Block 0582, lot 025
2420 Pacific Ave
- City’s use
- Single Family Residential
- Built
- 1908
- Stories
- 4
- Units
- 1
- Rooms
- 6 bedrooms, 4 bathrooms
- Building
- 10,467 sq ft
- Lot
- 6,764 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2024 | In progress issued Mar 2025 | 2420 Pacific Av | The Toboni Group | new retaining wall at west property lineDetails
new retaining wall at west property line | $10,000 |
| Sep 6, 2024 | In progress issued Sep 2024 | 2420 Pacific Av | The Toboni Group | replace/repair (e) front entry stair cladding in-kind due to leaks & cracking of (e) stone cladding on treads & risers. less than 50% repair work.Details
replace/repair (e) front entry stair cladding in-kind due to leaks & cracking of (e) stone cladding on treads & risers. less than 50% repair work. | $90,000 |
| Jun 1, 2023 | Completed final sign-off May 2024 | 2420 Pacific Av | Bay Alarm Company | installation of dedicated function sprinkler monitoring system for single family dwelling.Details
installation of dedicated function sprinkler monitoring system for single family dwelling. | $5,000 |
| Feb 25, 2022 | Completed final sign-off May 2024 | 2420 Pacific Av | R Lowy Fire Protection Inc | new fire sprinkler system underground for 4 story residential building per nfpa 13r. ref pa# 202010217019.Details
new fire sprinkler system underground for 4 story residential building per nfpa 13r. ref pa# 202010217019. | $63,500 |
| Feb 27, 2021 | Completed final sign-off Jun 2024 | 2420 Pacific Av | The Toboni Group | exterior modifications including an enlarged balcony at the rear of the building, and a new roof deck with minimum height sliding roof hatch access. this exterior scope of work accompanies an interior scope of work under separate pa #2020-1021-7019.Details
exterior modifications including an enlarged balcony at the rear of the building, and a new roof deck with minimum height sliding roof hatch access. this exterior scope of work accompanies an interior scope of work under separate pa #2020-1021-7019. | $862,000 |
| Nov 9, 2020 | Completed final sign-off Jun 2024 | 2420 Pacific Av | The Toboni Group | to comply with complaint #202051001 - exploratory work to evaluate foundation. remove concrete from basement to expose foundation elements 4x4 sections at each pier. not demolishing or touching any foundation. no exterior workDetails
to comply with complaint #202051001 - exploratory work to evaluate foundation. remove concrete from basement to expose foundation elements 4x4 sections at each pier. not demolishing or touching any foundation. no exterior work | $2,000 |
| Oct 21, 2020 | Completed final sign-off Aug 2026 | 2420 Pacific Av | The Toboni Group | interior remodel & modifications including (n) elevator & foundation retrofit; minor relocation (without area reduction) of (e) housekeeper's unit to accommodate (n) elevatorDetails
interior remodel & modifications including (n) elevator & foundation retrofit; minor relocation (without area reduction) of (e) housekeeper's unit to accommodate (n) elevator | $862,000 |
| Jun 24, 2020 | Completed final sign-off Jun 2024 | 2420 Pacific Av | The Toboni Group | removal of drywall patch & replace inkindDetails
removal of drywall patch & replace inkind | $2,000 |
| Dec 2, 2015 | Never finaled issued Dec 2015, no final | 2420 Pacific Av | street spaceDetails
street space | ||
| Jun 5, 2015 | Never finaled issued Jun 2015, no final | 2420 Pacific Av | street space permitDetails
street space permit | ||
| May 27, 2015 | Completed final sign-off May 2016 | 2420 Pacific Av | Crown Construction San Francisco | revision to 201301107646. interior changes at 2, 3, 4th floors. remove, relocate, add skylights. no change in use floor area. add glass rail at 4th fl rear.Details
revision to 201301107646. interior changes at 2, 3, 4th floors. remove, relocate, add skylights. no change in use floor area. add glass rail at 4th fl rear. | $180,000 |
| Jan 10, 2013 | Completed final sign-off May 2016 | 2420 Pacific Av | Crown Construction | 1/fl:remv(e)non-conform carport struc&add(n)garage door. convert (e)int storage rm to garage.reloc 2nd dwelling unit fr 4/fl to 1/fl,redu unit sz 1955to1490 sq ft(23.78% smaller). 2/fl:redu extr dr on east elev w/windw.3/fl:reloc closet.4/fl:remv 2dormers at rear of bld.bld 1 dormer at same loc.Details
1/fl:remv(e)non-conform carport struc&add(n)garage door. convert (e)int storage rm to garage.reloc 2nd dwelling unit fr 4/fl to 1/fl,redu unit sz 1955to1490 sq ft(23.78% smaller). 2/fl:redu extr dr on east elev w/windw.3/fl:reloc closet.4/fl:remv 2dormers at rear of bld.bld 1 dormer at same loc. | $75,000 |
| Dec 3, 2012 | Completed final sign-off May 2016 | 2420 Pacific Av | Crown Construction | 1st floor: interior remodel of kitchen w/ new windows and includes limited structural basement. reloation of (e) 2nd dwellings unit from top floor to basement level. dwelling unit will be reduced in size by 75% from 1958 sq ft to 1468 sq ft. interior renovation througout basement, relocation ofDetails
1st floor: interior remodel of kitchen w/ new windows and includes limited structural basement. reloation of (e) 2nd dwellings unit from top floor to basement level. dwelling unit will be reduced in size by 75% from 1958 sq ft to 1468 sq ft. interior renovation througout basement, relocation of | $250,000 |
| Apr 2, 2012 | Completed final sign-off Jul 2012 | 2420 Pacific Av | Crown Construction | demolition of (e) bathroom and remodel 2 new bathrooms with new electric and plumbing in kind.Details
demolition of (e) bathroom and remodel 2 new bathrooms with new electric and plumbing in kind. | $40,000 |
| Mar 8, 2010 | Expired or cancelled expired Nov 2011 | 2420 Pacific Av | Michael Heavey Construction | repair damaged deck & stairs at rear of building. repair to be in kind, provide new foundation for posts per plansDetails
repair damaged deck & stairs at rear of building. repair to be in kind, provide new foundation for posts per plans | $10,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.