Ahmad Nader Ghderi
- License
- 36475
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- A & S Engineering
- Based in
- Canyon Country
- On San Francisco permits
- Jul 2011 to Jun 2025
13 permits since 2000 (engineer on 13 permits): 7 completed, 1 in progress, 4 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Allen Industries Inc (4), Charles E Thomas Company Inc (4), Gettler-Ryan Inc (2), A & J Environmental Services, Pinnacle Builders Llc
- Engineers
- Allen Chun-Ying Wu, Gangyi Zhou
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 13
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 10, 2025 | In progress issued Feb 2026 | 400 Guerrero St | Pinnacle Builders Llc | exterior elevation & interior remodel of (e) bldg, interior remodel expansion. install (n) food & beverage equipment.install new sales area food cabinet, equipment & new sales area food cabinet & equipment.accessibility upgrade. bp for tank & piping #2024-0213-5772 is subject to these improvement.Details
exterior elevation & interior remodel of (e) bldg, interior remodel expansion. install (n) food & beverage equipment.install new sales area food cabinet, equipment & new sales area food cabinet & equipment.accessibility upgrade. bp for tank & piping #2024-0213-5772 is subject to these improvement. | $150,000 |
| Jun 28, 2022 | Expired or cancelled withdrawn Mar 2023 | 1200 Geneva Av | Gettler-Ryan Inc | remove existing underground tank. replace all paving and driveway related to the tank removal.Details
remove existing underground tank. replace all paving and driveway related to the tank removal. | $15,000 |
| Jun 28, 2022 | Completed final sign-off Sep 2022 | 1200 Geneva Av | Gettler-Ryan Inc | remove & replace (e) pole sign. (electric sign, double faced)Details
remove & replace (e) pole sign. (electric sign, double faced) | $15,000 |
| Mar 1, 2022 | Completed final sign-off May 2022 | 1798 Mission St | Charles E Thomas Company Inc | remove and replace exist fuel disp's and exist shear valves, sensors.Details
remove and replace exist fuel disp's and exist shear valves, sensors. | $15,000 |
| Apr 6, 2021 | Completed final sign-off Oct 2021 | 1700 Noriega St | A & J Environmental Services | remove 6 (e) dispensers install (n) bravo conversion frame over (e) udc. install 6 (n) gilbarco encore 700 dispensers, upgrade veedor root software to 1.05 or higher. cold start the monitoring panel.Details
remove 6 (e) dispensers install (n) bravo conversion frame over (e) udc. install 6 (n) gilbarco encore 700 dispensers, upgrade veedor root software to 1.05 or higher. cold start the monitoring panel. | $8,000 |
| Sep 29, 2020 | Never finaled issued Nov 2020, no final | 2190 Carroll Av | Charles E Thomas Company Inc | install new signage 24'-6"x30'-10" on new canopy (canopy #1)Details
install new signage 24'-6"x30'-10" on new canopy (canopy #1) | $35,000 |
| Sep 29, 2020 | Never finaled issued Nov 2020, no final | 2190 Carroll Av | Charles E Thomas Company Inc | remove (e) canopies and install (n)24'-6"x30'-10" (canopy #1) & 24'7"x27'-1" (canopy #2) fuel canopies including footings, signate, electrical & lighting.Details
remove (e) canopies and install (n)24'-6"x30'-10" (canopy #1) & 24'7"x27'-1" (canopy #2) fuel canopies including footings, signate, electrical & lighting. | $75,000 |
| Sep 29, 2020 | Never finaled issued Nov 2020, no final | 2190 Carroll Av | Charles E Thomas Company Inc | install new signage on new canopy 24'7"x27'-1" (canopy #2)Details
install new signage on new canopy 24'7"x27'-1" (canopy #2) | $35,000 |
| Sep 26, 2019 | Completed final sign-off Feb 2020 | 2000 19th Av | Allen Industries Inc | revision to 201906284714 change to sign sizesDetails
revision to 201906284714 change to sign sizes | |
| Jul 11, 2019 | Completed final sign-off Aug 2021 | 2301 19th Av | Allen Industries Inc | remove & replace existing mobile signate & graphics and replace with speedway signage & graphics. reface existing pole sign.Details
remove & replace existing mobile signate & graphics and replace with speedway signage & graphics. reface existing pole sign. | $15,000 |
| Jul 11, 2019 | Never finaled issued Jul 2019, no final | 3300 Cesar Chavez St | Allen Industries Inc | remove & replace existing mobile signate & graphics and replace with speedway signage & graphics. reface existing pole sign.Details
remove & replace existing mobile signate & graphics and replace with speedway signage & graphics. reface existing pole sign. | $15,000 |
| Jun 28, 2019 | Completed final sign-off Feb 2020 | 2000 19th Av | Allen Industries Inc | to remove all extg mobil signs and graphics. replace with speedway sign & graphic. remove moble on extg pole sign reface with speedway. all with plexiglass vynl.Details
to remove all extg mobil signs and graphics. replace with speedway sign & graphic. remove moble on extg pole sign reface with speedway. all with plexiglass vynl. | $15,000 |
| Jul 21, 2011 | Completed final sign-off Dec 2013 | 4850 Geary Bl | change of use- ti to food mart. remove existing equipment inside the bays. remodel exterior of building.Details
change of use- ti to food mart. remove existing equipment inside the bays. remodel exterior of building. | $110,000 |