Seydehnastaran Mousavi
- Listed as
- architect
- Firm
- Studio Banaa Arch
- Based in
- San Francisco
- On San Francisco permits
- Oct 2017 to Sep 2023
15 permits since 2000 (architect on 15 permits): 13 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 7, 2023 | Completed final sign-off Apr 2024 | 188 Octavia St | Rossi Builders Inc. | project consists of a ti in an (e) commercial space for adventurous sports. project to include modifications to (e) layout, plumbing, lighting & hvac. new element include: lightning and outlets, millwork, plumbing, hvac and large exercise equipment.Details
project consists of a ti in an (e) commercial space for adventurous sports. project to include modifications to (e) layout, plumbing, lighting & hvac. new element include: lightning and outlets, millwork, plumbing, hvac and large exercise equipment. | $283,587 |
| Aug 3, 2023 | Completed final sign-off Aug 2024 | 2169 Folsom St | north building: revision to permit 202011068431. remove and replace (e) 2/f framing instead of modifying it. 2/f to have solid cork finish.Details
north building: revision to permit 202011068431. remove and replace (e) 2/f framing instead of modifying it. 2/f to have solid cork finish. | ||
| Jun 27, 2023 | Completed final sign-off Mar 2024 | 1954 15th St | Kevin Webb Construction Inc | convert powder rm into full primary bath, replacement of 1 extg window in-kind, new millwork to serve primary bed closet, repair and expand extg ceiling cove in primary bedrm, installation of new lighting fixtures and reconfiguration of 2 extg closets.Details
convert powder rm into full primary bath, replacement of 1 extg window in-kind, new millwork to serve primary bed closet, repair and expand extg ceiling cove in primary bedrm, installation of new lighting fixtures and reconfiguration of 2 extg closets. | $60,000 |
| Aug 4, 2022 | Completed final sign-off Oct 2022 | 2845 Geary Bl | revision to 2020 1130 9843/r2. remove rear windows, remove note about sprinkler. replace exit stair w/ spiral stair. residentail unit: add heater comply w/ nov 202182791.Details
revision to 2020 1130 9843/r2. remove rear windows, remove note about sprinkler. replace exit stair w/ spiral stair. residentail unit: add heater comply w/ nov 202182791. | ||
| Dec 23, 2021 | Completed final sign-off Oct 2025 | 317 Cortland Av | interior remodel to an (e) retail space to accomodate retail dispensary. relocate sinle occupancy restroom, cosmetic upgrades (n) hvac system, new staff break room (n) lighting.Details
interior remodel to an (e) retail space to accomodate retail dispensary. relocate sinle occupancy restroom, cosmetic upgrades (n) hvac system, new staff break room (n) lighting. | $95,000 | |
| Nov 12, 2021 | Completed final sign-off Jan 2023 | 1801 Polk St | Current Construction | interior remodel of an (e) commercial space to coffee shop/bakery, new coffee bar with new equpment for coffe, baking, equptment for roasting coffe & baking goods. new seating area, lighting, elec & plumbing. modify (e)unisex restroom. remodel area approx 1,720 sq. ft.Details
interior remodel of an (e) commercial space to coffee shop/bakery, new coffee bar with new equpment for coffe, baking, equptment for roasting coffe & baking goods. new seating area, lighting, elec & plumbing. modify (e)unisex restroom. remodel area approx 1,720 sq. ft. | $200,000 |
| Sep 17, 2021 | Completed final sign-off Oct 2021 | 4248 18th St | minor remodel of (e) commercial space.prevoius use was a pizzeria. modify (e) bar to accomoadte an accessible seating area. minor upgrades to the (e) accessible restroom. replace entry door with a new one & add an automatic door opener.Details
minor remodel of (e) commercial space.prevoius use was a pizzeria. modify (e) bar to accomoadte an accessible seating area. minor upgrades to the (e) accessible restroom. replace entry door with a new one & add an automatic door opener. | $10,000 | |
| Mar 4, 2021 | Completed final sign-off Mar 2022 | 517 08th Av | Current Construction | remodel interior & reconfigure (e) stairs at backyard. basement: add powder room. 1st fl: kitchen remodel. 2nd fl: 2 bathrooms remodel, upgrade finish throughout. replace all (e) windows facing street & rear in-kind. at rear add 1 fixed window & replace sliding door. (n) light fixtures.Details
remodel interior & reconfigure (e) stairs at backyard. basement: add powder room. 1st fl: kitchen remodel. 2nd fl: 2 bathrooms remodel, upgrade finish throughout. replace all (e) windows facing street & rear in-kind. at rear add 1 fixed window & replace sliding door. (n) light fixtures. | $120,000 |
| Mar 1, 2021 | Expired or cancelled cancelled Jan 2026 | 1490 Ocean Av | reconfiguration of an awning on the roof level. demolition of existing awning on roof level. addition of a new awning with structural columns. new lighting.Details
reconfiguration of an awning on the roof level. demolition of existing awning on roof level. addition of a new awning with structural columns. new lighting. | $15,150 | |
| Feb 2, 2021 | Completed final sign-off Aug 2021 | 1830 Polk St | Wells Construction Inc | remodel of an (e) gym facility & its conversion to an animal hospital. m.e.p. included. prop h.Details
remodel of an (e) gym facility & its conversion to an animal hospital. m.e.p. included. prop h. | $300,000 |
| Nov 30, 2020 | Completed final sign-off Oct 2022 | 2845 Geary Bl | horizontal addition. remodel & addition to convert an existing restaurant to a cannabis retail dispensary on ground floor. residential unit above stays intact, with an addition of deck to it.Details
horizontal addition. remodel & addition to convert an existing restaurant to a cannabis retail dispensary on ground floor. residential unit above stays intact, with an addition of deck to it. | $400,000 | |
| Nov 6, 2020 | Completed final sign-off Aug 2024 | 2169 Folsom St | no.bldg: interior upgrade to a 382sf commercial space; remodel of (e)loft ladder and sheet medeal flooring at loft, structurl upgrade to loft structure, new spiral stairs and guardrail, minor lighting replacement, modification to (e) sink counter.create space of (e) loft into legal story-level.Details
no.bldg: interior upgrade to a 382sf commercial space; remodel of (e)loft ladder and sheet medeal flooring at loft, structurl upgrade to loft structure, new spiral stairs and guardrail, minor lighting replacement, modification to (e) sink counter.create space of (e) loft into legal story-level. | $15,000 | |
| Dec 27, 2019 | Never finaled issued Jul 2023, no final | 723 Larkin St | Aligned Technologies Llc Dba Aligned Dev | bringing warm shell space to occupy a restaruant n/a maherDetails
bringing warm shell space to occupy a restaruant n/a maher | $100,000 |
| Jun 1, 2018 | Completed final sign-off Jul 2018 | 376 Utah St | Secured Builder | 6000 sq ft interior remodel to e building located at 376 utah in sf scope includes additon of walls to create robotics workshop, open office related to robotic production, conference room, upgrade to rear exit door, mirnor upgrades to staff breakroom kitchenette. restrooms existing and meet accessibDetails
6000 sq ft interior remodel to e building located at 376 utah in sf scope includes additon of walls to create robotics workshop, open office related to robotic production, conference room, upgrade to rear exit door, mirnor upgrades to staff breakroom kitchenette. restrooms existing and meet accessib | $50,000 |
| Oct 27, 2017 | Completed final sign-off Jun 2022 | 237 14th Av | Kanler Inc, Knab Builder, Campos Construction | intr&extr remodel. incl conversion bsmt(g/fl)space into a living space, addition to 1st & 2nd fl.living space on west facing side of(e)bldg towards(e)backyard.add a deck on 1/fl & new balcony on 2/fl.enclosure (e)entry staircase w/ 3 skylights.Details
intr&extr remodel. incl conversion bsmt(g/fl)space into a living space, addition to 1st & 2nd fl.living space on west facing side of(e)bldg towards(e)backyard.add a deck on 1/fl & new balcony on 2/fl.enclosure (e)entry staircase w/ 3 skylights. | $248,000 |