Allen Chun-Ying Wu
- License
- C69385
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C69385 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Jun 2021 to Jun 2025
3 permits since 2000 (engineer on 3 permits): 1 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- E Conservation Construction, Hybrid City Construction Inc, Pinnacle Builders Llc
- Architects
- Hidenori Iwagami
- Engineers
- Gangyi Zhou, Gangyi Zhou, Nader Ghadfri
- Authorized agents
- Ricardo Alcantara
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 10, 2025 | In progress issued Feb 2026 | 400 Guerrero St | Pinnacle Builders Llc | exterior elevation & interior remodel of (e) bldg, interior remodel expansion. install (n) food & beverage equipment.install new sales area food cabinet, equipment & new sales area food cabinet & equipment.accessibility upgrade. bp for tank & piping #2024-0213-5772 is subject to these improvement.Details
exterior elevation & interior remodel of (e) bldg, interior remodel expansion. install (n) food & beverage equipment.install new sales area food cabinet, equipment & new sales area food cabinet & equipment.accessibility upgrade. bp for tank & piping #2024-0213-5772 is subject to these improvement. | $150,000 |
| Oct 18, 2021 | Never finaled issued Apr 2022, no final | 5801 Mission St | E Conservation Construction, Hybrid City Construction Inc | removal & construction of non bearing walls, new lighting, plumbing and heating system. no changing of existing floor sq ft. change of use from retail to cannabis dispensary. no consumption onsight.Details
removal & construction of non bearing walls, new lighting, plumbing and heating system. no changing of existing floor sq ft. change of use from retail to cannabis dispensary. no consumption onsight. | $58,000 |
| Jun 18, 2021 | Completed final sign-off May 2022 | 675 27th St | addition of deck and windows (not visible from the street)Details
addition of deck and windows (not visible from the street) | $10,000 |