Ken Linsteadt
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Ken Linsteadt & Architecture
- Based in
- San Francisco
- On San Francisco permits
- Jan 2002 to Mar 2024
39 permits since 2000 (architect on 34 permits, engineer on 3 permits, authorized agent-others on 1 permit, designer on 1 permit): 27 completed, 6 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 8, 2024 | Expired or cancelled expired Aug 2026 | 3636 Clay St | Clayton Timbrell & Co | revise pa#'s 202307061612 and 202312192794: to repair east property line windows, replace 3rd floor exterior door, add mechanical well at front yard and replace exterior service stair.Details
revise pa#'s 202307061612 and 202312192794: to repair east property line windows, replace 3rd floor exterior door, add mechanical well at front yard and replace exterior service stair. | $80,000 |
| Jul 6, 2023 | Completed final sign-off Aug 2026 | 3636 Clay St | Clayton Timbrell & Co | rev pa# 202304196036, structural upgrades, interior renovation , increased basement floor area, interior reconfiguration of 1st , 2nd and 3rd flrs and exterior opening modifications at north elevation.Details
rev pa# 202304196036, structural upgrades, interior renovation , increased basement floor area, interior reconfiguration of 1st , 2nd and 3rd flrs and exterior opening modifications at north elevation. | $400,000 |
| Apr 19, 2023 | Completed final sign-off Aug 2026 | 3636 Clay St | Clayton Timbrell & Co | struct. upgrades & interior basement renovation with a 6 inch lowered finish basement flr.Details
struct. upgrades & interior basement renovation with a 6 inch lowered finish basement flr. | $400,000 |
| Dec 21, 2022 | Never finaled issued Jan 2023, no final | 25 06th Av | Jeff King And Company Inc | revision to 201906254357 s1 for new structural foundation for backyard fence.Details
revision to 201906254357 s1 for new structural foundation for backyard fence. | |
| Aug 23, 2022 | Never finaled issued Sep 2022, no final | 25 06th Av | Jeff King And Company Inc | revision to 201906254357 to incorporate changes to windows at proposed 3rd fl lightwellDetails
revision to 201906254357 to incorporate changes to windows at proposed 3rd fl lightwell | |
| May 2, 2022 | Never finaled issued May 2022, no final | 25 06th Av | Jeff King And Company Inc | revision to bpa#201906254357, interior framing, windows & doors, floor level elevations, lighting, roof & mechanical elements, chimney removal, gas fireplaces, new gas meter, infill of lightwell @ 3/f & 4/f.Details
revision to bpa#201906254357, interior framing, windows & doors, floor level elevations, lighting, roof & mechanical elements, chimney removal, gas fireplaces, new gas meter, infill of lightwell @ 3/f & 4/f. | |
| Feb 16, 2022 | Never finaled issued Apr 2022, no final | 25 06th Av | Jeff King And Company Inc | revise grading, utility, erosion control plans and foundation and 2nd floor framing plans for pa#201906274559 (s1)Details
revise grading, utility, erosion control plans and foundation and 2nd floor framing plans for pa#201906274559 (s1) | |
| Sep 24, 2021 | Completed final sign-off Nov 2022 | 3466 21st St | Moroso Construction Inc | revision to 202011058337. provide 2 closets for electrical storage system. ess batteries will be submitted under separate permitDetails
revision to 202011058337. provide 2 closets for electrical storage system. ess batteries will be submitted under separate permit | |
| Nov 19, 2020 | Expired or cancelled cancelled Jan 2026 | 2503 Broadway | Jeff King And Company Inc | removal of exterior convenience stair (rear elevation). new windows at 2nd fl (rear elevation).Details
removal of exterior convenience stair (rear elevation). new windows at 2nd fl (rear elevation). | $83,000 |
| Nov 5, 2020 | Completed final sign-off Nov 2022 | 3466 21st St | Moroso Construction Inc | revision #3 to pa# 2018-0911-9773 s4 regarding east and north property line wall structural foundation and design.Details
revision #3 to pa# 2018-0911-9773 s4 regarding east and north property line wall structural foundation and design. | $25,000 |
| Aug 27, 2020 | Completed final sign-off Mar 2022 | 2324 Pacific Av | Upscale Construction Inc. | revisions to pa#'s 2019-08-20-9253 & 2020-01-29-3017: replace first and fourth floor windows and misc minor exterior improvements.Details
revisions to pa#'s 2019-08-20-9253 & 2020-01-29-3017: replace first and fourth floor windows and misc minor exterior improvements. | $1,000,000 |
| Feb 26, 2020 | Completed final sign-off Nov 2022 | 3466 21st St | Moroso Construction Inc | revision to pa# 2018-0911-9773 s4. remove rear stair off terrace. add bay volume to 2nd flr on terrace. lower west side yard grade . modify entry stair. window and door changes. **to comply w/ maher ord# 155-13, route to dph**Details
revision to pa# 2018-0911-9773 s4. remove rear stair off terrace. add bay volume to 2nd flr on terrace. lower west side yard grade . modify entry stair. window and door changes. **to comply w/ maher ord# 155-13, route to dph** | $33,500 |
| Jan 29, 2020 | Completed final sign-off Mar 2022 | 2324 Pacific Av | Upscale Construction Inc. | revision to pa #201908209253 for removal of two (e) chimneys.Details
revision to pa #201908209253 for removal of two (e) chimneys. | $2,500 |
| Dec 10, 2019 | Never finaled issued Dec 2019, no final | 2526 Broadway | Joseph Ward General Contractor | revision to pa# 201908209358 and 201908017616. work to include (5) new skylights at 407 dining room and (1) new skylight at 403 bath. structural revisions to skylight layout included in scope. electrical change on rcp include additional lights fixtures, switches and receptacles.Details
revision to pa# 201908209358 and 201908017616. work to include (5) new skylights at 407 dining room and (1) new skylight at 403 bath. structural revisions to skylight layout included in scope. electrical change on rcp include additional lights fixtures, switches and receptacles. | $7,000 |
| Aug 20, 2019 | Completed final sign-off Mar 2022 | 2324 Pacific Av | Upscale Construction Inc. | voluntary upgrade extg foundation, renovate interior of extg house, reconfigure 1st floor.Details
voluntary upgrade extg foundation, renovate interior of extg house, reconfigure 1st floor. | $1,250,000 |
| Aug 1, 2019 | Completed final sign-off Feb 2021 | 2526 Broadway | Joseph Ward General Contractor | renovation of condo unti withing a 6 unit bldg. condo is on 3rd & 4th fl of 4-story bldg. no work on 1st & 2nd fl. scope includes selective demo & partial renovation of condo unit. new kitchen & bathroom fixtures. replacement of rear window on 4th fl. total of 5 proposed skylights.Details
renovation of condo unti withing a 6 unit bldg. condo is on 3rd & 4th fl of 4-story bldg. no work on 1st & 2nd fl. scope includes selective demo & partial renovation of condo unit. new kitchen & bathroom fixtures. replacement of rear window on 4th fl. total of 5 proposed skylights. | $40,000 |
| Jun 25, 2019 | Never finaled issued Mar 2021, no final | 25 06th Av | Jeff King And Company Inc | front bldg: renovate (e) house including lowering 1st flr, extend south wall addition at 1st and 2nd flrs. construct a new terrace. legalize deck addition at 1st and 2nd flrs.Details
front bldg: renovate (e) house including lowering 1st flr, extend south wall addition at 1st and 2nd flrs. construct a new terrace. legalize deck addition at 1st and 2nd flrs. | $2,000,000 |
| Sep 11, 2018 | Completed final sign-off Nov 2022 | 3466 21st St | Moroso Construction Inc | renovate (e) house, excavate for a fully below-grade basement, reduce size of (e) 1976 rear addition, modify (e) windows and doors. **comply w/ maher, route to dph**Details
renovate (e) house, excavate for a fully below-grade basement, reduce size of (e) 1976 rear addition, modify (e) windows and doors. **comply w/ maher, route to dph** | $3,600,000 |
| Sep 5, 2018 | Completed final sign-off Sep 2019 | 2505 Broadway | Thompson Suskind L P | revision to 201401065671- revision to entry doorway adjacent to the covered driveway. there is no other proposed change, no change in height or useDetails
revision to 201401065671- revision to entry doorway adjacent to the covered driveway. there is no other proposed change, no change in height or use | |
| Aug 8, 2018 | Completed final sign-off Sep 2019 | 2505 Broadway | Thompson Suskind L P | revision to pa 2014-0106-5671 the scope of work consists of reduction to the width of the approved addition for the new elevator on the east side of the existing home. there is no other proposed change; no change in use or height. this revision results in a slight reduction in bulkDetails
revision to pa 2014-0106-5671 the scope of work consists of reduction to the width of the approved addition for the new elevator on the east side of the existing home. there is no other proposed change; no change in use or height. this revision results in a slight reduction in bulk | |
| Nov 7, 2014 | Completed final sign-off Mar 2022 | 1020 Union St | Paul Ryan Associates | add toilet and shower to existing laundry room and modify existing closet in storage room. this project does not include any changes to building use, type of construction, exterior openings or structure.Details
add toilet and shower to existing laundry room and modify existing closet in storage room. this project does not include any changes to building use, type of construction, exterior openings or structure. | $8,000 |
| Jun 25, 2014 | Completed final sign-off Nov 2014 | 717 Battery St | Terra Nova Industries | add new architecture counters, casework, flooring. n/a maher ordinanceDetails
add new architecture counters, casework, flooring. n/a maher ordinance | $80,000 |
| Feb 15, 2013 | Completed final sign-off May 2013 | 2517 Pacific Av | Ventana 76 | remove half bathroom & reframe for larger bathroom. install new shower, vanity & new toilet. frame entry vestibuleDetails
remove half bathroom & reframe for larger bathroom. install new shower, vanity & new toilet. frame entry vestibule | $30,000 |
| Dec 10, 2012 | Completed final sign-off Feb 2016 | 11 Collins St | minor alternation of entry porch. minor alteration of (e) 2nd fl. addition of 874.5 sq ft @ the 2nd fl consisting of a (n) master suite. removal & replacement of (e) roofing & roof structure.Details
minor alternation of entry porch. minor alteration of (e) 2nd fl. addition of 874.5 sq ft @ the 2nd fl consisting of a (n) master suite. removal & replacement of (e) roofing & roof structure. | $245,000 | |
| Oct 17, 2012 | Completed final sign-off Jun 2014 | 2680 Green St | Thompson Suskind L P | ref 2012-02-14-4178.infill at rear of exist bldg on 1st,2nd&3rd fls.to result in a continous,aligned rear wall. infill does not extend rear wall further into rear yard.add+/- 36 s.f. at 1/fl, +/- 36 s.f. at 2/fl& +/- at 3/fl. total addition of 83 s.f.Details
ref 2012-02-14-4178.infill at rear of exist bldg on 1st,2nd&3rd fls.to result in a continous,aligned rear wall. infill does not extend rear wall further into rear yard.add+/- 36 s.f. at 1/fl, +/- 36 s.f. at 2/fl& +/- at 3/fl. total addition of 83 s.f. | $25,000 |
| Aug 17, 2010 | Completed final sign-off Dec 2010 | 2517 Pacific Av | Bmc Construction/Lasting Impressions In | exterior stair alteration at frontDetails
exterior stair alteration at front | $8,000 |
| Jan 22, 2010 | Expired or cancelled cancelled Jun 2014 | 1219 Lombard St | extension of lower floor level, extension of upper floor level, repair of landscaping areas affected by proposed extension-site permitDetails
extension of lower floor level, extension of upper floor level, repair of landscaping areas affected by proposed extension-site permit | $100,000 | |
| Oct 21, 2009 | Completed final sign-off Nov 2012 | 6 Presidio Tr | R E West Builders Inc | repair foundation; shorring and underpinning under separate permit basement remodeling. new bathroom, relocate wine cellar. first floor; relocate bathoom. second floor; new bathroom.Details
repair foundation; shorring and underpinning under separate permit basement remodeling. new bathroom, relocate wine cellar. first floor; relocate bathoom. second floor; new bathroom. | $500,000 |
| May 22, 2009 | Completed final sign-off Nov 2009 | 1219 Lombard St | interior remodeling; add loft space, change wine rm. to laundry. remove 2 partition walls for breakfast nook. replace sunrm. to office by partition walls. (interior only)Details
interior remodeling; add loft space, change wine rm. to laundry. remove 2 partition walls for breakfast nook. replace sunrm. to office by partition walls. (interior only) | $70,000 | |
| May 8, 2009 | Completed final sign-off Aug 2010 | 738 El Camino Del Mar | new stairs from garden level to living room balcony, rebuild and extension of the living room balcony, remodel of master bedroom, replace exist dining rm & master bedroom, window as indicated.Details
new stairs from garden level to living room balcony, rebuild and extension of the living room balcony, remodel of master bedroom, replace exist dining rm & master bedroom, window as indicated. | $100,000 | |
| Mar 21, 2008 | Completed final sign-off Mar 2009 | 3746 Jackson St | relocate moment frame to widen opening at garage door, refinish floor and walls, front yard landscape improvement, new walkway, stairs, driveway, retaining wall and new tree planting.Details
relocate moment frame to widen opening at garage door, refinish floor and walls, front yard landscape improvement, new walkway, stairs, driveway, retaining wall and new tree planting. | $80,000 | |
| Jul 11, 2007 | Completed final sign-off Dec 2007 | 188 Minna St | Whitehouse Builders | in unit #37a-add dropped ceiling at living room and master bedroom. add new soffit at guest bedroom, add new recessed lighting at above area in living and bedroom. install drywall, finish and paint at new ceilings.Details
in unit #37a-add dropped ceiling at living room and master bedroom. add new soffit at guest bedroom, add new recessed lighting at above area in living and bedroom. install drywall, finish and paint at new ceilings. | $50,000 |
| Apr 7, 2006 | Completed final sign-off Oct 2007 | 3455 Pacific Av | new hot tub and stone terrace & steps/new retaining wallsDetails
new hot tub and stone terrace & steps/new retaining walls | $95,000 | |
| Feb 15, 2006 | Expired or cancelled expired Nov 2007 | 179 Jordan Av | remodel to single family residential house, involving horizontal & vertical extension at the rear of the lot, totalling appox. 400 sq.ft. new additin at the 2nd floor will not increase current height of the bldg, nor go beyond the maximum horzontal extent of the (e) building at the rear of the lot.Details
remodel to single family residential house, involving horizontal & vertical extension at the rear of the lot, totalling appox. 400 sq.ft. new additin at the 2nd floor will not increase current height of the bldg, nor go beyond the maximum horzontal extent of the (e) building at the rear of the lot. | $100,000 | |
| Nov 29, 2005 | Expired or cancelled expired Sep 2008 | 2218 Lyon St | Charles Edward Construction Inc | remodel (e) kid's bathroom-new finishes & fixtures, plumbing & electrical upgrades, new shower pan. remodel (e) master bathroom. new finishes & fixtures, plumbing & electrical upgrades, new shower pan. all work @ 3rd floor.Details
remodel (e) kid's bathroom-new finishes & fixtures, plumbing & electrical upgrades, new shower pan. remodel (e) master bathroom. new finishes & fixtures, plumbing & electrical upgrades, new shower pan. all work @ 3rd floor. | $41,650 |
| Jul 29, 2005 | Completed final sign-off Nov 2006 | 2218 Lyon St | Charles Edward Construction Inc | remodel basement.(e)stair into(n)family room,(n)laundry room,(n)project room,(n)full bath,(n)mech rmDetails
remodel basement.(e)stair into(n)family room,(n)laundry room,(n)project room,(n)full bath,(n)mech rm | $150,000 |
| Jul 29, 2005 | Expired or cancelled withdrawn Aug 2005 | 3746 Jackson St | addition of 160sf bedroom at 3rd fl over exist roof deck.Details
addition of 160sf bedroom at 3rd fl over exist roof deck. | $50,000 | |
| Oct 25, 2004 | Completed final sign-off Jan 2006 | 3401 Washington St | Muratore Inc | repair water damage over kitchen and enclose existing deck on 2/f area over kitchenDetails
repair water damage over kitchen and enclose existing deck on 2/f area over kitchen | $25,000 |
| Jan 8, 2002 | Completed final sign-off Jan 2003 | 2373 Filbert St | horizontal addition-addition to rear of building, fill in below existing 2nd floor space, add new frDetails
horizontal addition-addition to rear of building, fill in below existing 2nd floor space, add new fr | $20,000 |