Block 6597, lot 005
40 Tiffany Ave
- City’s use
- Multi-Family Residential
- Built
- 1923
- Stories
- 4
- Units
- 14
- Rooms
- 14 bedrooms, 14 bathrooms
- Building
- 8,996 sq ft
- Lot
- 6,189 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 1, 2022 | Completed final sign-off Nov 2022 | 40 Tiffany Av | Rei Build Up Construction Corp | revision to pa# 201911268203. relocate steel moment frame. substitute handy panels with high strength wood shearwall by simpson.Details
revision to pa# 201911268203. relocate steel moment frame. substitute handy panels with high strength wood shearwall by simpson. | |
| Nov 17, 2021 | Expired or cancelled cancelled Nov 2025 | 40 Tiffany Av | Au Electric Corporation/Aec Alarms | to install new low frequency sounds at 2 new residential units on g/f to meet nfpa72-2016 & sffc 1103.7.6.1. ref pa202006068213.Details
to install new low frequency sounds at 2 new residential units on g/f to meet nfpa72-2016 & sffc 1103.7.6.1. ref pa202006068213. | $3,000 |
| Nov 4, 2021 | Completed final sign-off Mar 2022 | 40 Tiffany Av | Axel8 Construction | unit 1 rehab e kitchen, rehab e bath, install washer dryerDetails
unit 1 rehab e kitchen, rehab e bath, install washer dryer | $28,000 |
| Oct 19, 2021 | Completed final sign-off Nov 2024 | 40 Tiffany Av | A M West Mechanical Inc. | install new fire sprinkler system for ground level install new water service line for new fire sprinkler system form curb to the buildingDetails
install new fire sprinkler system for ground level install new water service line for new fire sprinkler system form curb to the building | $26,000 |
| Jul 14, 2021 | Completed final sign-off Jan 2022 | 40 Tiffany Av | Axel8 Construction | unit 12 - rehabilitate (e) kitchen and existing bathroom; install washer & dryerDetails
unit 12 - rehabilitate (e) kitchen and existing bathroom; install washer & dryer | $40,000 |
| Jun 9, 2021 | Completed final sign-off Jul 2021 | 40 Tiffany Av | Architectural Fenestration & Restoration | unit #6: finish and install new wood/clad casement windows to be restored to original building design. three window openings on street facing facade of building. no change in opening size.Details
unit #6: finish and install new wood/clad casement windows to be restored to original building design. three window openings on street facing facade of building. no change in opening size. | $3,800 |
| Oct 27, 2020 | Completed final sign-off May 2021 | 40 Tiffany Av | Au Electric Corporation/Aec Alarms | upgrade the existing fire alarm system to comply with sffc 1103.7.6.1. & nfpa 72.Details
upgrade the existing fire alarm system to comply with sffc 1103.7.6.1. & nfpa 72. | $40,000 |
| Jul 16, 2020 | Never finaled issued Feb 2021, no final | 40 Tiffany Av | Axel8 Construction | unit 6: 1)convert extg living room to bedroom. 2)rehabilitate (e) kitchen. 3)rehabilitate extg bathrooms. 4)install washer and dryer.Details
unit 6: 1)convert extg living room to bedroom. 2)rehabilitate (e) kitchen. 3)rehabilitate extg bathrooms. 4)install washer and dryer. | $40,000 |
| Jun 6, 2020 | Completed final sign-off Nov 2024 | 40 Tiffany Av | Rei Build Up Construction Corp, S L M Development Inc. | add 2 adu's at ground floor storage and garage per ordinance 162-16. soft story under seperate permit #2019. 1126.8203Details
add 2 adu's at ground floor storage and garage per ordinance 162-16. soft story under seperate permit #2019. 1126.8203 | $150,000 |
| Nov 26, 2019 | Completed final sign-off Nov 2022 | 40 Tiffany Av | Axel8 Construction | to comply with nov # 201995299. seismic retrofit with 2016 cebc appendix a-4.Details
to comply with nov # 201995299. seismic retrofit with 2016 cebc appendix a-4. | $80,000 |
| Nov 3, 2017 | Completed final sign-off Mar 2018 | 40 Tiffany Av | D F K Y Construction Inc | unit 9: rehabilitate existing kitchen & bath, install washer/dryer.Details
unit 9: rehabilitate existing kitchen & bath, install washer/dryer. | $25,000 |
| Sep 12, 2017 | Expired or cancelled withdrawn Nov 2019 | 40 Tiffany Av | soft story retrofit per sfebc chapter 4d, fema p-807.Details
soft story retrofit per sfebc chapter 4d, fema p-807. | $45,000 | |
| Sep 13, 2016 | Never finaled issued Sep 2016, no final | 40 Tiffany Av | Markoff Structural Pest Control | markoff structural termite report 15201 items 2, 3, 4Details
markoff structural termite report 15201 items 2, 3, 4 | $8,000 |
| Apr 27, 2015 | Completed final sign-off Jun 2015 | 40 Tiffany Av | K & M Construction | unit # 4: kitchen remodel with new bathroom fixtures and new counter top. rewire unit. no walls moved. removed or added, all layouts to remain unchanged.Details
unit # 4: kitchen remodel with new bathroom fixtures and new counter top. rewire unit. no walls moved. removed or added, all layouts to remain unchanged. | $15,000 |
| Apr 23, 2015 | Expired or cancelled withdrawn Apr 2015 | 40 Tiffany Av | interior remodel unit 4. installation of managers office at gr fl. install 1/2 bath gr fl, 2hr ceiling gr fl, fire sprinklers gr flDetails
interior remodel unit 4. installation of managers office at gr fl. install 1/2 bath gr fl, 2hr ceiling gr fl, fire sprinklers gr fl | $75,000 | |
| Jan 20, 2015 | Completed final sign-off Feb 2015 | 40 Tiffany Av | D C Taylor Co | reroofing. compliance with maher ordinance no 155-13 not required.Details
reroofing. compliance with maher ordinance no 155-13 not required. | $15,000 |
| Jul 10, 2014 | Never finaled issued Jul 2014, no final | 40 Tiffany Av | street spaceDetails
street space | ||
| Jul 2, 2014 | Completed final sign-off Nov 2014 | 40 Tiffany Av | Pinnacle Construction & Maintenance Llc | remodel & replace cabinets counters, valves, tile , fixtures and appliances paint , replace hardware fixtures and refinish, hardwood floors.Details
remodel & replace cabinets counters, valves, tile , fixtures and appliances paint , replace hardware fixtures and refinish, hardwood floors. | $24,000 |
| Jun 30, 2014 | Completed final sign-off Nov 2014 | 40 Tiffany Av | Pinnacle Construction & Maintenance Llc | unit 7: bathroom & kitchen remodel/replace cabinets, counters, tile fixtures appliances. paint entire unit, refinish hardwood floors. to correct item #3, his nov #201478661/patcdh fire barrierDetails
unit 7: bathroom & kitchen remodel/replace cabinets, counters, tile fixtures appliances. paint entire unit, refinish hardwood floors. to correct item #3, his nov #201478661/patcdh fire barrier | $24,000 |
| May 29, 2014 | Completed final sign-off Nov 2014 | 40 Tiffany Av | Pinnacle Construction & Maintenance Llc | unit 5. kitchen remodel: replace cabinets, fixtures, tile, appliances, paint, refinish floors. no walls to be removed. no changes to walls or doors. work only to his unit.Details
unit 5. kitchen remodel: replace cabinets, fixtures, tile, appliances, paint, refinish floors. no walls to be removed. no changes to walls or doors. work only to his unit. | $24,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Axel8 Construction (4), Pinnacle Construction & Maintenance Llc (3), Au Electric Corporation/Aec Alarms (2), Rei Build Up Construction Corp (2), A M West Mechanical Inc., Architectural Fenestration & Restoration, D C Taylor Co, D F K Y Construction Inc, K & M Construction, Markoff Structural Pest Control, S L M Development Inc.
- Architects
- Daniel Paris
- Engineers
- Joe Win Kon (3), Brandon Winter (2), Edward Rivera
- Authorized agent-otherss
- Daniel Paris, Roger Tsai
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.