Permit GraphShortlistSan Francisco building permits since 2000

Gangyi Zhou

License
M34279
Mechanical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up M34279 at the Board for Professional Engineers
Listed as
engineer
Firm
Studio 02
Based in
Lake Forest
On San Francisco permits
Sep 2016 to Aug 2026

18 permits since 2000 (engineer on 18 permits): 6 completed, 4 in progress, 7 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Alb Design And Construction, Aligned Technologies Llc Dba Aligned Dev, Best Forever Construction Company, C D R Construction, Cogent Construction & Consulting Inc, Ddg Construction Corp, Dorian's Works, E Conservation Construction, Hybrid City Construction Inc, L P Construction, Pkc Construction Co., Turbo Construction, Vega Construction Company
Architects
Geoffrey Gibson (3), Seydehnastaran Mousavi (3), Dane Bunton (2), Sunny Tam (2), Geoffrey B Lim, Hidenori Iwagami, Richard Hammond, Tony Jackson, Vita Rey
Engineers
Gangyi Zhou (2), Jason Pisano (2), Allen Chun-Ying Wu, Donald David, Raymond Abassi, Srdjan Rebraca, Thomas Peterson
Authorized agents
Ricardo Alcantara

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 26, 2026In progress
issued Oct 2026
1649 Divisadero StTurbo Constructiong/f ti. for new boba tea shop.
Details
Permit
202608267208
Permit issued
Oct 9, 2026

g/f ti. for new boba tea shop.

Open the permit page

$125,000
Oct 14, 2025In progress
issued Nov 2025
4452 Mission StAlb Design And Constructioncommercial tenant improvement of takeout only ice cream shop with associated mep
Details
Permit
202510147303
Permit issued
Nov 7, 2025

commercial tenant improvement of takeout only ice cream shop with associated mep

Open the permit page

$125,000
Sep 8, 2025In progress
issued Sep 2025
905 Folsom StDdg Construction Corprevision to 202411265748 to page p1.1 to reflect entrance point of sewer line
Details
Permit
202509084811
Permit issued
Sep 8, 2025

revision to 202411265748 to page p1.1 to reflect entrance point of sewer line

Open the permit page

Oct 3, 2024Completed
final sign-off Oct 2025
317 Cortland AvVega Construction Companyrev 202112234993- modification of layout and mep scope for cannabis retail. frame new storage and office. install new lights and install new electric panel.
Details
Permit
202410032283
Permit issued
Nov 15, 2024
Final sign-off
Oct 30, 2025

rev 202112234993- modification of layout and mep scope for cannabis retail. frame new storage and office. install new lights and install new electric panel.

Open the permit page

Nov 28, 2023In progress
issued Jul 2024
159 Fell StL P Constructionalter site permit to pa 201912200114s. eliminate basement & move utility spaces to the ground fl. eliminate retail space at ground fl & provide one additional residential unit for a total of 25. fell & hickory ground fl street facades revised to show changes in use. no changes to fl 2-7.
Details
Permit
202311281457
Permit issued
Jul 16, 2024

alter site permit to pa 201912200114s. eliminate basement & move utility spaces to the ground fl. eliminate retail space at ground fl & provide one additional residential unit for a total of 25. fell & hickory ground fl street facades revised to show changes in use. no changes to fl 2-7.

Open the permit page

Aug 23, 2023Never finaled
issued Sep 2023, no final
3655 Lawton StC D R Constructionrevision to pa# 202208301598. removal of previously approved skylights, roof access hatch + alteration of window operation. update to title-24 forms based on revision to remove heating element from mechanical system + altered hood specs.
Details
Permit
202308235046
Permit issued
Sep 5, 2023

revision to pa# 202208301598. removal of previously approved skylights, roof access hatch + alteration of window operation. update to title-24 forms based on revision to remove heating element from mechanical system + altered hood specs.

Open the permit page

May 1, 2023Never finaled
filed May 2023, never issued
38 Peralta Avbuild out(e) basement which does not meet the required head height in it's current state. basement will be extended into the garden with a (n) terrace above. replacement of deck
Details
Permit
202305016832

build out(e) basement which does not meet the required head height in it's current state. basement will be extended into the garden with a (n) terrace above. replacement of deck

Open the permit page

$400,000
Oct 11, 2022Completed
final sign-off Mar 2023
1930 Fillmore StDorian's Worksnew non bearing partitions, open skylights to sales area. patch (e) ceiling. install new electrical light fixtures & new flooring. (e) mezzanine & roof area will remain as is.
Details
Permit
202210114084
Permit issued
Nov 21, 2022
Final sign-off
Mar 20, 2023

new non bearing partitions, open skylights to sales area. patch (e) ceiling. install new electrical light fixtures & new flooring. (e) mezzanine & roof area will remain as is.

Open the permit page

$76,000
Mar 31, 2022Never finaled
filed Mar 2022, never issued
1045 Diamond Strenovation of (e) 2 story 2 units multi-family building. remodel lower (1045) unit from 1bed/1bath to 2-bed/2-bath. unit to have private entrance. eliminate common entry and circulation. reduce garage space from 2-car to 1-car. bldg exterior dimensions and heights unchanged.
Details
Permit
202203311337

renovation of (e) 2 story 2 units multi-family building. remodel lower (1045) unit from 1bed/1bath to 2-bed/2-bath. unit to have private entrance. eliminate common entry and circulation. reduce garage space from 2-car to 1-car. bldg exterior dimensions and heights unchanged.

Open the permit page

$300,000
Mar 31, 2022Never finaled
filed Mar 2022, never issued
1047 Diamond Strenovation of (e) 2 story 2 units multi-family building. remodel upper (1047) unit from 3bed/1bath to 3-bed/2.5-bath. create private usable open space at roof deck. unit to have a private entry at clipper st. exterior bldg dimensions and heights to remain.
Details
Permit
202203311338

renovation of (e) 2 story 2 units multi-family building. remodel upper (1047) unit from 3bed/1bath to 3-bed/2.5-bath. create private usable open space at roof deck. unit to have a private entry at clipper st. exterior bldg dimensions and heights to remain.

Open the permit page

$200,000
Dec 23, 2021Completed
final sign-off Oct 2025
317 Cortland Avinterior remodel to an (e) retail space to accomodate retail dispensary. relocate sinle occupancy restroom, cosmetic upgrades (n) hvac system, new staff break room (n) lighting.
Details
Permit
202112234993
Permit issued
Jan 20, 2022
Final sign-off
Oct 30, 2025

interior remodel to an (e) retail space to accomodate retail dispensary. relocate sinle occupancy restroom, cosmetic upgrades (n) hvac system, new staff break room (n) lighting.

Open the permit page

$95,000
Oct 18, 2021Never finaled
issued Apr 2022, no final
5801 Mission StE Conservation Construction, Hybrid City Construction Incremoval & construction of non bearing walls, new lighting, plumbing and heating system. no changing of existing floor sq ft. change of use from retail to cannabis dispensary. no consumption onsight.
Details
Permit
202110180686
Permit issued
Apr 12, 2022

removal & construction of non bearing walls, new lighting, plumbing and heating system. no changing of existing floor sq ft. change of use from retail to cannabis dispensary. no consumption onsight.

Open the permit page

$58,000
Jul 27, 2021Expired or cancelled
cancelled Jan 2026
1139 Taraval Stti for an (e) tea shop. no change of use but to go only w/no customer seating or access to store interior. (n) partitions, (n) kitchen equipment layout, update (e) storeforont layout
Details
Permit
202107275213

ti for an (e) tea shop. no change of use but to go only w/no customer seating or access to store interior. (n) partitions, (n) kitchen equipment layout, update (e) storeforont layout

Open the permit page

$85,000
Nov 30, 2020Completed
final sign-off Oct 2022
2845 Geary Blhorizontal addition. remodel & addition to convert an existing restaurant to a cannabis retail dispensary on ground floor. residential unit above stays intact, with an addition of deck to it.
Details
Permit
202011309843
Permit issued
Sep 27, 2021
Final sign-off
Oct 13, 2022

horizontal addition. remodel & addition to convert an existing restaurant to a cannabis retail dispensary on ground floor. residential unit above stays intact, with an addition of deck to it.

Open the permit page

$400,000
Dec 27, 2019Never finaled
issued Jul 2023, no final
723 Larkin StAligned Technologies Llc Dba Aligned Devbringing warm shell space to occupy a restaruant n/a maher
Details
Permit
201912270793
Permit issued
Jul 25, 2023

bringing warm shell space to occupy a restaruant n/a maher

Open the permit page

$100,000
Aug 24, 2018Completed
final sign-off Sep 2019
332 Clement StBest Forever Construction Companycommercial t.i. "mokuku" no change of use. new dining finishes, new non-structural partitions, new millwork, remodeled bar area and 2nd floor wait station, accessible restroom upgrades. no change to 3rd floor.
Details
Permit
201808248257
Permit issued
Dec 3, 2018
Final sign-off
Sep 6, 2019

commercial t.i. "mokuku" no change of use. new dining finishes, new non-structural partitions, new millwork, remodeled bar area and 2nd floor wait station, accessible restroom upgrades. no change to 3rd floor.

Open the permit page

$120,000
Nov 23, 2016Never finaled
issued Dec 2016, no final
220 Montgomery StPkc Construction Co.revision to 201609288956: layout changes, maher na
Details
Permit
201611233409
Permit issued
Dec 23, 2016

revision to 201609288956: layout changes, maher na

Open the permit page

$20,000
Sep 12, 2016Completed
final sign-off Nov 2016
3251 20th AvCogent Construction & Consulting Inc#239- revision to pa#201608094558, replacing existing water source & heap pump.
Details
Permit
201609127397
Permit issued
Sep 22, 2016
Final sign-off
Nov 23, 2016

#239- revision to pa#201608094558, replacing existing water source & heap pump.

Open the permit page

$50,000