2023 | Completed final sign-off Mar 2024 | 888 Brannan St | Pyro-Comm Systems, Inc. | fire alarm: 3 relay modules, 2 duct detectors, 3 speaker strobes to be added to provide proper coverage. ref#: 202308164591Details
fire alarm: 3 relay modules, 2 duct detectors, 3 speaker strobes to be added to provide proper coverage. ref#: 202308164591 | $4,000 |
| Sep 28, 2023 | Completed final sign-off Apr 2024 | 888 Brannan St | Hathaway Dinwiddie Co. | deferred submittal for bpa #202308164591 for frp strip installation in portion of 4th floor slab.Details
deferred submittal for bpa #202308164591 for frp strip installation in portion of 4th floor slab. | |
| Sep 26, 2023 | In progress issued Jan 2024 | 888 Brannan St | Mastec Network Solutions Inc | run(n) 2" inner-duct from mpoe to the existing 4"conduit chute at the basement level,run(n) 2"conduit run from the penthouse telco room to the proposed (n)ciena.Details
run(n) 2" inner-duct from mpoe to the existing 4"conduit chute at the basement level,run(n) 2"conduit run from the penthouse telco room to the proposed (n)ciena. | $25,000 |
| Aug 16, 2023 | Completed final sign-off Apr 2024 | 888 Brannan St | Hathaway Dinwiddie Co. | 4th fl - ti including construction of new non-structural partitions, new accoustical grid & tile ceilings & gyp board ceilings; new electrical & lighting, new finishes throughout, new mech, electrical & plumbing equipmentDetails
4th fl - ti including construction of new non-structural partitions, new accoustical grid & tile ceilings & gyp board ceilings; new electrical & lighting, new finishes throughout, new mech, electrical & plumbing equipment | $1,500,000 |
| Sep 1, 2022 | Completed final sign-off Aug 2024 | 888 Brannan St | Mastec Network Solutions Inc | remove/replace 6 (e) antenna w/ 6 new antennas. remove/replace three (3) existing rru radios w/3 new radios; install three (3) new rrus, diplexers + hybrid cables. install two (2) new battery and euipment cabinets (4) total; remove/repacle 50a breaker w/ new 100 amp break panel inside electrical rmDetails
remove/replace 6 (e) antenna w/ 6 new antennas. remove/replace three (3) existing rru radios w/3 new radios; install three (3) new rrus, diplexers + hybrid cables. install two (2) new battery and euipment cabinets (4) total; remove/repacle 50a breaker w/ new 100 amp break panel inside electrical rm | $40,000 |
| Dec 9, 2021 | Completed final sign-off Jan 2023 | 888 Brannan St | Ariel-10, Inc, Xclusive Wireless Resources Llc. | decomissioning of sprint antennas and cabinets only with related cablingDetails
decomissioning of sprint antennas and cabinets only with related cabling | $12,000 |
| Feb 18, 2021 | Never finaled issued Apr 2021, no final | 888 Brannan St | 1/f atrium & courtyard: plans submitted for administrative permit - sffd review only. for review and approval prior to submittal for assembly permit. maher n/a.Details
1/f atrium & courtyard: plans submitted for administrative permit - sffd review only. for review and approval prior to submittal for assembly permit. maher n/a. | ||
| Oct 22, 2020 | Completed final sign-off Oct 2021 | 888 Brannan St | Lewis M Merlo Inc | replacment of concrete parapet, severly deteriorated with a new concrete parapet. 20lf along wall is falling hazard. we request expedited approval on an emergency basis.Details
replacment of concrete parapet, severly deteriorated with a new concrete parapet. 20lf along wall is falling hazard. we request expedited approval on an emergency basis. | $5,000 |
| Oct 22, 2020 | Expired or cancelled withdrawn Aug 2022 | 888 Brannan St | t-mobile: proposed modification to an (e) telecom facility: removing 3(e) antennas and replacing w/ 3(n) ones, installing 3(n) antennas, 1 per sector, installing 3(n) radios behind antennas on (e) frame, installing 1(n) bb6630 and 1(n) bb6648 baseband unit inside (e)cabinet, removing all coax & tmasDetails
t-mobile: proposed modification to an (e) telecom facility: removing 3(e) antennas and replacing w/ 3(n) ones, installing 3(n) antennas, 1 per sector, installing 3(n) radios behind antennas on (e) frame, installing 1(n) bb6630 and 1(n) bb6648 baseband unit inside (e)cabinet, removing all coax & tmas | $25,000 | |
| Jul 26, 2019 | Never finaled issued Jul 2019, no final | 888 Brannan St | H C I Systems Inc | to obtain final inspection for work approved under pa 201604154934. all work is completeDetails
to obtain final inspection for work approved under pa 201604154934. all work is complete | |
| May 7, 2019 | Expired or cancelled cancelled Aug 2023 | 888 Brannan St | assembly permit associated w/ previously approved pa 201711284918 for construction of a cafeteria. new work limited to additional exit signs, railings at egress paths. determine occupant load for a2 cafe/dining area.Details
assembly permit associated w/ previously approved pa 201711284918 for construction of a cafeteria. new work limited to additional exit signs, railings at egress paths. determine occupant load for a2 cafe/dining area. | $500 | |
| Apr 4, 2019 | Completed final sign-off Aug 2019 | 888 Brannan St | Pyro-Comm Systems, Inc. | fire alarm ti 3 new 6 series mount strobes 33 l series ceiling mount speaker/strobes 1 l series wall new 2 speaker/strobe to be aded to existing facu ref pa 2019-0130-1670Details
fire alarm ti 3 new 6 series mount strobes 33 l series ceiling mount speaker/strobes 1 l series wall new 2 speaker/strobe to be aded to existing facu ref pa 2019-0130-1670 | $18,500 |
| Feb 1, 2019 | Completed final sign-off Feb 2019 | 888 Brannan St | Pyro-Comm Systems, Inc. | 5th fl - fire alarm ti 2 smoke detectors, 1 ceiling speaker strobe to be added to existing facu. ref pa 2018-1219-8818Details
5th fl - fire alarm ti 2 smoke detectors, 1 ceiling speaker strobe to be added to existing facu. ref pa 2018-1219-8818 | $1,500 |
| Jan 10, 2019 | Completed final sign-off Feb 2020 | 888 Brannan St | Bevilacqua & Sons | patch & paint exterior of tower to match existing. replace 20x20 roof; replace access ladder within tower, replace cornice in-kindDetails
patch & paint exterior of tower to match existing. replace 20x20 roof; replace access ladder within tower, replace cornice in-kind | $328,000 |
| Jan 9, 2019 | Completed final sign-off Jan 2019 | 888 Brannan St | Pyro-Comm Systems, Inc. | suite 119- fire alarm ti - add 1 strobe to be hooked up to (e) facuDetails
suite 119- fire alarm ti - add 1 strobe to be hooked up to (e) facu | $500 |
| Dec 19, 2018 | Completed final sign-off Mar 2019 | 888 Brannan St | Novo Construction Inc | assembly permit for the 5th floor cafe/dining area in an extg commercial bldg. addition of 1 smoke door. package is being submitted for review by fire department to obtain a assembly permit. n/a for maherDetails
assembly permit for the 5th floor cafe/dining area in an extg commercial bldg. addition of 1 smoke door. package is being submitted for review by fire department to obtain a assembly permit. n/a for maher | $5,000 |
| Nov 9, 2018 | Never finaled issued Nov 2018, no final | 888 Brannan St | Pyro-Comm Systems, Inc. | fire alarm ti for #1160: 1 new speaker strobe (new), relocate 1 existing speaker strobe to be hooked up to existing facu. ref #201810183626.Details
fire alarm ti for #1160: 1 new speaker strobe (new), relocate 1 existing speaker strobe to be hooked up to existing facu. ref #201810183626. | $500 |
| Nov 9, 2018 | Completed final sign-off Nov 2018 | 888 Brannan St | All Star Fire Protection Llc | using t.i. outlet for 21 recessed sprinkler on prep t-bar ceiling. ref app#201810183626. n/a for maherDetails
using t.i. outlet for 21 recessed sprinkler on prep t-bar ceiling. ref app#201810183626. n/a for maher | $5,500 |
| Oct 25, 2018 | Never finaled issued Oct 2018, no final | 888 Brannan St | Shaughnessy Roofing Inc | street space | $56,500 |
| Oct 18, 2018 | Completed final sign-off Jan 2019 | 888 Brannan St | H&L Custom Builders Inc | installing show cases, flooring, some walls for dividers and minor electrical. demo (e) windows, relocation of one entry door. install new windows. t.i. all interior work. no change to exterior. no hvac under this permit.Details
installing show cases, flooring, some walls for dividers and minor electrical. demo (e) windows, relocation of one entry door. install new windows. t.i. all interior work. no change to exterior. no hvac under this permit. | $45,000 |
| Aug 15, 2018 | Expired or cancelled cancelled Jan 2026 | 888 Brannan St | Novo Construction Inc | 5th fl: fire only for review of dining area for assembly permit. ref arch pa #201711284918.Details
5th fl: fire only for review of dining area for assembly permit. ref arch pa #201711284918. | |
| Jul 27, 2018 | Completed final sign-off May 2021 | 888 Brannan St | Betacom, Incorporated | tmobile install 3 additional antennas, 3 rru-32, 3 hydbrid cables, all on rooftop modificationDetails
tmobile install 3 additional antennas, 3 rru-32, 3 hydbrid cables, all on rooftop modification | $20,000 |
| Jul 23, 2018 | Expired or cancelled cancelled Jan 2026 | 888 Brannan St | this is a permit for change of occupancy in an existing commercial office building on a single floor only. no construction work done. assembly space (dining space) for employee use only as accessory to bldg. refernce pa #201711284918.Details
this is a permit for change of occupancy in an existing commercial office building on a single floor only. no construction work done. assembly space (dining space) for employee use only as accessory to bldg. refernce pa #201711284918. | ||
| May 29, 2018 | Completed final sign-off Jul 2018 | 888 Brannan St | Pyro-Comm Systems, Inc. | 5th flr - fa ti - 2 speaker strobes to be hooked up to (e) fa panel ref 201711284918 maher naDetails
5th flr - fa ti - 2 speaker strobes to be hooked up to (e) fa panel ref 201711284918 maher na | $1,000 |
| May 23, 2018 | Completed final sign-off Jul 2018 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | 5th floor: add and relocate fire sprinklers per t.i. 1 add and 3 relocates. ref app#201711284918. n/a for maherDetails
5th floor: add and relocate fire sprinklers per t.i. 1 add and 3 relocates. ref app#201711284918. n/a for maher | $2,100 |
| Apr 23, 2018 | Completed final sign-off Jul 2018 | 888 Brannan St | Pyro-Comm Systems, Inc. | fire alarm ti - pyro com will provide 3 speaker strobes to be connected to existing fa panel, reloacting one device (speaker strobe)Details
fire alarm ti - pyro com will provide 3 speaker strobes to be connected to existing fa panel, reloacting one device (speaker strobe) | $1,600 |
| Jan 4, 2018 | Never finaled issued Jan 2018, no final | 888 Brannan St | street space permit | ||
| Jan 3, 2018 | Never finaled issued Jan 2018, no final | 888 Brannan St | street space | ||
| Nov 28, 2017 | Completed final sign-off Jul 2018 | 888 Brannan St | Novo Construction Inc | tenant improvement 5th fl to include new partitoins, doors, frames, ceiling, finishes, casework. mep sep permitDetails
tenant improvement 5th fl to include new partitoins, doors, frames, ceiling, finishes, casework. mep sep permit | $175,000 |
| Oct 26, 2017 | Completed final sign-off Nov 2017 | 888 Brannan St | Pyro-Comm Systems, Inc. | 2/f- fire alarm revision to pa#201703282505, all new devices will be connected to existing fire alarm system. n/a ordinance #155-13Details
2/f- fire alarm revision to pa#201703282505, all new devices will be connected to existing fire alarm system. n/a ordinance #155-13 | $30,000 |
| Aug 8, 2017 | Completed final sign-off Nov 2017 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | 2nd fl: add (30), relocate (51), and remove (19) fire sprinklers per tenant improvements. ref: #201703201858. maher naDetails
2nd fl: add (30), relocate (51), and remove (19) fire sprinklers per tenant improvements. ref: #201703201858. maher na | $42,525 |
| Aug 2, 2017 | Completed final sign-off Dec 2017 | 888 Brannan St | Novo Construction Inc | mechanical & electrical work for t.i on 2nd fl. ref arch #201703201858. maher naDetails
mechanical & electrical work for t.i on 2nd fl. ref arch #201703201858. maher na | $250,000 |
| Mar 29, 2017 | Completed final sign-off Nov 2018 | 888 Brannan St | Transceive Communications Inc. | to renew expired pa#201312023124 for final inspection. all work is complete.Details
to renew expired pa#201312023124 for final inspection. all work is complete. | |
| Mar 28, 2017 | Completed final sign-off Nov 2017 | 888 Brannan St | Pyro-Comm Systems, Inc. | 2/f- fire alarm ti addition to 2nd fl add fire alarm devices and connect to e fire alarm system 201703201858Details
2/f- fire alarm ti addition to 2nd fl add fire alarm devices and connect to e fire alarm system 201703201858 | $30,000 |
| Mar 20, 2017 | Completed final sign-off Dec 2017 | 888 Brannan St | Novo Construction Inc | 2/f- construction of non-structural partitions, new doors, frames, hardware, millwork, drywall, acoustic banners, finishes and modification of an existing shear wall. n/a ordinance #155-13Details
2/f- construction of non-structural partitions, new doors, frames, hardware, millwork, drywall, acoustic banners, finishes and modification of an existing shear wall. n/a ordinance #155-13 | $2,645,000 |
| Feb 17, 2017 | Expired or cancelled withdrawn Jun 2021 | 888 Brannan St | install (3) proposed t-mobile rrus; install (2) #2 awg dc conductor cables; install (3) #4 awg dc conductor cables; install (1) #6 awg dc conductor cable.Details
install (3) proposed t-mobile rrus; install (2) #2 awg dc conductor cables; install (3) #4 awg dc conductor cables; install (1) #6 awg dc conductor cable. | $25,000 | |
| Feb 1, 2017 | Completed final sign-off Nov 2017 | 888 Brannan St | Novo Construction Inc | electrical work for ti ref pa 2016-1229-6147Details
electrical work for ti ref pa 2016-1229-6147 | $5,000 |
| Jan 18, 2017 | Completed final sign-off Nov 2017 | 888 Brannan St | Novo Construction Inc | mechanical work for ti. install new transfer fan, reroute (e) duct and grills. install new split system. ref 201612296147. maher naDetails
mechanical work for ti. install new transfer fan, reroute (e) duct and grills. install new split system. ref 201612296147. maher na | $15,000 |
| Dec 29, 2016 | Completed final sign-off Nov 2017 | 888 Brannan St | Novo Construction Inc | 4th flr: ti - includes selective demo, new partitions, new opening at concrete wall to install new fire rated glass system. mep spe permit maher naDetails
4th flr: ti - includes selective demo, new partitions, new opening at concrete wall to install new fire rated glass system. mep spe permit maher na | $300,000 |
| Dec 29, 2016 | Completed final sign-off Feb 2017 | 888 Brannan St | Pyro-Comm Systems, Inc. | 3rd flr: add 3 speaker/strobes, connect to (e) fire alarm system ref 201503201442 maher naDetails
3rd flr: add 3 speaker/strobes, connect to (e) fire alarm system ref 201503201442 maher na | $5,000 |
| Dec 9, 2016 | Never finaled issued Dec 2016, no final | 888 Brannan St | Alwest Fire Protection | 5th fl. install 2 dry sprinklers in new cooler box. maher n/aDetails
5th fl. install 2 dry sprinklers in new cooler box. maher n/a | $1,000 |
| Nov 15, 2016 | Completed final sign-off Jan 2017 | 888 Brannan St | Cool Solutions Manufactoring,Inc | installation of new walk in cooler only on 5th fl adjacent to recently approved unit of same size. n/a maher ord. 155-13Details
installation of new walk in cooler only on 5th fl adjacent to recently approved unit of same size. n/a maher ord. 155-13 | $10,000 |
| Nov 8, 2016 | Completed final sign-off May 2017 | 888 Brannan St | Pyro-Comm Systems, Inc. | 4th floor: t.i. add 2 nac appliances. relocate 3 extg nac appliances. connect to extg fire alarm system. ref app#201607192713. n/a for maherDetails
4th floor: t.i. add 2 nac appliances. relocate 3 extg nac appliances. connect to extg fire alarm system. ref app#201607192713. n/a for maher | $3,000 |
| Oct 25, 2016 | Completed final sign-off Jan 2018 | 888 Brannan St | Novo Construction Inc | 4th flr: electrical work for ti ref 201607192713 maher naDetails
4th flr: electrical work for ti ref 201607192713 maher na | $20,000 |
| Oct 17, 2016 | Completed final sign-off Jan 2018 | 888 Brannan St | Novo Construction Inc | mechanical for ti on the 4th floor. ref pa 2016-0719-2713Details
mechanical for ti on the 4th floor. ref pa 2016-0719-2713 | $75,000 |
| Sep 26, 2016 | Never finaled issued Sep 2016, no final | 888 Brannan St | Novo Construction Inc | 3rd floor: ti-demo of non structural partitions and finishes maher naDetails
3rd floor: ti-demo of non structural partitions and finishes maher na | $5,000 |
| Aug 11, 2016 | Completed final sign-off Jan 2017 | 888 Brannan St | Anderson, Rowe & Buckley, Inc. | 4th floor: extg fire sprinkler system. t.i. 19 relocated sprinkler. app# 201607192713. n/a for maherDetails
4th floor: extg fire sprinkler system. t.i. 19 relocated sprinkler. app# 201607192713. n/a for maher | $10,000 |
| Aug 2, 2016 | Completed final sign-off May 2017 | 888 Brannan St | Pyro-Comm Systems, Inc. | 4th fl ti addition of 1 relay module and 1 speaker strobe in tenant space buildoutDetails
4th fl ti addition of 1 relay module and 1 speaker strobe in tenant space buildout | $5,000 |
| Jul 19, 2016 | Completed final sign-off Jan 2018 | 888 Brannan St | Novo Construction Inc | tenant improbement on 4th floor to include a presentation space, kitchenette, (4) shared offices spaces. maher na. mep under separate permit.Details
tenant improbement on 4th floor to include a presentation space, kitchenette, (4) shared offices spaces. maher na. mep under separate permit. | $225,000 |
| Jun 21, 2016 | Never finaled issued Jun 2016, no final | 888 Brannan St | Anderson, Rowe & Buckley, Inc. | 4th floor: relocate 2 fire sprinklers ref pa 2016 0428 5929 maher naDetails
4th floor: relocate 2 fire sprinklers ref pa 2016 0428 5929 maher na | $1,000 |
| Jun 20, 2016 | Completed final sign-off Jan 2018 | 888 Brannan St | Novo Construction Inc | reconfigure ducts & grilles for new floor plan. ref pa 2016-0428-5929. maher naDetails
reconfigure ducts & grilles for new floor plan. ref pa 2016-0428-5929. maher na | $3,000 |
| Jun 2, 2016 | Completed final sign-off Dec 2017 | 888 Brannan St | Novo Construction Inc | electrical work for tentant improvementDetails
electrical work for tentant improvement | $3,000 |
| Apr 28, 2016 | Completed final sign-off Oct 2016 | 888 Brannan St | Novo Construction Inc | construction of new breakroom and (4) shared offices. n/a ordinance #155-13Details
construction of new breakroom and (4) shared offices. n/a ordinance #155-13 | $20,000 |
| Apr 27, 2016 | Completed final sign-off May 2016 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | 4th floor: t.i. add 14 sprinklers to protect below extg skylights. n/a for maher.no ref.Details
4th floor: t.i. add 14 sprinklers to protect below extg skylights. n/a for maher.no ref. | $7,840 |
| Apr 15, 2016 | Never finaled issued Apr 2016, no final | 888 Brannan St | H C I Systems Inc | new kitchen & fire suppression system (pyro-chem), install of cabinets, tanks, pull station, detection & piping. reference arch/mep ti #201406300004Details
new kitchen & fire suppression system (pyro-chem), install of cabinets, tanks, pull station, detection & piping. reference arch/mep ti #201406300004 | $4,995 |
| Apr 11, 2016 | Completed final sign-off Apr 2018 | 888 Brannan St | Pyro-Comm Systems, Inc. | 2nd and 3rd floor: new fire alarm devices added to t.i. in extg bldg to includes: 1 power supply, 1 monitor modules, 13 relay modules, 2 voltage relay, 3 smoke detectors, 10 duct detectors, 1 in-duct detector. 40 speaker strobes, & 15 strobes. n/a for maher. mep plans did not show fsd on shaft penDetails
2nd and 3rd floor: new fire alarm devices added to t.i. in extg bldg to includes: 1 power supply, 1 monitor modules, 13 relay modules, 2 voltage relay, 3 smoke detectors, 10 duct detectors, 1 in-duct detector. 40 speaker strobes, & 15 strobes. n/a for maher. mep plans did not show fsd on shaft pen | $34,430 |
| Mar 14, 2016 | Completed final sign-off Jun 2016 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | 2nd & 3rd floor: add 33, relocate 94 sprinklers to conform to the new wall/ceiling layout of tenant improvement. ref #201601197378. n/a maher ordinanceDetails
2nd & 3rd floor: add 33, relocate 94 sprinklers to conform to the new wall/ceiling layout of tenant improvement. ref #201601197378. n/a maher ordinance | $66,040 |
| Feb 22, 2016 | Completed final sign-off Jun 2016 | 888 Brannan St | Novo Construction Inc | mechanical work for ti on the 2nd and 3rd floor. ref pa 2016-0119-7378. maher naDetails
mechanical work for ti on the 2nd and 3rd floor. ref pa 2016-0119-7378. maher na | $275,000 |
| Feb 22, 2016 | Completed final sign-off Feb 2018 | 888 Brannan St | Novo Construction Inc | electrical work for ti on 2nd & 3rd floor. ref pa 2016-0119-7378. maher naDetails
electrical work for ti on 2nd & 3rd floor. ref pa 2016-0119-7378. maher na | $300,000 |
| Feb 1, 2016 | Never finaled issued Feb 2016, no final | 888 Brannan St | street space | ||
| Jan 19, 2016 | Completed final sign-off Mar 2016 | 888 Brannan St | Pyro-Comm Systems, Inc. | new fire alarm devices added for tenant improvement in existing building to include 1 relay module, 1 multi voltage relay for 1st fl elevator lobby turnstile override. ref ti 2015-1201-3809.Details
new fire alarm devices added for tenant improvement in existing building to include 1 relay module, 1 multi voltage relay for 1st fl elevator lobby turnstile override. ref ti 2015-1201-3809. | $1,200 |
| Jan 19, 2016 | Completed final sign-off Jun 2016 | 888 Brannan St | Novo Construction Inc | tenant improvement on the 2nd and 3rd fl to include construction of non structural partitons, doors, frames, hardware, millwork, acoustic, banners, finishes. mep deferredDetails
tenant improvement on the 2nd and 3rd fl to include construction of non structural partitons, doors, frames, hardware, millwork, acoustic, banners, finishes. mep deferred | $2,356,000 |
| Jan 8, 2016 | Completed final sign-off May 2016 | 888 Brannan St | Pioneer Fire Inc. | existing fire sprinkler system ti, added 4 sprinklers. ref pa 2014-0630-0004 (1st floor) n/a maher ordinanceDetails
existing fire sprinkler system ti, added 4 sprinklers. ref pa 2014-0630-0004 (1st floor) n/a maher ordinance | $2,000 |
| Dec 14, 2015 | Completed final sign-off Mar 2016 | 888 Brannan St | Novo Construction Inc | mechanical work install 1 new daikin water source heat pump. relocate thermostat. compliance with maher ordinance no 155-13 not required.Details
mechanical work install 1 new daikin water source heat pump. relocate thermostat. compliance with maher ordinance no 155-13 not required. | $10,000 |
| Dec 1, 2015 | Never finaled issued Dec 2015, no final | 888 Brannan St | Novo Construction Inc | new security turnstiles at existing elevators, relocate an e ada ramp by elevatorsDetails
new security turnstiles at existing elevators, relocate an e ada ramp by elevators | $25,000 |
| Dec 1, 2015 | Expired or cancelled cancelled Jan 2026 | 888 Brannan St | revision to app# 201511193048. scope of work includes revision to the occupancy and exiting plan. n/a for maherDetails
revision to app# 201511193048. scope of work includes revision to the occupancy and exiting plan. n/a for maher | ||
| Nov 30, 2015 | Completed final sign-off Jan 2016 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | 1st floor: as built add 22 heads at cloud ceiling area. ref app#201503201442. n/a for maher.Details
1st floor: as built add 22 heads at cloud ceiling area. ref app#201503201442. n/a for maher. | $4,400 |
| Nov 23, 2015 | Completed final sign-off Dec 2015 | 888 Brannan St | H C I Systems Inc | ansul ul-300 r-102 fire suppression system for kitchen hood and pollution control unit to be tied to the fire alarm system as 1 system. reference ti 2015.0320.1442 . n/a ordinance #155-13Details
ansul ul-300 r-102 fire suppression system for kitchen hood and pollution control unit to be tied to the fire alarm system as 1 system. reference ti 2015.0320.1442 . n/a ordinance #155-13 | $4,200 |
| Nov 19, 2015 | Never finaled issued Nov 2015, no final | 888 Brannan St | Herrero Builders Incorporated | reference to pa 2015-0320-1442 for fire life safety review. scope reviewed and approved by other departments as part of permit 2015-0330-1442. no change of work in scope. maher ordinance-extended is no apply.Details
reference to pa 2015-0320-1442 for fire life safety review. scope reviewed and approved by other departments as part of permit 2015-0330-1442. no change of work in scope. maher ordinance-extended is no apply. | |
| Nov 5, 2015 | Never finaled issued Nov 2015, no final | 888 Brannan St | street space permit | ||
| Oct 22, 2015 | Never finaled issued Nov 2015, no final | 888 Brannan St | Herrero Builders Incorporated | ground floor: revision to pa 2015 0320 1442- new structural shear walls. n/a ordinance #155-13Details
ground floor: revision to pa 2015 0320 1442- new structural shear walls. n/a ordinance #155-13 | |
| Sep 2, 2015 | Completed final sign-off Dec 2015 | 888 Brannan St | Pyro-Comm Systems, Inc. | 1st flr: new fire alarm devices ref pa 2015 0320 1442: 1 dual montior, 5 monitor modules. 4 relay modules, 3 duct detector, 18 speak/strobes, 1 strobe. maher naDetails
1st flr: new fire alarm devices ref pa 2015 0320 1442: 1 dual montior, 5 monitor modules. 4 relay modules, 3 duct detector, 18 speak/strobes, 1 strobe. maher na | $7,430 |
| Sep 2, 2015 | Completed final sign-off Apr 2016 | 888 Brannan St | Pyro-Comm Systems, Inc. | 1st flr: fire alarm devices- 1 power supply, 3 monitor modules, 7 relay modules, 7 duct detectors, 1 speaker/strobes, 4 strobes. maher naDetails
1st flr: fire alarm devices- 1 power supply, 3 monitor modules, 7 relay modules, 7 duct detectors, 1 speaker/strobes, 4 strobes. maher na | $9,743 |
| Aug 20, 2015 | Never finaled issued Aug 2015, no final | 888 Brannan St | Pioneer Fire Inc. | relocate 34 fire sprinklers, add (4) fire sprinklers ti ref pa 2014-0630-0004Details
relocate 34 fire sprinklers, add (4) fire sprinklers ti ref pa 2014-0630-0004 | $8,000 |
| Aug 5, 2015 | Completed final sign-off Jan 2016 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | relocate (41) sprinkler and add (21) sprinkler to conform w/the new walls/ceiling of the t.i. ref pa# 201503201442Details
relocate (41) sprinkler and add (21) sprinkler to conform w/the new walls/ceiling of the t.i. ref pa# 201503201442 | $31,870 |
| Jun 4, 2015 | Completed final sign-off Nov 2015 | 888 Brannan St | Pyro-Comm Systems, Inc. | new fire alarm device added to monitor for fuel leak on a new tenant generator added for 2nd fl tenant, ref 201501226448 n/a ordinance #155-13Details
new fire alarm device added to monitor for fuel leak on a new tenant generator added for 2nd fl tenant, ref 201501226448 n/a ordinance #155-13 | $2,000 |
| Jun 2, 2015 | Completed final sign-off May 2016 | 888 Brannan St | revision to previously approved occupant load and egress/plan path of travel. app#201406300004. no exterior work. n/a for maher.Details
revision to previously approved occupant load and egress/plan path of travel. app#201406300004. no exterior work. n/a for maher. | ||
| May 6, 2015 | Completed final sign-off Jun 2015 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | add & relocate a combination of 325 sprinklers to conform to the new wall/ceiling layout. t.i. pa#201406198836. n/a ordinance #155-13Details
add & relocate a combination of 325 sprinklers to conform to the new wall/ceiling layout. t.i. pa#201406198836. n/a ordinance #155-13 | $167,050 |
| Apr 29, 2015 | Completed final sign-off Jun 2015 | 888 Brannan St | Pyro-Comm Systems, Inc. | 3rd flr phase 2: new fire alarm devices added to ti in (e) bld: 2 smoke detectors, 7 relay modules, 7 duct detectors, 31 speaker/strobes, 3 strobes ref pa # 2014 0619 8836. maher naDetails
3rd flr phase 2: new fire alarm devices added to ti in (e) bld: 2 smoke detectors, 7 relay modules, 7 duct detectors, 31 speaker/strobes, 3 strobes ref pa # 2014 0619 8836. maher na | $12,350 |
| Apr 23, 2015 | Completed final sign-off Jun 2015 | 888 Brannan St | Westower Communications | roof: remove all nextel radio equipment, antennas and above ground coax. maher - not req'dDetails
roof: remove all nextel radio equipment, antennas and above ground coax. maher - not req'd | $10,000 |
| Apr 2, 2015 | Never finaled issued Apr 2015, no final | 888 Brannan St | Alwest Fire Protection | add 2 new fire sprinklers in cooler box. n/a ordinance #155-13Details
add 2 new fire sprinklers in cooler box. n/a ordinance #155-13 | $600 |
| Mar 20, 2015 | Completed final sign-off Nov 2016 | 888 Brannan St | Herrero Builders Incorporated | this project is phase 3 of a t.i., expansion for airbnb. demo of shear alls (n) shear walls (n) int. partition, glazing & doors, (n) mep will be on separate permit. (n) data & av distribution, (n) kitchen & dishwashing. modification to the fire sprinkler and alarm system on separate permit.Details
this project is phase 3 of a t.i., expansion for airbnb. demo of shear alls (n) shear walls (n) int. partition, glazing & doors, (n) mep will be on separate permit. (n) data & av distribution, (n) kitchen & dishwashing. modification to the fire sprinkler and alarm system on separate permit. | $1,086,750 |
| Mar 13, 2015 | Completed final sign-off Apr 2015 | 888 Brannan St | Cool Solutions Manufactoring,Inc | installation of new walk in cooler/freezer combo in (e) space with related ele & plm worl maher - not req'dDetails
installation of new walk in cooler/freezer combo in (e) space with related ele & plm worl maher - not req'd | $21,000 |
| Feb 27, 2015 | Never finaled issued Feb 2015, no final | 888 Brannan St | streetspace | ||
| Feb 20, 2015 | Never finaled issued Feb 2015, no final | 888 Brannan St | Paganini Electric Corp(See Signatories) | basement & 1st floor - upgrade lighting in corridors, replace exisitng lights with t-24 led at existing location. ref to pa #2014.1021.9497. no life safety work @ scope of work.Details
basement & 1st floor - upgrade lighting in corridors, replace exisitng lights with t-24 led at existing location. ref to pa #2014.1021.9497. no life safety work @ scope of work. | $272,000 |
| Jan 23, 2015 | Completed final sign-off Nov 2015 | 888 Brannan St | Weidner Architectural Signage | replace extg sign (illuminated 7 sq ft with new energy efficient sign (illuminated 5 sq ft) n/a for the maherDetails
replace extg sign (illuminated 7 sq ft with new energy efficient sign (illuminated 5 sq ft) n/a for the maher | $13,131 |
| Jan 22, 2015 | Completed final sign-off Jan 2016 | 888 Brannan St | Hathaway Dinwiddie Co. | installation of diesel generator (0nly) outside of bldg for tenant use. n/a for the maher. ref tp appl # 2014/10/31/0436 for electrical installation form generator to tenant on 2nd floor. this permit is to install generator only.Details
installation of diesel generator (0nly) outside of bldg for tenant use. n/a for the maher. ref tp appl # 2014/10/31/0436 for electrical installation form generator to tenant on 2nd floor. this permit is to install generator only. | $32,000 |
| Jan 12, 2015 | Completed final sign-off Aug 2015 | 888 Brannan St | Novo Construction Inc | revision to 201406047477 to change green building formDetails
revision to 201406047477 to change green building form | |
| Jan 5, 2015 | Never finaled issued Jan 2015, no final | 888 Brannan St | street space | ||
| Dec 23, 2014 | Completed final sign-off May 2015 | 888 Brannan St | Charles Pankow Builders Ltd | new demising partition, paint and case work. wood wall paneling and security desk. maher not reqDetails
new demising partition, paint and case work. wood wall paneling and security desk. maher not req | $105,000 |
| Dec 2, 2014 | Completed final sign-off Feb 2015 | 888 Brannan St | Pyro-Comm Systems, Inc. | new fire alarm devices for tenant improvement to existing building to inlcude 8 modules, 7 voltage relays, 1 smoke detector, 4 duct detector 42 speaker/strobes, 7 strobes, 2 speakersDetails
new fire alarm devices for tenant improvement to existing building to inlcude 8 modules, 7 voltage relays, 1 smoke detector, 4 duct detector 42 speaker/strobes, 7 strobes, 2 speakers | $11,400 |
| Nov 18, 2014 | Completed final sign-off Feb 2015 | 888 Brannan St | Intelligent Technologies & Services Inc | 2nd floor: 22 smokes and 1 bell. bldg app#201401216719 and sprinkler 201411141538. n/a for the maher.Details
2nd floor: 22 smokes and 1 bell. bldg app#201401216719 and sprinkler 201411141538. n/a for the maher. | $8,200 |
| Nov 14, 2014 | Completed final sign-off Feb 2015 | 888 Brannan St | Golden Gate Fire Protection Inc | relocate 133 pendent sprinklers heads on the 2nd floor. relocate 180 upright sprinklers heads. add new pre-action with hydraulic calculations ti 201401216719Details
relocate 133 pendent sprinklers heads on the 2nd floor. relocate 180 upright sprinklers heads. add new pre-action with hydraulic calculations ti 201401216719 | $160,165 |
| Nov 7, 2014 | Never finaled issued Nov 2014, no final | 888 Brannan St | Martinelli Environmental Graph | renew pa#201307031100 (sign permit form 4/7). install 3 illuminated numbers at front awning.Details
renew pa#201307031100 (sign permit form 4/7). install 3 illuminated numbers at front awning. | $23,000 |
| Oct 31, 2014 | Completed final sign-off Mar 2015 | 888 Brannan St | Hathaway Dinwiddie Co. | 2nd floor : mep to 2014.0121.6719. t.i. to (e) space. ** maher: compliance with ordinance no# 155-13 not required **Details
2nd floor : mep to 2014.0121.6719. t.i. to (e) space. ** maher: compliance with ordinance no# 155-13 not required ** | $92,000 |
| Oct 22, 2014 | Never finaled issued Oct 2014, no final | 888 Brannan St | Novo Construction Inc | demolition of existing mezzanine and existing columns, strengthening of one (e) column. n/a ordinance #155-13Details
demolition of existing mezzanine and existing columns, strengthening of one (e) column. n/a ordinance #155-13 | $20,000 |
| Oct 21, 2014 | Completed final sign-off May 2015 | 888 Brannan St | Charles Pankow Builders Ltd | basement & 1st flr corridor upgrades, replace existing ceiling grid, tiles and lighting with new gyp bd, ceiling, lighting and new finishes existing mech, elec, life safety & sprinkler system modification are not included under this permit. maher n/aDetails
basement & 1st flr corridor upgrades, replace existing ceiling grid, tiles and lighting with new gyp bd, ceiling, lighting and new finishes existing mech, elec, life safety & sprinkler system modification are not included under this permit. maher n/a | $105,000 |
| Oct 8, 2014 | Completed final sign-off Jul 2015 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | 2nd and 3rd floor: on 3rd floor, add and relocate fire sprinklers per t.i.: 18 add and 131 relocates. relocate existing standpipes #1 and #4 on 2nd and 3rd floors. ref app#201406198836. n/a for the maher.Details
2nd and 3rd floor: on 3rd floor, add and relocate fire sprinklers per t.i.: 18 add and 131 relocates. relocate existing standpipes #1 and #4 on 2nd and 3rd floors. ref app#201406198836. n/a for the maher. | $76,586 |
| Sep 10, 2014 | Completed final sign-off Jul 2015 | 888 Brannan St | Clear Channel Outdoor | clear channel outdoor inc will perform customary sign maintenance for general advertising sign located at 888 brannan st as shown on plans by vincent kevin kelly & assoc inc dtd 9-8-14, cco sign no 1617 (27x90 roof mounted sign); maher n/aDetails
clear channel outdoor inc will perform customary sign maintenance for general advertising sign located at 888 brannan st as shown on plans by vincent kevin kelly & assoc inc dtd 9-8-14, cco sign no 1617 (27x90 roof mounted sign); maher n/a | $500 |
| Sep 5, 2014 | Completed final sign-off Jun 2015 | 888 Brannan St | Pyro-Comm Systems, Inc. | 3rd floor:new fire alarm devices for a t.i. to an extg bldg to include 8 modules, 6 smoke detectors, 1 deuct detector, 55 speaker/strobes, 6 strobes. ref app#201406198836. n/a for the maher.Details
3rd floor:new fire alarm devices for a t.i. to an extg bldg to include 8 modules, 6 smoke detectors, 1 deuct detector, 55 speaker/strobes, 6 strobes. ref app#201406198836. n/a for the maher. | $17,000 |
| Aug 12, 2014 | Completed final sign-off Jul 2015 | 888 Brannan St | Novo Construction Inc | revision appl.#2014.0515.5830. revised floor framing strengthening per plan. maher n/a.Details
revision appl.#2014.0515.5830. revised floor framing strengthening per plan. maher n/a. | |
| Jul 2, 2014 | Never finaled issued Jul 2014, no final | 888 Brannan St | Charles Pankow Builders Ltd | provide new lighting and branch circuiting ot existing panel. provide california compliance forms. maher n/a. ref. appl 2014.05.21.6405.Details
provide new lighting and branch circuiting ot existing panel. provide california compliance forms. maher n/a. ref. appl 2014.05.21.6405. | $3,000 |
| Jul 1, 2014 | Never finaled issued Jul 2014, no final | 888 Brannan St | street space permit | ||
| Jun 30, 2014 | Completed final sign-off Jul 2015 | 888 Brannan St | Novo Construction Inc | 3rd floor: mechanical and electrical work for t.i. to include new heat pump, fan coils and new exhaust. ref app#201406198836. n/a for the maher ordinance #155-13Details
3rd floor: mechanical and electrical work for t.i. to include new heat pump, fan coils and new exhaust. ref app#201406198836. n/a for the maher ordinance #155-13 | $500,000 |
| Jun 30, 2014 | Completed final sign-off May 2016 | 888 Brannan St | Alsterlind Construction Inc. | t.i. for (n) restaurant at ground floor. work includes (n) kitchen, partitions, fixtures, finishes, equipment, lighting, mechanical. no exterior work. fire protection under separate permit. maher n/aDetails
t.i. for (n) restaurant at ground floor. work includes (n) kitchen, partitions, fixtures, finishes, equipment, lighting, mechanical. no exterior work. fire protection under separate permit. maher n/a | $750,000 |
| Jun 25, 2014 | Completed final sign-off Jul 2014 | 888 Brannan St | H & M Fire Protection, Inc. | alterations to fire sprinkler system for new corridor - 4 uprights and 1 pendentDetails
alterations to fire sprinkler system for new corridor - 4 uprights and 1 pendent | $5,123 |
| Jun 19, 2014 | Completed final sign-off Jul 2015 | 888 Brannan St | Novo Construction Inc | 3rd floor:t.i. to consist of demoltion of partitions. new glazing doors. mep life safty under seperate permit. n/a for the maher ordinance #155-13Details
3rd floor:t.i. to consist of demoltion of partitions. new glazing doors. mep life safty under seperate permit. n/a for the maher ordinance #155-13 | $2,340,549 |
| Jun 16, 2014 | Completed final sign-off Aug 2015 | 888 Brannan St | Novo Construction Inc | mechanical and electrical for ti on 3rd fl. compliance w/ ordinance no. 155-13 not required.Details
mechanical and electrical for ti on 3rd fl. compliance w/ ordinance no. 155-13 not required. | $750,000 |
| Jun 5, 2014 | Completed final sign-off Jul 2015 | 888 Brannan St | Novo Construction Inc | exterior building upgrades - new windows & skylights. mep and structural deferred. n/a ordinance #155-13Details
exterior building upgrades - new windows & skylights. mep and structural deferred. n/a ordinance #155-13 | $3,000,000 |
| Jun 4, 2014 | Completed final sign-off Jul 2015 | 888 Brannan St | Novo Construction Inc | office tenant improvement to include new interior partitions, ceiling and floor finishes. mep sep permit; compliance with ord no. 155-13 not required.Details
office tenant improvement to include new interior partitions, ceiling and floor finishes. mep sep permit; compliance with ord no. 155-13 not required. | $3,000,000 |
| May 23, 2014 | Completed final sign-off Aug 2014 | 888 Brannan St | Pyro-Comm Systems, Inc. | 1st floor:new fire alarm devices added to new tenant build out to include 5 relay modules, 5 smoke detectors, 3 duct detectors, 20 speaker/strobes 2 strobes. t.i. app#201404143185 n/a for the maher ordinance #155-13Details
1st floor:new fire alarm devices added to new tenant build out to include 5 relay modules, 5 smoke detectors, 3 duct detectors, 20 speaker/strobes 2 strobes. t.i. app#201404143185 n/a for the maher ordinance #155-13 | $8,900 |
| May 23, 2014 | Completed final sign-off Jul 2014 | 888 Brannan St | Golden Gate Fire Protection Inc | 1st floor: relocate 51 pendent sprinklers on the 1st floor. relocate 16 upright sprinkler. t.i. app#201401095886. n/a for the maher ordinance #155-13Details
1st floor: relocate 51 pendent sprinklers on the 1st floor. relocate 16 upright sprinkler. t.i. app#201401095886. n/a for the maher ordinance #155-13 | $34,505 |
| May 21, 2014 | Completed final sign-off Aug 2014 | 888 Brannan St | Charles Pankow Builders Ltd | 2nd floor:project consists of relocation of the 2nd floor corridor and installation of new finishes and ceiling grid. extg mechanical, electrical, life safety and sprinkler system modification are not included under this permit. n/a for the maher ordinance #155-13Details
2nd floor:project consists of relocation of the 2nd floor corridor and installation of new finishes and ceiling grid. extg mechanical, electrical, life safety and sprinkler system modification are not included under this permit. n/a for the maher ordinance #155-13 | $10,000 |
| May 15, 2014 | Never finaled issued Jun 2014, no final | 888 Brannan St | Novo Construction Inc | structural upgrade. voluntary floor strengthening. ref. appl 201405024769. maher ordinance 155-13 n/a.Details
structural upgrade. voluntary floor strengthening. ref. appl 201405024769. maher ordinance 155-13 n/a. | $132,000 |
| May 2, 2014 | Completed final sign-off Jul 2015 | 888 Brannan St | Novo Construction Inc | 3rd floor - demolition & structural upgrades. n/a maher ordinance #155-13Details
3rd floor - demolition & structural upgrades. n/a maher ordinance #155-13 | $185,000 |
| Apr 30, 2014 | Completed final sign-off Nov 2014 | 888 Brannan St | Charles Pankow Builders Ltd | voluntary seismic retrofit floor 2 through roof. n/a for the maher ordinance #155-13Details
voluntary seismic retrofit floor 2 through roof. n/a for the maher ordinance #155-13 | $100,000 |
| Apr 14, 2014 | Completed final sign-off Sep 2014 | 888 Brannan St | Hathaway Dinwiddie Co. | construction of non structural partitions, doors/frames, hardware, millwork, drywall, and acoustic ceilings grid/tile finishes. partial ti 1st fl with selective democompliance with ord 155-13 not required.Details
construction of non structural partitions, doors/frames, hardware, millwork, drywall, and acoustic ceilings grid/tile finishes. partial ti 1st fl with selective democompliance with ord 155-13 not required. | $1,700,000 |
| Apr 8, 2014 | Completed final sign-off Apr 2014 | 888 Brannan St | Golden Gate Fire Protection Inc | 2nd floor:ggfp 14-143. relocate 23 sprinklers on the 2nd floor.n/a for the maher ordinance #155-13Details
2nd floor:ggfp 14-143. relocate 23 sprinklers on the 2nd floor.n/a for the maher ordinance #155-13 | $13,340 |
| Mar 20, 2014 | Never finaled issued May 2014, no final | 888 Brannan St | revision to pa# 2011/12/14/0669. revise egress for level 1. work includes demolition of walls & doors. add new doors. change door hardware along egress path. patch and repair walls where affected by demo. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to pa# 2011/12/14/0669. revise egress for level 1. work includes demolition of walls & doors. add new doors. change door hardware along egress path. patch and repair walls where affected by demo. ** maher: compliance with ordinance no# 155-13 not required ** | $20,000 | |
| Mar 18, 2014 | Completed final sign-off May 2014 | 888 Brannan St | Pyro-Comm Systems, Inc. | new fire alarm devices for new tenant build out on the 2nd fl. 5 relay modules, 5 voltage relays, 7 duct detectors, 8 ceiling strobes, 16 seiling speaker strobes;compliance with ord 155-13 not requiredDetails
new fire alarm devices for new tenant build out on the 2nd fl. 5 relay modules, 5 voltage relays, 7 duct detectors, 8 ceiling strobes, 16 seiling speaker strobes;compliance with ord 155-13 not required | $12,000 |
| Mar 11, 2014 | Expired or cancelled cancelled Jan 2026 | 888 Brannan St | removal of mezzanine slab & selective removal & strengthening of columns, t.i. under seperate permit, complies with ab-017. n/a on ordinance #155-13Details
removal of mezzanine slab & selective removal & strengthening of columns, t.i. under seperate permit, complies with ab-017. n/a on ordinance #155-13 | $65,000 | |
| Mar 10, 2014 | Never finaled issued Mar 2014, no final | 888 Brannan St | street space | ||
| Feb 21, 2014 | Completed final sign-off Apr 2025 | 888 Brannan St | Pyro-Comm Systems, Inc. | new fire alarm devices added to new tenant build out. 4 speaker/strobes, 1 strob. pa # 201401095886Details
new fire alarm devices added to new tenant build out. 4 speaker/strobes, 1 strob. pa # 201401095886 | $4,000 |
| Feb 19, 2014 | Never finaled issued Feb 2014, no final | 888 Brannan St | Hathaway Dinwiddie Co. | 2nd floor:office t.i. for mechanical, plumbing and electrical w0rk for t.i. hvac, pantry sink, lighting and outlets, life safety. fire sprinkler under seperate permit. n/a for the maher ordinance #155-13.Details
2nd floor:office t.i. for mechanical, plumbing and electrical w0rk for t.i. hvac, pantry sink, lighting and outlets, life safety. fire sprinkler under seperate permit. n/a for the maher ordinance #155-13. | $275,000 |
| Jan 21, 2014 | Completed final sign-off Mar 2015 | 888 Brannan St | 2nd floor:interior new structural t.i. of extg office space new partitions and finishes. mep, fire alarm, and sprinkler on seperate permit. compliance w/ ordinance no. 155-13 not required. excavation <50 cu.yd.,Details
2nd floor:interior new structural t.i. of extg office space new partitions and finishes. mep, fire alarm, and sprinkler on seperate permit. compliance w/ ordinance no. 155-13 not required. excavation <50 cu.yd., | $165,000 | |
| Jan 9, 2014 | Completed final sign-off May 2014 | 888 Brannan St | Thomas Construction | 1st flr: tenant improvement to (e) space in (e) building consisting of relocating interior partition separating suite 175 from 176 and adding interior partitions to suite 176; compliance with ordinance no 155-13 not required.Details
1st flr: tenant improvement to (e) space in (e) building consisting of relocating interior partition separating suite 175 from 176 and adding interior partitions to suite 176; compliance with ordinance no 155-13 not required. | $25,000 |
| Jan 2, 2014 | Completed final sign-off May 2014 | 888 Brannan St | Hathaway Dinwiddie Co. | construction of non structural partitons, doors/framing/hardware/millwork, drywall, acoustic ceiling tile and grid, finishesDetails
construction of non structural partitons, doors/framing/hardware/millwork, drywall, acoustic ceiling tile and grid, finishes | $750,000 |
| Dec 2, 2013 | Expired or cancelled expired Mar 2018 | 888 Brannan St | Transceive Communications Inc. | replace existing antenna & add 5 more antennas. replace 3 existing cabinets with 1 new cabinet. at existing t-moble cell site. maher ordinance n/a.Details
replace existing antenna & add 5 more antennas. replace 3 existing cabinets with 1 new cabinet. at existing t-moble cell site. maher ordinance n/a. | $20,000 |
| Oct 21, 2013 | Never finaled issued Oct 2013, no final | 888 Brannan St | streetspace and mta | ||
| Sep 24, 2013 | Completed final sign-off Dec 2013 | 888 Brannan St | Thomas Construction | suites 2110 & 2115: t.i. to extg space in extg bldg. removing non load bearing interior partition to combine 2 spaces into one. straightening front walls by replace jogged wall with straight wall.Details
suites 2110 & 2115: t.i. to extg space in extg bldg. removing non load bearing interior partition to combine 2 spaces into one. straightening front walls by replace jogged wall with straight wall. | $10,000 |
| Aug 15, 2013 | Completed final sign-off Sep 2022 | 888 Brannan St | Martinelli Environmental Graph | install of 34 evacuation maps from 1-5 floors.Details
install of 34 evacuation maps from 1-5 floors. | $6,000 |
| Jul 9, 2013 | Expired or cancelled cancelled Jul 2014 | 888 Brannan St | Charles Pankow Builders Ltd | voluntary seismic upgrade at rear of the building. addition of steel brace frames, strengthening of floor disaphragm and columsDetails
voluntary seismic upgrade at rear of the building. addition of steel brace frames, strengthening of floor disaphragm and colums | $40,000 |
| Jul 3, 2013 | Completed final sign-off Apr 2014 | 888 Brannan St | Martinelli Environmental Graph | to erect 2 illuminated electrical projeting sign. to be connected inside bldg lobby.Details
to erect 2 illuminated electrical projeting sign. to be connected inside bldg lobby. | $24,000 |
| Jul 3, 2013 | Never finaled issued Jul 2013, no final | 888 Brannan St | Martinelli Environmental Graph | to erect electrical projeting sign.install new signDetails
to erect electrical projeting sign.install new sign | $23,000 |
| Jul 2, 2013 | Never finaled issued Jul 2013, no final | 888 Brannan St | street space permit | ||
| Jul 2, 2013 | Completed final sign-off Aug 2013 | 888 Brannan St | Certified Fire & Safety Co | install of ul300 hood & duct fire suppression system. reference central permit #2013-0117-8225.Details
install of ul300 hood & duct fire suppression system. reference central permit #2013-0117-8225. | $2,500 |
| May 22, 2013 | Completed final sign-off Oct 2013 | 888 Brannan St | Novo Construction Inc | mechanical and electrical work for t.i. at 5th floor. ref arch app#201301178225Details
mechanical and electrical work for t.i. at 5th floor. ref arch app#201301178225 | $170,000 |
| May 22, 2013 | Completed final sign-off Oct 2013 | 888 Brannan St | Novo Construction Inc | 3rd floor:t.i. atrium balcony to include new acoustical grid and ceiling tiles and gyp board cieling. new finishes throughout. elect, lighting under sep permit.Details
3rd floor:t.i. atrium balcony to include new acoustical grid and ceiling tiles and gyp board cieling. new finishes throughout. elect, lighting under sep permit. | $200,000 |
| May 20, 2013 | Expired or cancelled cancelled Jan 2026 | 888 Brannan St | installation of entry/store front glazing system. | $48,000 | |
| May 20, 2013 | Completed final sign-off Jun 2014 | 888 Brannan St | Richlen Construction | installation of interior store fronts and glass guardrails.Details
installation of interior store fronts and glass guardrails. | $55,000 |
| May 3, 2013 | Never finaled issued May 2013, no final | 888 Brannan St | street space | ||
| Apr 30, 2013 | Expired or cancelled cancelled Jan 2026 | 888 Brannan St | office tenant improvement for management office on 1st floor. 1340 sq ftDetails
office tenant improvement for management office on 1st floor. 1340 sq ft | $15,000 | |
| Apr 22, 2013 | Completed final sign-off Aug 2013 | 888 Brannan St | Pyro-Comm Systems, Inc. | 5th floor install new fire alarm devices in new t.i. build out. 5 smoke detectors, 1 duct detector, 11 speaker/strobes, 4 strobes & 2 door holders. t.i. #2013.01.17.8225 (under review).Details
5th floor install new fire alarm devices in new t.i. build out. 5 smoke detectors, 1 duct detector, 11 speaker/strobes, 4 strobes & 2 door holders. t.i. #2013.01.17.8225 (under review). | $7,000 |
| Apr 18, 2013 | Completed final sign-off Oct 2013 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | remove (e) 3" fhv, at 1st floor street level. not required.Details
remove (e) 3" fhv, at 1st floor street level. not required. | $300 |
| Apr 2, 2013 | Completed final sign-off Jun 2014 | 888 Brannan St | Richlen Construction | demolish existing inter-connecting staircase between the 2nd & 3rd floor. provide new structural slab infill & fire proofing.Details
demolish existing inter-connecting staircase between the 2nd & 3rd floor. provide new structural slab infill & fire proofing. | $10,000 |
| Mar 27, 2013 | Never finaled issued Mar 2013, no final | 888 Brannan St | street space | ||
| Mar 20, 2013 | Completed final sign-off Apr 2013 | 888 Brannan St | Husted Construction | #128- title 24 lighting for work approved under pa# 2012-1002-1117 (ti pa)Details
#128- title 24 lighting for work approved under pa# 2012-1002-1117 (ti pa) | $10,000 |
| Mar 19, 2013 | Completed final sign-off Oct 2013 | 888 Brannan St | Pyro-Comm Systems, Inc. | 4th floor-add speaker/strobes throughout new tenant area-add new realys, smoke detectors for area seperation fsd's & door hold open devices, 58 speaker/strobes, 13 strobes, 13 new smoke detectors, 8 new door hold opens. ti pa# 2012-1228-6968Details
4th floor-add speaker/strobes throughout new tenant area-add new realys, smoke detectors for area seperation fsd's & door hold open devices, 58 speaker/strobes, 13 strobes, 13 new smoke detectors, 8 new door hold opens. ti pa# 2012-1228-6968 | $36,494 |
| Mar 19, 2013 | Completed final sign-off Jun 2014 | 888 Brannan St | Richlen Construction | demo (e) showrooms & (e) corridors for future tenants, sprinklers, fire alarm, mech, electrical & plumbing under separate permitDetails
demo (e) showrooms & (e) corridors for future tenants, sprinklers, fire alarm, mech, electrical & plumbing under separate permit | $20,000 |
| Mar 13, 2013 | Completed final sign-off Jun 2016 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | 5th floor:add and relocate fire sprinkler heads per tenant improvement. 40 add and 38 relocate. building permit # 201301178225Details
5th floor:add and relocate fire sprinkler heads per tenant improvement. 40 add and 38 relocate. building permit # 201301178225 | $40,092 |
| Feb 28, 2013 | Never finaled issued Feb 2013, no final | 888 Brannan St | street space | ||
| Feb 14, 2013 | Completed final sign-off Mar 2013 | 888 Brannan St | Thomas Construction | new walls in existing tenant space in basementDetails
new walls in existing tenant space in basement | $3,000 |
| Feb 14, 2013 | Completed final sign-off Oct 2013 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | revise approved appl #2013/01/18/8270 to change bolt anchors for sway bracing. bolts used will be hilti kwik bolt tz (basement to 5th flr)Details
revise approved appl #2013/01/18/8270 to change bolt anchors for sway bracing. bolts used will be hilti kwik bolt tz (basement to 5th flr) | |
| Feb 12, 2013 | Completed final sign-off Oct 2013 | 888 Brannan St | Novo Construction Inc | 4th floor-m.e.p work associated with approved ti pa# 2012-1228-6968Details
4th floor-m.e.p work associated with approved ti pa# 2012-1228-6968 | $200,000 |
| Feb 12, 2013 | Completed final sign-off Jun 2014 | 888 Brannan St | Richlen Construction | 1st floor-new ramp at loading deck at the ground floorDetails
1st floor-new ramp at loading deck at the ground floor | $25,000 |
| Feb 11, 2013 | Never finaled issued Feb 2013, no final | 888 Brannan St | Novo Construction Inc | 4th floor:revision to app#201212286968 work to include structural floor enhancement on the 4th floor at the dinning area and conference room.Details
4th floor:revision to app#201212286968 work to include structural floor enhancement on the 4th floor at the dinning area and conference room. | $3,000 |
| Feb 8, 2013 | Completed final sign-off Jun 2013 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | 4th floor:add and relocate fire sprinkler heads per t.i./32 add, 118 relocate. ref app#201212286968Details
4th floor:add and relocate fire sprinkler heads per t.i./32 add, 118 relocate. ref app#201212286968 | $77,100 |
| Jan 18, 2013 | Completed final sign-off Oct 2013 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | add new control valves and replace fire hose valves per tenant improvement, 22 control valves, 52 fire hose halves. bldg pa# 201211285027Details
add new control valves and replace fire hose valves per tenant improvement, 22 control valves, 52 fire hose halves. bldg pa# 201211285027 | $22,200 |
| Jan 17, 2013 | Completed final sign-off Oct 2013 | 888 Brannan St | Novo Construction Inc | t.i. to consist of new non structural partitions, new acoustal ceiling, boards ceiling, new kitchen equipment. new support shafts on the 5th fl & roof levels. new mechanical platform at the roof for (e) ac unit.Details
t.i. to consist of new non structural partitions, new acoustal ceiling, boards ceiling, new kitchen equipment. new support shafts on the 5th fl & roof levels. new mechanical platform at the roof for (e) ac unit. | $685,000 |
| Jan 14, 2013 | Completed final sign-off Oct 2013 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | 4th and 5th floors: relocate fire sprinkler heads per t.i.: 4th floor:37 add,2 relocate. 5th floor:3 add and 9 relocate. t.i. app#201211285027.Details
4th and 5th floors: relocate fire sprinkler heads per t.i.: 4th floor:37 add,2 relocate. 5th floor:3 add and 9 relocate. t.i. app#201211285027. | $26,214 |
| Jan 2, 2013 | Completed final sign-off Oct 2013 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | add & relocate fire sprinkler heads per t.i. bldg pa# 201211285027. basement: 9 add, 1 relocate. 1st fl: 5 add, 0 relocate. 2nd fl: 15 add, 15 relocate. 3rd fl: 11 add, 19 relocate, 4th fl: 33 add, 0 relocate. new bracing calc's and braces.updating pipe sizes.atruim sprinkler wrj includes bracingDetails
add & relocate fire sprinkler heads per t.i. bldg pa# 201211285027. basement: 9 add, 1 relocate. 1st fl: 5 add, 0 relocate. 2nd fl: 15 add, 15 relocate. 3rd fl: 11 add, 19 relocate, 4th fl: 33 add, 0 relocate. new bracing calc's and braces.updating pipe sizes.atruim sprinkler wrj includes bracing | $55,512 |
| Dec 28, 2012 | Completed final sign-off Oct 2013 | 888 Brannan St | Novo Construction Inc | interior full floor tenant improvement on the 4th floor office space. mep and fire life safety under separate permitDetails
interior full floor tenant improvement on the 4th floor office space. mep and fire life safety under separate permit | $2,350,000 |
| Dec 18, 2012 | Never finaled issued Dec 2012, no final | 888 Brannan St | street space permit | ||
| Nov 30, 2012 | Completed final sign-off Dec 2012 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | basement #161 - add & relcoate fire sprinkler heads per tenant improvements - add 3, relcoate 8. ref pa #2012.1004.1297Details
basement #161 - add & relcoate fire sprinkler heads per tenant improvements - add 3, relcoate 8. ref pa #2012.1004.1297 | $5,500 |
| Nov 28, 2012 | Completed final sign-off Jun 2014 | 888 Brannan St | Richlen Construction | revision to pa #201203146059. for interior only.Details
revision to pa #201203146059. for interior only. | $499,000 |
| Nov 20, 2012 | Completed final sign-off Jun 2014 | 888 Brannan St | exterior skin to be repainted and most windows to be replaced with new. ref to app#201112281420 6/22/12Details
exterior skin to be repainted and most windows to be replaced with new. ref to app#201112281420 6/22/12 | ||
| Nov 14, 2012 | Expired or cancelled cancelled Mar 2014 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | fire/sprinkler system. tenant improvement - ste 2075, 1st level. 10 relocate, 3 add, 0 demo. t.i. pa# 201210041292Details
fire/sprinkler system. tenant improvement - ste 2075, 1st level. 10 relocate, 3 add, 0 demo. t.i. pa# 201210041292 | $6,500 |
| Oct 26, 2012 | Completed final sign-off Oct 2013 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | revision to approved pa# 201204167790. to remove metal flex. no seismic joint.Details
revision to approved pa# 201204167790. to remove metal flex. no seismic joint. | |
| Oct 22, 2012 | Completed final sign-off Nov 2012 | 888 Brannan St | Pyro-Comm Systems, Inc. | adding new speaker/strobes, smoke detectors, door holder to new lobby areas. temporary relocating annunciator panel until main lobby construction has been completed. t.i. pa#201203146059Details
adding new speaker/strobes, smoke detectors, door holder to new lobby areas. temporary relocating annunciator panel until main lobby construction has been completed. t.i. pa#201203146059 | $6,000 |
| Oct 5, 2012 | Completed final sign-off Oct 2012 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | basement, ste 128 fire sprinkler system t.i. - 3 relocate, 1 add, & 5 demo. ti. pa# 201210021117Details
basement, ste 128 fire sprinkler system t.i. - 3 relocate, 1 add, & 5 demo. ti. pa# 201210021117 | $2,000 |
| Oct 4, 2012 | Completed final sign-off Apr 2013 | 888 Brannan St | space 161:interior non structural t.i. of extg retail space. new partitions and finishes. m e p and fire alarm/sprinkler under seperate permit.Details
space 161:interior non structural t.i. of extg retail space. new partitions and finishes. m e p and fire alarm/sprinkler under seperate permit. | $45,000 | |
| Oct 4, 2012 | Completed final sign-off Apr 2013 | 888 Brannan St | space 2080:interior non structural t.i. of extg retail space. new partitions and finishes. m e p and fire alarm/sprinkler under seperate permit.Details
space 2080:interior non structural t.i. of extg retail space. new partitions and finishes. m e p and fire alarm/sprinkler under seperate permit. | $30,000 | |
| Oct 4, 2012 | Never finaled issued Oct 2012, no final | 888 Brannan St | space 183, 185a, & 185b:interior non structural t.i. of extg retail space. new partitions and finishes. m e p and fire alarm/sprinkler under seperate permit.Details
space 183, 185a, & 185b:interior non structural t.i. of extg retail space. new partitions and finishes. m e p and fire alarm/sprinkler under seperate permit. | $85,000 | |
| Oct 4, 2012 | Completed final sign-off Apr 2013 | 888 Brannan St | space #2075: interior non structural t.i. of extg retail space. new partitions and finishes. m e p and fire alarm/sprinkler under seperate permit.Details
space #2075: interior non structural t.i. of extg retail space. new partitions and finishes. m e p and fire alarm/sprinkler under seperate permit. | $100,000 | |
| Oct 2, 2012 | Completed final sign-off Apr 2013 | 888 Brannan St | Husted Construction | remodel e tenant space. mep fire, alarm and sprinkler uner sepaate permit. accessibility and path of travel under 201202013345Details
remodel e tenant space. mep fire, alarm and sprinkler uner sepaate permit. accessibility and path of travel under 201202013345 | $100,000 |
| Sep 26, 2012 | Completed final sign-off Apr 2013 | 888 Brannan St | space #2065-interior non structural tenant improvement of (e) retail space, new partitions & finishes. m.e.p & fire alarm/sprinklers under seperate permitDetails
space #2065-interior non structural tenant improvement of (e) retail space, new partitions & finishes. m.e.p & fire alarm/sprinklers under seperate permit | $25,000 | |
| Sep 26, 2012 | Completed final sign-off Apr 2013 | 888 Brannan St | Richlen Construction | space #109 & #113-interior non structural tenant improvement of (e) retail space, new partitions & finishes. m.e.p & fire alarm/sprinklers under seperate permitDetails
space #109 & #113-interior non structural tenant improvement of (e) retail space, new partitions & finishes. m.e.p & fire alarm/sprinklers under seperate permit | $20,000 |
| Sep 26, 2012 | Completed final sign-off Apr 2013 | 888 Brannan St | space #1115-interior non structural tenant improvement of (e) retail space, new partitions & finishes. m.e.p & fire alarm/sprinklers under seperate permitDetails
space #1115-interior non structural tenant improvement of (e) retail space, new partitions & finishes. m.e.p & fire alarm/sprinklers under seperate permit | $25,000 | |
| Sep 26, 2012 | Completed final sign-off Apr 2013 | 888 Brannan St | Richlen Construction | space #102-interior non structural tenant improvement of (e) retail space, new partitions & finishes. m.e.p & fire alarm/sprinklers under seperate permitDetails
space #102-interior non structural tenant improvement of (e) retail space, new partitions & finishes. m.e.p & fire alarm/sprinklers under seperate permit | $20,000 |
| Sep 24, 2012 | Completed final sign-off Feb 2013 | 888 Brannan St | Got Power Inc Dba C D & Power | lift generator with 325 gallon integral double-walled tank into place and anchor within existing outdoor room, run generator exhaust and vents up above roof line 12 feet above grade.Details
lift generator with 325 gallon integral double-walled tank into place and anchor within existing outdoor room, run generator exhaust and vents up above roof line 12 feet above grade. | $100,000 |
| Sep 19, 2012 | Completed final sign-off Oct 2013 | 888 Brannan St | Ayoob & Peery Plumbing Co Inc | 1st floor-fire sprinkler system-3 add, 28 relocate & 3 demo sprinkler heads. ti pa# 2012-0817-7696Details
1st floor-fire sprinkler system-3 add, 28 relocate & 3 demo sprinkler heads. ti pa# 2012-0817-7696 | $15,900 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Novo Construction Inc (45), Pyro-Comm Systems, Inc. (28), Ayoob & Peery Plumbing Co Inc (20), Hathaway Dinwiddie Co. (8), Richlen Construction (7), Charles Pankow Builders Ltd (6), Martinelli Environmental Graph (4), Golden Gate Fire Protection Inc (3), H C I Systems Inc (3), Herrero Builders Incorporated (3), Pioneer Fire Inc. (3), Thomas Construction (3), Alsterlind Construction Inc. (2), Alwest Fire Protection (2), Anderson, Rowe & Buckley, Inc. (2), Cool Solutions Manufactoring,Inc (2), Husted Construction (2), Mastec Network Solutions Inc (2), Source Planning And Construction Inc (2), Transceive Communications Inc. (2), All Star Fire Protection Llc, Ariel-10, Inc, Betacom, Incorporated, Bevilacqua & Sons, Certified Fire & Safety Co, Clear Channel Outdoor, Giampolini & Co Dba Giampolini/Courtney, Got Power Inc Dba C D & Power, H & M Fire Protection, Inc., H&L Custom Builders Inc, Intelligent Technologies & Services Inc, Lewis M Merlo Inc, Paganini Electric Corp(See Signatories), Shaughnessy Roofing Inc, Weidner Architectural Signage, Westower Communications, Xclusive Wireless Resources Llc.
- Architects
- Douglas Zucker (6), Young Wong (6), Kyle Elliott (4), John Ashworth (3), Martha Breed (3), Scott Clement (3), Stanley Lew (3), Donna K Cook (2), Kyle W. Elliott (2), Andrew Weber, Bret Mccomb, Cam Helland, Clement Soga, Daniel Craig Pamperin, Daniel Ewald, Erik Elmtoft, John Anderson Jr., Joseph Fay, Michael Lina Garicia, Susan Wootan
- Engineers
- Jennifer Keeene (2), Pak Hui (2), Stephen Shaffer (2), Andrew Patterson, Andy Ta-Chwan Luong, Barry Wenger, Christopher Wener, Clement Soga, Craig W. Ristow, Edward Rivera, Habtom Nugusse Tewelde, James Spore, John Anderson Jr., Maged Henein, Mike Howe, O.David Vazquez Camacho, Richard Wells
- Authorized agents
- Stephen Traficante
- Designers
- Silicon Valley Mechanical Inc, Vincent Kelly
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.