Gangyi Zhou
- Listed as
- engineer
- Firm
- Gmep Engineers, Inc.
- Based in
- Lake Forest
- On San Francisco permits
- Nov 2016 to Aug 2025
13 permits since 2000 (engineer on 13 permits): 10 completed, 2 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 25, 2025 | In progress issued Aug 2025 | 905 Folsom St | Ddg Construction Corp | revision to 202411265748, for electrical sheets to show (e) electrical system on site.Details
revision to 202411265748, for electrical sheets to show (e) electrical system on site. | |
| Jun 10, 2025 | In progress issued Feb 2026 | 400 Guerrero St | Pinnacle Builders Llc | exterior elevation & interior remodel of (e) bldg, interior remodel expansion. install (n) food & beverage equipment.install new sales area food cabinet, equipment & new sales area food cabinet & equipment.accessibility upgrade. bp for tank & piping #2024-0213-5772 is subject to these improvement.Details
exterior elevation & interior remodel of (e) bldg, interior remodel expansion. install (n) food & beverage equipment.install new sales area food cabinet, equipment & new sales area food cabinet & equipment.accessibility upgrade. bp for tank & piping #2024-0213-5772 is subject to these improvement. | $150,000 |
| Jun 27, 2023 | Completed final sign-off Jul 2024 | 1769 Fulton St | A G G General Contractor | revision to pa 2022-0804-9913 demo shed in backyard, replace with trash enclosure; plan/layout modifications. replace lighting. add moment frame accommodate facade changesDetails
revision to pa 2022-0804-9913 demo shed in backyard, replace with trash enclosure; plan/layout modifications. replace lighting. add moment frame accommodate facade changes | $20,000 |
| Feb 28, 2023 | Completed final sign-off Mar 2023 | 1930 Fillmore St | Dorian's Works | revision to bpa#202210114084, removal of mecahnical from scope. (e) mechanical system to remain as is.Details
revision to bpa#202210114084, removal of mecahnical from scope. (e) mechanical system to remain as is. | |
| Oct 5, 2022 | Completed final sign-off Sep 2023 | 900 North Point St | Nolen Construction Company Inc Dba Nolen | restaurant: relocation of main bar and adjacent addeted seating area within (e) restaurant space. modification to building systems shall be made to accommodate this change. all (e) e-gress paths & accessible routes shall remain to new work.Details
restaurant: relocation of main bar and adjacent addeted seating area within (e) restaurant space. modification to building systems shall be made to accommodate this change. all (e) e-gress paths & accessible routes shall remain to new work. | $350,000 |
| Aug 30, 2022 | Never finaled issued Nov 2022, no final | 3655 Lawton St | C D R Construction | expand (e) coffee shop and bakery (3655 lawton street) into adjacent commercial space (3645 lawton street) interior remodel/ti and cosmetic facade improvement.Details
expand (e) coffee shop and bakery (3655 lawton street) into adjacent commercial space (3645 lawton street) interior remodel/ti and cosmetic facade improvement. | $50,000 |
| Jun 16, 2022 | Completed final sign-off Apr 2023 | 4035 18th St | Ortizlaw Construction | interior tenant improvement of (e) commercial space with associated mep. (e) facade to remain. (e) fire sprinklers to be relocated to fit new rooms. no increase in build area. last accessibility upgrades permitted in 2014.Details
interior tenant improvement of (e) commercial space with associated mep. (e) facade to remain. (e) fire sprinklers to be relocated to fit new rooms. no increase in build area. last accessibility upgrades permitted in 2014. | $165,000 |
| Dec 23, 2021 | Completed final sign-off Oct 2025 | 317 Cortland Av | interior remodel to an (e) retail space to accomodate retail dispensary. relocate sinle occupancy restroom, cosmetic upgrades (n) hvac system, new staff break room (n) lighting.Details
interior remodel to an (e) retail space to accomodate retail dispensary. relocate sinle occupancy restroom, cosmetic upgrades (n) hvac system, new staff break room (n) lighting. | $95,000 | |
| Dec 7, 2021 | Completed final sign-off Feb 2023 | 2279 Mission St | Gene Catania Construction | change of use to restaurant (b occupancy). interior remodel to accomodate full service restaurant. commercial kitchen, modification to restrooms.Details
change of use to restaurant (b occupancy). interior remodel to accomodate full service restaurant. commercial kitchen, modification to restrooms. | $50,000 |
| Nov 12, 2021 | Completed final sign-off Jan 2023 | 1801 Polk St | Current Construction | interior remodel of an (e) commercial space to coffee shop/bakery, new coffee bar with new equpment for coffe, baking, equptment for roasting coffe & baking goods. new seating area, lighting, elec & plumbing. modify (e)unisex restroom. remodel area approx 1,720 sq. ft.Details
interior remodel of an (e) commercial space to coffee shop/bakery, new coffee bar with new equpment for coffe, baking, equptment for roasting coffe & baking goods. new seating area, lighting, elec & plumbing. modify (e)unisex restroom. remodel area approx 1,720 sq. ft. | $200,000 |
| Aug 24, 2018 | Completed final sign-off Sep 2019 | 332 Clement St | Best Forever Construction Company | commercial t.i. "mokuku" no change of use. new dining finishes, new non-structural partitions, new millwork, remodeled bar area and 2nd floor wait station, accessible restroom upgrades. no change to 3rd floor.Details
commercial t.i. "mokuku" no change of use. new dining finishes, new non-structural partitions, new millwork, remodeled bar area and 2nd floor wait station, accessible restroom upgrades. no change to 3rd floor. | $120,000 |
| Dec 7, 2016 | Completed final sign-off Jun 2018 | 580 Hayes St | Terra Nova Industries, K Bali Construction | #2- interior t.i. to consist of a new business space with supporting kitchen, public area & restroom. kitchen to include walk-in cooler with new mechanical, electrical & plumbing. public area to consist of millwork, furniture & hvac. new restroom supporting plumbing. modify (e) exterior awning.Details
#2- interior t.i. to consist of a new business space with supporting kitchen, public area & restroom. kitchen to include walk-in cooler with new mechanical, electrical & plumbing. public area to consist of millwork, furniture & hvac. new restroom supporting plumbing. modify (e) exterior awning. | $250,000 |
| Nov 10, 2016 | Completed final sign-off Apr 2017 | 2201 Fillmore St | K Bali Construction | t. i. an ice cream shop from former evolution fresh (limited restaurant), no added square footage, no change of use, no change in occupancy type. add kitchen, new electrical plumbing work, new awning.Details
t. i. an ice cream shop from former evolution fresh (limited restaurant), no added square footage, no change of use, no change in occupancy type. add kitchen, new electrical plumbing work, new awning. | $45,000 |