Benjamin Mcgriff
- Listed as
- architect, designer
- Firm
- Mcgriff Architects
- Based in
- San Francisco
- On San Francisco permits
- Oct 2013 to Aug 2026
97 permits since 2000 (architect on 94 permits, designer on 3 permits): 50 completed, 15 in progress, 17 never finaled, 15 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 3756 Jackson St | Clayton Timbrell & Co | to comply with notice of correction 202205254937 dated 5/12/26 replace stairs @ rear yard as means of egress.Details
to comply with notice of correction 202205254937 dated 5/12/26 replace stairs @ rear yard as means of egress. | $20,603 |
| Jun 24, 2026 | In progress issued Aug 2026 | 3828 Jackson St | Plath & Company Inc | revision to approved pa#: 202504255210 and 202501279110r1. condensor units (n) locations at south & north yards, addition of () wood trellised screen, (n) brick patio at grade and modification of landscape and lawn bed on front yard. no interior work.no structural work under this permit.Details
revision to approved pa#: 202504255210 and 202501279110r1. condensor units (n) locations at south & north yards, addition of () wood trellised screen, (n) brick patio at grade and modification of landscape and lawn bed on front yard. no interior work.no structural work under this permit. | $32,000 |
| Apr 17, 2026 | In progress filed Apr 2026, not yet issued | 3878 Clay St | Arrow Builders Inc | (n) fixtures and fittings, appliances, finishes at (e) locations at kitchen & 2 bathrooms, non struct partions & steam shower, change to shower at guest bath (n) pocket doors added to (e) openning (n) sconic lightng and (n) outlets, reconfigure of outlet heights.Details
(n) fixtures and fittings, appliances, finishes at (e) locations at kitchen & 2 bathrooms, non struct partions & steam shower, change to shower at guest bath (n) pocket doors added to (e) openning (n) sconic lightng and (n) outlets, reconfigure of outlet heights. | $200,000 |
| Feb 27, 2026 | In progress issued Mar 2026 | 3828 Jackson St | Plath & Company Inc | revision to permit 202501279110. revised basement interior layout due to conditions uncovered during demolition, including insufficient slab thickness and missing interior footings. new structural slab in accordance with geotech req'd per supplemental letter. removal of (e) windows and lightwellDetails
revision to permit 202501279110. revised basement interior layout due to conditions uncovered during demolition, including insufficient slab thickness and missing interior footings. new structural slab in accordance with geotech req'd per supplemental letter. removal of (e) windows and lightwell | $100,000 |
| Dec 19, 2025 | In progress filed Dec 2025, not yet issued | 56 Encanto Av | Spectrum Development Co. | remodel the existing building footprint including partial capture of the lower level and interior courtyard for the conditional space, revised floor plans, update to fixtures and finishes, updated lightening & power, structural improvements including new shear walls. exterior work includes revisedDetails
remodel the existing building footprint including partial capture of the lower level and interior courtyard for the conditional space, revised floor plans, update to fixtures and finishes, updated lightening & power, structural improvements including new shear walls. exterior work includes revised | $500,000 |
| Dec 5, 2025 | Expired or cancelled withdrawn Feb 2026 | 490 Avila St | revise to 202209212892 & 202506118474: showwing corrected dimensions at driveway gate (reflecting increased height)Details
revise to 202209212892 & 202506118474: showwing corrected dimensions at driveway gate (reflecting increased height) | ||
| Nov 3, 2025 | In progress issued Nov 2025 | 3828 Jackson St | Plath & Company Inc | revision to 202504255210 new rear yard patio along northern edge of property line, no interior work, remove fence from approved 202504255210 infill abandoned doorway and stair modify patio foundationDetails
revision to 202504255210 new rear yard patio along northern edge of property line, no interior work, remove fence from approved 202504255210 infill abandoned doorway and stair modify patio foundation | |
| Oct 28, 2025 | In progress issued Oct 2025 | 490 Avila St | Dowbuilt Inc. | revision to pa # 2022-921-2892 & 2025-0124-9064: revise layout of primary suite and bathroom. revise steps into main level living room. no plumbing fixtures.Details
revision to pa # 2022-921-2892 & 2025-0124-9064: revise layout of primary suite and bathroom. revise steps into main level living room. no plumbing fixtures. | |
| Oct 15, 2025 | In progress issued Nov 2025 | 3756 Jackson St | Clayton Timbrell & Co | revision to pa# 202205254937, mechanical penthouse change of scope due to value engineering. no change to footprint; lower overall height by 18"; remove openings to simplify wall framing; change to wood cladding from weight reasons.Details
revision to pa# 202205254937, mechanical penthouse change of scope due to value engineering. no change to footprint; lower overall height by 18"; remove openings to simplify wall framing; change to wood cladding from weight reasons. | $50,000 |
| Apr 25, 2025 | In progress issued Jul 2025 | 3828 Jackson St | Plath & Company Inc | new rear yard patio and fence along northern edge of property. no interior workDetails
new rear yard patio and fence along northern edge of property. no interior work | $50,000 |
| Jan 27, 2025 | In progress issued Feb 2025 | 3828 Jackson St | interior modifications including kitchen, bathroom, and basement remodel, exterior modifications to extend lightwell and enlarge window openings at rear elevation and basement level, and replacement of existing skylight. inc. structural, electrical, mechanical, and plumbing.Details
interior modifications including kitchen, bathroom, and basement remodel, exterior modifications to extend lightwell and enlarge window openings at rear elevation and basement level, and replacement of existing skylight. inc. structural, electrical, mechanical, and plumbing. | $480,000 | |
| Jan 24, 2025 | In progress issued Feb 2025 | 490 Avila St | Dowbuilt Inc. | revision to pa# 202209212892: to eliminate some previously planned scopes of work, partially reconfigure interior including minor framing and shear wall revisions, revise lighting plan, minor modifications to exterior windows and doors.Details
revision to pa# 202209212892: to eliminate some previously planned scopes of work, partially reconfigure interior including minor framing and shear wall revisions, revise lighting plan, minor modifications to exterior windows and doors. | |
| Dec 30, 2024 | In progress filed Dec 2024, not yet issued | 37 Magnolia St | rear yard - permit to legalize rear yard fence.Details
rear yard - permit to legalize rear yard fence. | $600 | |
| Dec 15, 2023 | In progress issued Apr 2024 | 2302 Steiner St | two fl. reclamation of eastern ligtwell to bring basement stair to code, remodel of int spaces on 1st fl., reconfigure of north facade to accommodate (n) door to courtyard exterior modifications incl (n) patio in (e) courtyard, opening the southern wall of unconditiond garage &Details
two fl. reclamation of eastern ligtwell to bring basement stair to code, remodel of int spaces on 1st fl., reconfigure of north facade to accommodate (n) door to courtyard exterior modifications incl (n) patio in (e) courtyard, opening the southern wall of unconditiond garage & | $237,000 | |
| Sep 14, 2023 | Completed final sign-off Jul 2026 | 331 Elsie St | J R Home Remodeling Inc, Spectrum Development Co. | partial foundation replacment to create habitable space/legal bedroom @ heated front of house,gr lvl. minor exterior work to depress entry patio, replace (e)window in-kind to meet egress requirementsDetails
partial foundation replacment to create habitable space/legal bedroom @ heated front of house,gr lvl. minor exterior work to depress entry patio, replace (e)window in-kind to meet egress requirements | $75,000 |
| Sep 21, 2022 | In progress issued Nov 2023 | 490 Avila St | Dowbuilt Inc. | interior revised floor plans. updates to fixtures & finishes. updated lighting & power throughout. structural improvements to foundations at some locations. exterior work includes modifications to several windows & doors. replace windows in-kind at upper levels. infill (e) lightwell on east facade.Details
interior revised floor plans. updates to fixtures & finishes. updated lighting & power throughout. structural improvements to foundations at some locations. exterior work includes modifications to several windows & doors. replace windows in-kind at upper levels. infill (e) lightwell on east facade. | $1,500,000 |
| Jun 28, 2022 | Expired or cancelled cancelled Aug 2025 | 436 Eureka St | alter site permit# 2018-1009-2526-s to conform with exhibit 9 of appeal # 22-013 bpa# 2022-0527-5182Details
alter site permit# 2018-1009-2526-s to conform with exhibit 9 of appeal # 22-013 bpa# 2022-0527-5182 | ||
| Jun 15, 2022 | Completed final sign-off Dec 2025 | 619 Marina Bl | planning enforcement case no.2021-009773enf: plans to permit previously installed unpermitted windows throughout house. no work outside of existing building envelope.Details
planning enforcement case no.2021-009773enf: plans to permit previously installed unpermitted windows throughout house. no work outside of existing building envelope. | $35,000 | |
| May 27, 2022 | Never finaled issued Jun 2022, no final | 436 Eureka St | per board of appeals decision 22-013 revise permit app. 201810092526 tp reflect changes found on shets boa1, boa2, boa3 and boa4Details
per board of appeals decision 22-013 revise permit app. 201810092526 tp reflect changes found on shets boa1, boa2, boa3 and boa4 | ||
| May 25, 2022 | In progress issued Apr 2024 | 3756 Jackson St | Clayton Timbrell & Co | renovation of sfr. sow includes lower ground fl to create compliant ceiling height & upgrade fl layout. kitchen & bath remodel on all fl. lower 3rd fl ceiling height. exterior window & roof waterproofing / finishes. gh# 863-450-5651. ** maher: yes **Details
renovation of sfr. sow includes lower ground fl to create compliant ceiling height & upgrade fl layout. kitchen & bath remodel on all fl. lower 3rd fl ceiling height. exterior window & roof waterproofing / finishes. gh# 863-450-5651. ** maher: yes ** | $1,200,000 |
| Apr 14, 2021 | Completed final sign-off Jan 2022 | 15 Presidio Tr | The Toboni Group | new exterior deck at 2nd level less than 10' above grade. removel of railing from (e) door. work is within required rear + side yard. no facade work. no work in prow.Details
new exterior deck at 2nd level less than 10' above grade. removel of railing from (e) door. work is within required rear + side yard. no facade work. no work in prow. | $75,000 |
| Mar 24, 2021 | Never finaled issued Sep 2022, no final | 2825 Broadway | Brian Mac Namara Construction, Excel Site Services Inc | extension of (e) single family elevator to serve top 2 levels. replace (e) elevator. work also includes modification to adjacent dormer and attic level roof line.Details
extension of (e) single family elevator to serve top 2 levels. replace (e) elevator. work also includes modification to adjacent dormer and attic level roof line. | $50,000 |
| Feb 27, 2021 | Completed final sign-off Jun 2024 | 2420 Pacific Av | The Toboni Group | exterior modifications including an enlarged balcony at the rear of the building, and a new roof deck with minimum height sliding roof hatch access. this exterior scope of work accompanies an interior scope of work under separate pa #2020-1021-7019.Details
exterior modifications including an enlarged balcony at the rear of the building, and a new roof deck with minimum height sliding roof hatch access. this exterior scope of work accompanies an interior scope of work under separate pa #2020-1021-7019. | $862,000 |
| Nov 9, 2020 | Completed final sign-off Feb 2023 | 3625 Buchanan St | Christopher Gate Construction Inc | 2nd flr(two story building at rear of lot) - second floor residential remodel, with new bathroom, kitchen, and bedroom. change of use @ ground flr under pa#202009265117Details
2nd flr(two story building at rear of lot) - second floor residential remodel, with new bathroom, kitchen, and bedroom. change of use @ ground flr under pa#202009265117 | $234,000 |
| Oct 21, 2020 | Completed final sign-off Aug 2026 | 2420 Pacific Av | The Toboni Group | interior remodel & modifications including (n) elevator & foundation retrofit; minor relocation (without area reduction) of (e) housekeeper's unit to accommodate (n) elevatorDetails
interior remodel & modifications including (n) elevator & foundation retrofit; minor relocation (without area reduction) of (e) housekeeper's unit to accommodate (n) elevator | $862,000 |
| Sep 26, 2020 | Completed final sign-off Feb 2023 | 3625 Buchanan St | Christopher Gate Construction Inc | groud flr(two story building at rear of lot) - ground floor modifications to accommodate new yoga studio with guest yogi suite(office). remodeling of 2nd flr residential unit under pa# 202011098527.Details
groud flr(two story building at rear of lot) - ground floor modifications to accommodate new yoga studio with guest yogi suite(office). remodeling of 2nd flr residential unit under pa# 202011098527. | $350,000 |
| Feb 21, 2020 | Never finaled issued Jul 2020, no final | 1836 Golden Gate Av | Ronan O'dea Inc Dba O'dea Ronan Inc | remodel of e kitchen and e bath. replacement of some e windows in kind. not visiable from street. all work on 2nd floor.Details
remodel of e kitchen and e bath. replacement of some e windows in kind. not visiable from street. all work on 2nd floor. | $30,000 |
| Dec 17, 2019 | Completed final sign-off Apr 2022 | 36 Kronquist Ct | Spectrum Development Co. | alterations to existing split level house. conversion of open air main entrance to conditioned interior space. new master suite, remodel of kitchen & bathroom. new conditioned 751 sq ft. no changes to be made to front facadeDetails
alterations to existing split level house. conversion of open air main entrance to conditioned interior space. new master suite, remodel of kitchen & bathroom. new conditioned 751 sq ft. no changes to be made to front facade | $65,000 |
| Jul 16, 2019 | Completed final sign-off Sep 2019 | 371 Elsie St | Spectrum Development Co. | replace (e) balcony with new roof, replace sliding door with new window (max u-factor 0.32), adjust closet doors in bedroom.Details
replace (e) balcony with new roof, replace sliding door with new window (max u-factor 0.32), adjust closet doors in bedroom. | $5,000 |
| Jul 3, 2019 | Completed final sign-off Feb 2021 | 1053 Tennessee St | Itu Construction | (rear bldg)administrative certifcate of appropriateness to add property line window not shown in elevations from prvious site permit(201703030667)Details
(rear bldg)administrative certifcate of appropriateness to add property line window not shown in elevations from prvious site permit(201703030667) | $400 |
| Jun 21, 2019 | Never finaled issued Jul 2019, no final | 619 Marina Bl | Avonmore Construction Inc | renovation of existing kitchen & powder room.Details
renovation of existing kitchen & powder room. | $75,000 |
| Jun 21, 2019 | Completed final sign-off Jun 2021 | 289 29th Av | Lee & Company Contractors Inc | interior remodel of basement. new lowered foundation. additional new conditioned space. new full bath. renovated laundry room. new driveway at rearDetails
interior remodel of basement. new lowered foundation. additional new conditioned space. new full bath. renovated laundry room. new driveway at rear | $400,000 |
| Jun 12, 2019 | Expired or cancelled withdrawn Feb 2023 | 3756 Jackson St | Lee & Company Contractors Inc | facade restoration and roof replacement of historic home. front facade currently water damaged & leaking on the front & side facades, replace windows & balcony doors, apply new waterproofing,replace ornamental & flat plaster on roof, restore parapet, replace roof, replace skylight. no interior work.Details
facade restoration and roof replacement of historic home. front facade currently water damaged & leaking on the front & side facades, replace windows & balcony doors, apply new waterproofing,replace ornamental & flat plaster on roof, restore parapet, replace roof, replace skylight. no interior work. | $380,000 |
| Jun 5, 2019 | Expired or cancelled cancelled Dec 2022 | 1053 Tennessee St | Itu Construction | main house. roof replacement only on (e) residence. no other work. for other cope of work on same residence, see previous pa# 2017/03/03/0666& pa# 2017/03/03/0667.Details
main house. roof replacement only on (e) residence. no other work. for other cope of work on same residence, see previous pa# 2017/03/03/0666& pa# 2017/03/03/0667. | $20,000 |
| May 17, 2019 | Expired or cancelled cancelled Jan 2026 | 2521 Octavia St | subterranean expansion of (e) garage, new interior stairs and limited interior renovation at first and second floors. updates to garage facade and front entry terraceDetails
subterranean expansion of (e) garage, new interior stairs and limited interior renovation at first and second floors. updates to garage facade and front entry terrace | $500,000 | |
| Apr 4, 2019 | Completed final sign-off May 2021 | 223 Spruce St | Jeff King And Company Inc | remove rear facing baydoor and replace with in wall french doors and sidelites.Details
remove rear facing baydoor and replace with in wall french doors and sidelites. | $4,000 |
| Mar 13, 2019 | Completed final sign-off May 2021 | 223 Spruce St | Jeff King And Company Inc | revision to pa# 201811196305 to include renovation of bathroom and office on third floor, no work or changes to exterior.Details
revision to pa# 201811196305 to include renovation of bathroom and office on third floor, no work or changes to exterior. | $25,000 |
| Jan 28, 2019 | Completed final sign-off Nov 2019 | 173 Christopher Dr | Avonmore Construction Inc | remodel existing bathroom on 1st floor by lowering tub, adding bigger windows and new skylight, bring electrical and plumbing to code.Details
remodel existing bathroom on 1st floor by lowering tub, adding bigger windows and new skylight, bring electrical and plumbing to code. | $20,000 |
| Jan 17, 2019 | Completed final sign-off Mar 2019 | 3367 Washington St | Gray Industries Inc | revision to pa #201809059211 to rmeove skylight & parapet wall at top level, removal of title 24 fenestration installatiom, space conditioning systems and duct leakage.Details
revision to pa #201809059211 to rmeove skylight & parapet wall at top level, removal of title 24 fenestration installatiom, space conditioning systems and duct leakage. | |
| Dec 20, 2018 | Never finaled issued Aug 2021, no final | 2741 Hyde St | Trinity Building Co Llc | vertical & horizontal expansion w/ facade & fenestration improvements & interior renovation. total of 1637 sq.ft of flr area added. add an additional 3rd unit at ground flr. **maher n/a**Details
vertical & horizontal expansion w/ facade & fenestration improvements & interior renovation. total of 1637 sq.ft of flr area added. add an additional 3rd unit at ground flr. **maher n/a** | $1,200,000 |
| Dec 20, 2018 | Expired or cancelled withdrawn Jan 2019 | 2741 Hyde St | Trinity Building Co Llc | new a 623 sq.ft adu per ord# 162-16 @ ground flr and horizontal expansion @ rear as part of full building renovation under separate permit# 2018-1220-8879 s. **maher n/a**Details
new a 623 sq.ft adu per ord# 162-16 @ ground flr and horizontal expansion @ rear as part of full building renovation under separate permit# 2018-1220-8879 s. **maher n/a** | $150,000 |
| Nov 19, 2018 | Completed final sign-off May 2021 | 223 Spruce St | Jeff King And Company Inc | first floor work, minor wall alteration on the second floor, walls are relocated to accommodate renovation of two bedroom and a master bedroom and two bathroom. all work is interior.Details
first floor work, minor wall alteration on the second floor, walls are relocated to accommodate renovation of two bedroom and a master bedroom and two bathroom. all work is interior. | $180,000 |
| Oct 18, 2018 | Expired or cancelled cancelled Mar 2020 | 1868 Greenwich St | remove & replace (e) double hung wood windows with fl to ceiling windows & glass patio doors per plans & elevations. remove & replace existing wood guard balustrade at front porch & stair with glass guardDetails
remove & replace (e) double hung wood windows with fl to ceiling windows & glass patio doors per plans & elevations. remove & replace existing wood guard balustrade at front porch & stair with glass guard | $1,000 | |
| Oct 9, 2018 | Never finaled issued Feb 2022, no final | 436 Eureka St | Perez Construction Llc. | horizontal expansion @ rear of all levels.(n) interior stair to connect all levels. remodel & reconfigure interior walls throughout per plans. excavate & expand existing garage.(n) doors and windows per elevations, new 2 beds & 2 baths.in ground hot tub location in rear yard.remodel kitchenDetails
horizontal expansion @ rear of all levels.(n) interior stair to connect all levels. remodel & reconfigure interior walls throughout per plans. excavate & expand existing garage.(n) doors and windows per elevations, new 2 beds & 2 baths.in ground hot tub location in rear yard.remodel kitchen | $800,000 |
| Sep 11, 2018 | Expired or cancelled withdrawn Nov 2022 | 46 Caselli Av | rebuild (e) rear deck w/ stairs & property line firewall to grade. infill an (e) lightwell. convert (e) occupiable space @ rear of level one into habitable space & provide (n) interior stair to connect level 1 to 2.Details
rebuild (e) rear deck w/ stairs & property line firewall to grade. infill an (e) lightwell. convert (e) occupiable space @ rear of level one into habitable space & provide (n) interior stair to connect level 1 to 2. | $375,000 | |
| Sep 5, 2018 | Completed final sign-off Mar 2019 | 3367 Washington St | Gray Industries Inc | 201809119637project proposes the renovation of (e) bath on 4th fl, vaulting on (e) attic ceiling, and 1 (n) skylight along with minor cosmetic updates throughoutDetails
201809119637project proposes the renovation of (e) bath on 4th fl, vaulting on (e) attic ceiling, and 1 (n) skylight along with minor cosmetic updates throughout | $55,000 |
| Aug 21, 2018 | Expired or cancelled cancelled Jan 2026 | 3092 16th St | Hasz Construction Inc | revision to approved bap# 2018-0702-3518 floor plans. delete 2 small rooms due to fire sprinklers permit.Details
revision to approved bap# 2018-0702-3518 floor plans. delete 2 small rooms due to fire sprinklers permit. | |
| Jul 2, 2018 | Never finaled issued Jul 2018, no final | 3092 16th St | Hasz Construction Inc | adjust kitchen size and move 2 bathrooms, updating one to be accessible for the restaurant spaceDetails
adjust kitchen size and move 2 bathrooms, updating one to be accessible for the restaurant space | $250,000 |
| Jun 7, 2018 | Completed final sign-off Aug 2021 | 3 Helen St | Avonmore Construction Inc | horizontal addition @ 4th fl. total of 67 sq ft **maher n/a**Details
horizontal addition @ 4th fl. total of 67 sq ft **maher n/a** | $75,000 |
| May 30, 2018 | Completed final sign-off Jan 2020 | 266 Coleridge St | Spectrum Development Co. | add one adu (825 sqft) to an (e) (4) unit building in bernal heights per ordinance #162-16 & fs-05.Details
add one adu (825 sqft) to an (e) (4) unit building in bernal heights per ordinance #162-16 & fs-05. | $50,000 |
| May 17, 2018 | Expired or cancelled cancelled Jan 2026 | 3032 Franklin St | new roof deck with exterior stair for (e0 top floor unit. remove interior walls.Details
new roof deck with exterior stair for (e0 top floor unit. remove interior walls. | $65,000 | |
| May 3, 2018 | Expired or cancelled cancelled Nov 2024 | 134 Hearst Av | vertical addition to an (e) 2 story single family home. remodel (e) unit.Details
vertical addition to an (e) 2 story single family home. remodel (e) unit. | $400,000 | |
| Apr 26, 2018 | Completed final sign-off Oct 2018 | 280 14th St | administrative permit only to expand bar retail area within alowable limit. no new architectural work. no new construction. maher n/a.Details
administrative permit only to expand bar retail area within alowable limit. no new architectural work. no new construction. maher n/a. | ||
| Jan 5, 2018 | Never finaled issued Jan 2018, no final | 3127 Fillmore St | Pars Design & Construction | update boh pastry kitchen layout with new prep sink, hand sinks, work counter, refrigeration units and add electrical outlets. update boh prep room with new sinks and dishwasher. all existing lighting to remain. no new lightingDetails
update boh pastry kitchen layout with new prep sink, hand sinks, work counter, refrigeration units and add electrical outlets. update boh prep room with new sinks and dishwasher. all existing lighting to remain. no new lighting | $12,000 |
| Jan 5, 2018 | Never finaled issued Jan 2018, no final | 201 Pixley St | Pars Design & Construction | update both pastry kitchen layout with new prep sink, hand sinks, work counter, refrigeration units and add electrical outlets. update both prep room with new sinks and dishwasher. all existing lighting to remain. no new lightingDetails
update both pastry kitchen layout with new prep sink, hand sinks, work counter, refrigeration units and add electrical outlets. update both prep room with new sinks and dishwasher. all existing lighting to remain. no new lighting | $8,000 |
| Aug 15, 2017 | Never finaled issued Sep 2017, no final | 68 Mccoppin St | Doyle Contracting Inc | infill (e) windows at property line due to adjacent future building construction.Details
infill (e) windows at property line due to adjacent future building construction. | $5,000 |
| Aug 14, 2017 | Completed final sign-off Feb 2018 | 2833 Sacramento St | Gray Industries Inc | front stair to be removed and replace with one that matches facade better. n/a for maher.Details
front stair to be removed and replace with one that matches facade better. n/a for maher. | $8,000 |
| Jul 13, 2017 | Completed final sign-off Feb 2018 | 2833 Sacramento St | Gray Industries Inc | removing 2 chimney stacks, repairing/reconfiguring to adjust to missing stacks. adding one interior wall to unit #2837 to create an office.Details
removing 2 chimney stacks, repairing/reconfiguring to adjust to missing stacks. adding one interior wall to unit #2837 to create an office. | $8,000 |
| Jun 27, 2017 | Never finaled issued Jan 2018, no final | 3852 21st St | R & D Construction Co Inc | foundation replacement & excavation of the existing basement crawl space to create additoinal storage use.Details
foundation replacement & excavation of the existing basement crawl space to create additoinal storage use. | $15,000 |
| Jun 26, 2017 | Completed final sign-off Apr 2018 | 3131 Fillmore St | Pars Design & Construction | renovation of (e) wine bar to include new bar counter top, bathroom renovation to accomodate handicap; replace existing connecting stairs to basementDetails
renovation of (e) wine bar to include new bar counter top, bathroom renovation to accomodate handicap; replace existing connecting stairs to basement | $80,000 |
| May 11, 2017 | Completed final sign-off Apr 2018 | 301 El Camino Del Mar | Clayton Timbrell & Co | revision to pa#201611082232, convert bath to powder room, addition bath on 2/f, plumbing and electrical under seperate permit, non structural.Details
revision to pa#201611082232, convert bath to powder room, addition bath on 2/f, plumbing and electrical under seperate permit, non structural. | $120,000 |
| Mar 8, 2017 | Completed final sign-off Jun 2019 | 900 Filbert St | Fay Construction & Restoration Inc | revision to 201510230636 to include one additional full bathroom. remove retail space at ground floor- no b occupancy to remain. move private roof deck out of rear yard setbackDetails
revision to 201510230636 to include one additional full bathroom. remove retail space at ground floor- no b occupancy to remain. move private roof deck out of rear yard setback | |
| Mar 3, 2017 | Completed final sign-off Feb 2021 | 1053 Tennessee St | Itu Construction | rear addition to an (e) front building of house to include a new kitchen, 1 bathroom & 1 bedroom.Details
rear addition to an (e) front building of house to include a new kitchen, 1 bathroom & 1 bedroom. | $600,000 |
| Mar 3, 2017 | Completed final sign-off Feb 2021 | 1053 Tennessee St | Itu Construction | (rear bldg). gut rehab of an (e) accessory dwelling to include a new dwelling unit (1 bed & 1 bath) & additional sq. ft. under an (e) projection (approx 50 sq.ft.), maher n/aDetails
(rear bldg). gut rehab of an (e) accessory dwelling to include a new dwelling unit (1 bed & 1 bath) & additional sq. ft. under an (e) projection (approx 50 sq.ft.), maher n/a | $150,000 |
| Feb 28, 2017 | Completed final sign-off May 2021 | 630 Page St | Restoration Workshop Ltd, Lee & Company Contractors Inc | historic restoration of front facade per original. new wood entry stair and mansard roofDetails
historic restoration of front facade per original. new wood entry stair and mansard roof | $15,000 |
| Jan 17, 2017 | Completed final sign-off Aug 2018 | 109 Quintara St | Spectrum Development Co. | interior renovation to include an addition of 19 conditioned sf at foyer and 10 sf balcony within bkd footprint, cosemtic remodel to front facade and entry portico. additional of (n) skylight over master bath.Details
interior renovation to include an addition of 19 conditioned sf at foyer and 10 sf balcony within bkd footprint, cosemtic remodel to front facade and entry portico. additional of (n) skylight over master bath. | $100,000 |
| Dec 14, 2016 | Completed final sign-off Aug 2017 | 630 Page St | Christopher Gate Construction Inc | voluntary strengthening retrofit to the (e) basemenmt with new laundry room and storage area and code compliant stair to first floor. removal of interior walls for new powder room and master suiteDetails
voluntary strengthening retrofit to the (e) basemenmt with new laundry room and storage area and code compliant stair to first floor. removal of interior walls for new powder room and master suite | $85,000 |
| Nov 15, 2016 | Never finaled issued Feb 2017, no final | 1053 Tennessee St | Itu Construction | demolition of existing deteriorated & not original sun porch to assess historic fabric and investigate any evidence of a historic stair by historic reservation planner jonathan vimr.Details
demolition of existing deteriorated & not original sun porch to assess historic fabric and investigate any evidence of a historic stair by historic reservation planner jonathan vimr. | $500 |
| Nov 15, 2016 | Expired or cancelled cancelled Oct 2022 | 1053 Tennessee St | front building. minor demolition of existing stucco to assess historical and investigate any evidence of a historic stair.Details
front building. minor demolition of existing stucco to assess historical and investigate any evidence of a historic stair. | $250 | |
| Oct 6, 2016 | Completed final sign-off Aug 2018 | 109 Quintara St | Spectrum Development Co. | new 400 sq ft roof deck & exterior wood stair on the south elevation.Details
new 400 sq ft roof deck & exterior wood stair on the south elevation. | $25,000 |
| Sep 20, 2016 | Completed final sign-off Mar 2017 | 2100 Pacific Av | Nova Designs Builds Inc | unit 9: removal of non-structural walls to create a new suite and relocate extg gymDetails
unit 9: removal of non-structural walls to create a new suite and relocate extg gym | $25,000 |
| Jul 19, 2016 | Completed final sign-off Mar 2018 | 373 Clipper St | Fay Construction & Restoration Inc | interior renovation of 2nd floor living area with new hallway,powder room & laundry room, as well as renovation of (e)3rd flr bathroom.changes to rear facade include the removal of an (e)window,relocation of (e)exterior door, & new transom window.Details
interior renovation of 2nd floor living area with new hallway,powder room & laundry room, as well as renovation of (e)3rd flr bathroom.changes to rear facade include the removal of an (e)window,relocation of (e)exterior door, & new transom window. | $85,000 |
| Jul 7, 2016 | Never finaled issued Jul 2016, no final | 1031 Jones St | Mcmahon Construction | interior renovation of master bathroom, cosmetic upgrades to (e) wood burning fireplaces, electrical upgrade throughout, new lighting in select areas and 8 sq ft addition to bathroom on north side of propertyDetails
interior renovation of master bathroom, cosmetic upgrades to (e) wood burning fireplaces, electrical upgrade throughout, new lighting in select areas and 8 sq ft addition to bathroom on north side of property | $90,000 |
| Jun 10, 2016 | Completed final sign-off Jan 2017 | 722 47th Av | Full Moon Construction | 132 sq ft infill addition below extg sunroom. new sunroom windows to match extg. new garage door.Details
132 sq ft infill addition below extg sunroom. new sunroom windows to match extg. new garage door. | $50,000 |
| Apr 29, 2016 | Completed final sign-off Jan 2017 | 319 Union St | Terry Mc Daniel Construction | remove wood column in garage and replace with steel moment frames. extg roof deck to be replaced in kind. interior improvements to unit #319 only. will maintain continuous stair to the roof. limited access to roof deck w/use of alarmed panic hardware w. approp. signage.Details
remove wood column in garage and replace with steel moment frames. extg roof deck to be replaced in kind. interior improvements to unit #319 only. will maintain continuous stair to the roof. limited access to roof deck w/use of alarmed panic hardware w. approp. signage. | $200,000 |
| Apr 12, 2016 | Completed final sign-off Mar 2018 | 2215 California St | Trinity Building Co Llc | (n) 409' sqft vertical addition (s) @ rear. (n) 289 sqft roof deck to replace existing. (n) spiral stair (egress) to rear yard. (n) reconfiguration of master bedroom suite.Details
(n) 409' sqft vertical addition (s) @ rear. (n) 289 sqft roof deck to replace existing. (n) spiral stair (egress) to rear yard. (n) reconfiguration of master bedroom suite. | $100,000 |
| Mar 29, 2016 | Expired or cancelled cancelled Jan 2026 | 538 Waller St | renovate basement and create garage. n/a ordinance #155-13Details
renovate basement and create garage. n/a ordinance #155-13 | $150,000 | |
| Mar 7, 2016 | Expired or cancelled cancelled Nov 2024 | 1348 South Van Ness Av | to demolish a detached garageDetails
to demolish a detached garage | $6,500 | |
| Jan 7, 2016 | Never finaled issued Jan 2016, no final | 90 Cedar St | Clayton Timbrell & Co | addition of an accessible bathroom to an existing single-story storage space, no change in use or occupancy; maher n/aDetails
addition of an accessible bathroom to an existing single-story storage space, no change in use or occupancy; maher n/a | $20,000 |
| Dec 17, 2015 | Never finaled issued Dec 2015, no final | 90 Ravenwood Dr | Chavez Plumbing | interior renovation of 1st floor bedroom and bathrooms and lower level basement in-law suite. cosmetic and lighting upgrades throughoutDetails
interior renovation of 1st floor bedroom and bathrooms and lower level basement in-law suite. cosmetic and lighting upgrades throughout | $75,000 |
| Dec 16, 2015 | Completed final sign-off Aug 2016 | 280 14th St | Eric F Anderson Incorporated | structural design of brewery tank anchorage. n/a for maher.Details
structural design of brewery tank anchorage. n/a for maher. | $5,000 |
| Dec 14, 2015 | Completed final sign-off Jul 2016 | 2990 Clay St | Amn Construction | unit 4, remodel (e) kitchen & 2 bathrooms. vault living room ceiling & relocate an (e) skyklight. provide new interior door to (e) den & a "bar niche"/counterspace in dining area. new fixtrues & finishes throughougDetails
unit 4, remodel (e) kitchen & 2 bathrooms. vault living room ceiling & relocate an (e) skyklight. provide new interior door to (e) den & a "bar niche"/counterspace in dining area. new fixtrues & finishes throughoug | $60,000 |
| Dec 2, 2015 | Completed final sign-off Sep 2016 | 1895 Pacific Av | Spectrum Development Co. | unit #102 - interior renovation the (e) bathroom, add an additional bathroom, relocate kitchen to (e) dining room, open a non-load bearing wall, & converting (e) kitchen into a bedroom, apartment footprint, fenestration & sq ft will not changes. n/a maher ordinanceDetails
unit #102 - interior renovation the (e) bathroom, add an additional bathroom, relocate kitchen to (e) dining room, open a non-load bearing wall, & converting (e) kitchen into a bedroom, apartment footprint, fenestration & sq ft will not changes. n/a maher ordinance | $75,000 |
| Nov 18, 2015 | Never finaled issued Jan 2016, no final | 280 14th St | Eric F Anderson Incorporated | commercial t.i. to 4503 sq.ft. light industial space to add a small beer manufacture & distribution facility. project also includes a small accessory tasting area. n/a ordinance #155-13Details
commercial t.i. to 4503 sq.ft. light industial space to add a small beer manufacture & distribution facility. project also includes a small accessory tasting area. n/a ordinance #155-13 | $125,000 |
| Nov 13, 2015 | Completed final sign-off Oct 2016 | 2914 Sacramento St | Clayton Timbrell & Co | reconstruction of front entry stair with code upgrades.Details
reconstruction of front entry stair with code upgrades. | |
| Sep 14, 2015 | Completed final sign-off Oct 2016 | 2914 Sacramento St | Clayton Timbrell & Co | revision to app#201507212032. structural changes to original permit including new headers with 8x18 steel beam.Details
revision to app#201507212032. structural changes to original permit including new headers with 8x18 steel beam. | $225,000 |
| Aug 11, 2015 | Expired or cancelled expired Nov 2017 | 555 04th St | Golden Gate Glass And Mirror Co Inc | security improvement at an existing ground floor balcony, balcony enclosure is not air tight or waterproof, maintain emergency egress from bedroom. n/a ordinance #155-13Details
security improvement at an existing ground floor balcony, balcony enclosure is not air tight or waterproof, maintain emergency egress from bedroom. n/a ordinance #155-13 | $4,000 |
| Jul 21, 2015 | Completed final sign-off Oct 2016 | 2914 Sacramento St | Clayton Timbrell & Co | remodel & reconfiguration to a single family, 2 story residential maintain (e) footprint. remove non-bearing interior walls in 1/f, leveling ceiling heights, level basement floor, interior finish upgrades to basement & 2/f level.Details
remodel & reconfiguration to a single family, 2 story residential maintain (e) footprint. remove non-bearing interior walls in 1/f, leveling ceiling heights, level basement floor, interior finish upgrades to basement & 2/f level. | $225,000 |
| Jun 19, 2015 | Completed final sign-off Dec 2015 | 169 Beulah St | Eastwood Development Incorporated | interior renovation of the existing kitchen & 2nd floor bathroom, replace one existing property line window in kitchen with 2 (1-hour) fire rated windows in kitchen. legalize unpermitted work on ground floor including playroom, hall & guest bedroom. house footprint & square footage will not change.Details
interior renovation of the existing kitchen & 2nd floor bathroom, replace one existing property line window in kitchen with 2 (1-hour) fire rated windows in kitchen. legalize unpermitted work on ground floor including playroom, hall & guest bedroom. house footprint & square footage will not change. | $100,000 |
| Jun 3, 2015 | Completed final sign-off Dec 2015 | 1 California St | Gci, Inc | 17th floor - non-structural demo - remove 3 walls, new open reception, carpet. ** maher: compliance with ordinance no# 155-13 not required **Details
17th floor - non-structural demo - remove 3 walls, new open reception, carpet. ** maher: compliance with ordinance no# 155-13 not required ** | $90,000 |
| Mar 25, 2015 | Completed final sign-off Oct 2015 | 850 Elizabeth St | Full Moon Construction | kitchen remodel w/change in floor plan. replace 4 windows, change lightingDetails
kitchen remodel w/change in floor plan. replace 4 windows, change lighting | $45,000 |
| Jan 22, 2015 | Completed final sign-off Jun 2015 | 3336 24th St | renovation of existing bar with improvements to include new bar and bathroom to ada code for new lessee.Details
renovation of existing bar with improvements to include new bar and bathroom to ada code for new lessee. | $80,000 | |
| Jan 8, 2015 | Completed final sign-off May 2016 | 1840 Scott St | comply with nov #201263341 - repair/replace rear deck & stairs in kind for #1840, 1842, 1844 scott street, (work in common area).Details
comply with nov #201263341 - repair/replace rear deck & stairs in kind for #1840, 1842, 1844 scott street, (work in common area). | $12,500 | |
| Aug 5, 2014 | Completed final sign-off Oct 2014 | 1836 Golden Gate Av | Ronan O'dea Inc Dba O'dea Ronan Inc | permit required for addition of bathroom in master bedroom. also replace extg window in kind (light well)Details
permit required for addition of bathroom in master bedroom. also replace extg window in kind (light well) | $30,000 |
| Jul 3, 2014 | Never finaled issued Jul 2014, no final | 333 Elsie St | Christopher Gate Construction Inc | revision to pa #201310108989: change one existing door to window not visible from street, remove closet below stair.Details
revision to pa #201310108989: change one existing door to window not visible from street, remove closet below stair. | |
| Feb 3, 2014 | Completed final sign-off Aug 2014 | 3066 25th St | Big Red Construction | remodel consisting of removal of inteiror partitoins, relocation of kitchen & bathroom at 2nd floor, new bedroom, replacement of stair to attic, and new windows & sliding door @ rear of bldg. structural upgrades throughout house. comply w/san francisco building code attachment b, table 4.Details
remodel consisting of removal of inteiror partitoins, relocation of kitchen & bathroom at 2nd floor, new bedroom, replacement of stair to attic, and new windows & sliding door @ rear of bldg. structural upgrades throughout house. comply w/san francisco building code attachment b, table 4. | $105,000 |
| Oct 15, 2013 | Completed final sign-off Aug 2016 | 966 Elizabeth St | Christopher Gate Construction Inc | a single story g/f addition of 214 sf is proposed at the rear of the residence on the northern side. the proposed would expand upon an (e) dining area and relocate a kitchen, laundry room and wc. the addition's basement will provide a full height unconditioned storageDetails
a single story g/f addition of 214 sf is proposed at the rear of the residence on the northern side. the proposed would expand upon an (e) dining area and relocate a kitchen, laundry room and wc. the addition's basement will provide a full height unconditioned storage | $150,000 |