Brandon Winter
- Listed as
- engineer
- Firm
- Simpson Strong-Tie Co. Inc.
- On San Francisco permits
- Oct 2015 to Nov 2024
10 permits since 2000 (engineer on 10 permits): 5 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 19, 2024 | Expired or cancelled expired Apr 2026 | 1327 Grant Av | Zhongwei Construction | revision to pa# 202307313323: 1/f layout change. rear shear wall change to 5'-6" into the building (align w/ 2nd and 3rd rear exterior wall)Details
revision to pa# 202307313323: 1/f layout change. rear shear wall change to 5'-6" into the building (align w/ 2nd and 3rd rear exterior wall) | |
| Jun 27, 2023 | Completed final sign-off Jul 2024 | 1769 Fulton St | A G G General Contractor | revision to pa 2022-0804-9913 demo shed in backyard, replace with trash enclosure; plan/layout modifications. replace lighting. add moment frame accommodate facade changesDetails
revision to pa 2022-0804-9913 demo shed in backyard, replace with trash enclosure; plan/layout modifications. replace lighting. add moment frame accommodate facade changes | $20,000 |
| Mar 1, 2022 | Completed final sign-off Nov 2022 | 40 Tiffany Av | Rei Build Up Construction Corp | revision to pa# 201911268203. relocate steel moment frame. substitute handy panels with high strength wood shearwall by simpson.Details
revision to pa# 201911268203. relocate steel moment frame. substitute handy panels with high strength wood shearwall by simpson. | |
| Nov 26, 2019 | Completed final sign-off Nov 2022 | 40 Tiffany Av | Axel8 Construction | to comply with nov # 201995299. seismic retrofit with 2016 cebc appendix a-4.Details
to comply with nov # 201995299. seismic retrofit with 2016 cebc appendix a-4. | $80,000 |
| Jun 6, 2019 | In progress issued Oct 2023 | 4333 26th St | K J Woods Construction Inc | erect 3-story and a basement type v-b construction single family homeDetails
erect 3-story and a basement type v-b construction single family home | $939,000 |
| May 22, 2018 | Completed final sign-off Aug 2026 | 497 Molimo Dr | horizontal addition to a sfd. add (1) master bedroom suite at 3rd flr. enlarge family rm & rearrange laundry & 1/2 bath area. add a connection bridge from master bedroom to rear yard at 3rd flr. remove wall between living & dining at 2nd flr to create great rm. mep under separate permits.Details
horizontal addition to a sfd. add (1) master bedroom suite at 3rd flr. enlarge family rm & rearrange laundry & 1/2 bath area. add a connection bridge from master bedroom to rear yard at 3rd flr. remove wall between living & dining at 2nd flr to create great rm. mep under separate permits. | $150,000 | |
| Oct 10, 2017 | Never finaled issued Nov 2017, no final | 40 Cervantes Bl | mandatory soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. maher not reqDetails
mandatory soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. maher not req | $55,000 | |
| May 23, 2017 | Expired or cancelled expired Nov 2023 | 1263 11th Av | Theodore Design & Constr | seismic retrofit for soft story building construction 2 special moment frames including foundations and connections. strengthening shear wall at gr lvl,floor,garage per ord 2016cebc app a4Details
seismic retrofit for soft story building construction 2 special moment frames including foundations and connections. strengthening shear wall at gr lvl,floor,garage per ord 2016cebc app a4 | $75,000 |
| May 5, 2017 | Never finaled issued May 2017, no final | 886 27th Av | voluntary structural strenthening. lightwell infill against blank wall.Details
voluntary structural strenthening. lightwell infill against blank wall. | $4,000 | |
| Oct 1, 2015 | Completed final sign-off Oct 2016 | 1710 19th Av | Andonian Construction | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. mandatory seismic retrofit, 3 moment frames, sheer walls.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. mandatory seismic retrofit, 3 moment frames, sheer walls. | $120,000 |