Crown Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2009 to Aug 2013
- Last 24 months
- 0 permits filed
18 permits since 2000: 18 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2013 | Completed final sign-off Oct 2014 | 2699 Filbert St | kitchen, bath (4), powder room, other interior remodel. new elec plumbing in remodel areas. water heater upgrade. add batt insulation on the 4th fl. add full bath 4th floor.Details
kitchen, bath (4), powder room, other interior remodel. new elec plumbing in remodel areas. water heater upgrade. add batt insulation on the 4th fl. add full bath 4th floor. | $100,000 |
| Apr 15, 2013 | Completed final sign-off Oct 2014 | 2699 Filbert St | fill in at ne corner on ground level only including interior remodel, limited structural work associated w/ it.Details
fill in at ne corner on ground level only including interior remodel, limited structural work associated w/ it. | $325,000 |
| Jan 10, 2013 | Completed final sign-off May 2016 | 2420 Pacific Av | 1/fl:remv(e)non-conform carport struc&add(n)garage door. convert (e)int storage rm to garage.reloc 2nd dwelling unit fr 4/fl to 1/fl,redu unit sz 1955to1490 sq ft(23.78% smaller). 2/fl:redu extr dr on east elev w/windw.3/fl:reloc closet.4/fl:remv 2dormers at rear of bld.bld 1 dormer at same loc.Details
1/fl:remv(e)non-conform carport struc&add(n)garage door. convert (e)int storage rm to garage.reloc 2nd dwelling unit fr 4/fl to 1/fl,redu unit sz 1955to1490 sq ft(23.78% smaller). 2/fl:redu extr dr on east elev w/windw.3/fl:reloc closet.4/fl:remv 2dormers at rear of bld.bld 1 dormer at same loc. | $75,000 |
| Dec 3, 2012 | Completed final sign-off May 2016 | 2420 Pacific Av | 1st floor: interior remodel of kitchen w/ new windows and includes limited structural basement. reloation of (e) 2nd dwellings unit from top floor to basement level. dwelling unit will be reduced in size by 75% from 1958 sq ft to 1468 sq ft. interior renovation througout basement, relocation ofDetails
1st floor: interior remodel of kitchen w/ new windows and includes limited structural basement. reloation of (e) 2nd dwellings unit from top floor to basement level. dwelling unit will be reduced in size by 75% from 1958 sq ft to 1468 sq ft. interior renovation througout basement, relocation of | $250,000 |
| Oct 4, 2012 | Completed final sign-off Jun 2013 | 126 Arguello Bl | revision to appl #2012.0926.0697-1st flr:new garage door,relcoate entry door @ (e) gate. new full bath. 2nd flr: new stairs down to rumpus rm, infill of lightwell @ ktichen, new doors & window at rear of house,new deck at location of (e) patio. 3rd flr: enlarge baths,remove balcony & ext doorDetails
revision to appl #2012.0926.0697-1st flr:new garage door,relcoate entry door @ (e) gate. new full bath. 2nd flr: new stairs down to rumpus rm, infill of lightwell @ ktichen, new doors & window at rear of house,new deck at location of (e) patio. 3rd flr: enlarge baths,remove balcony & ext door | $20,000 |
| Sep 26, 2012 | Completed final sign-off Jun 2013 | 126 Arguello Bl | interior renovation of kitchen & bathrooms in place in kind. replace all fixtures & finisher. no structural workDetails
interior renovation of kitchen & bathrooms in place in kind. replace all fixtures & finisher. no structural work | $150,000 |
| May 18, 2012 | Completed final sign-off Jan 2013 | 1925 Pacific Av | remodel 2 bathrooms & kitchen, replace electrical and plumbing in bathrooms, new cabinets in kitchen, no change on walls and openings.Details
remodel 2 bathrooms & kitchen, replace electrical and plumbing in bathrooms, new cabinets in kitchen, no change on walls and openings. | $40,000 |
| Apr 2, 2012 | Completed final sign-off Jul 2012 | 2420 Pacific Av | demolition of (e) bathroom and remodel 2 new bathrooms with new electric and plumbing in kind.Details
demolition of (e) bathroom and remodel 2 new bathrooms with new electric and plumbing in kind. | $40,000 |
| Jan 26, 2012 | Completed final sign-off Jun 2012 | 121 Spruce St | remodel kitchen at 2nd fl: work includes cabinets, countertops, flooring & sinks. remodel master bath & guest bath on 3rd fl: tiles, flooring, vanities, showers & tub. no wall relocation.Details
remodel kitchen at 2nd fl: work includes cabinets, countertops, flooring & sinks. remodel master bath & guest bath on 3rd fl: tiles, flooring, vanities, showers & tub. no wall relocation. | $50,000 |
| Jul 18, 2011 | Completed final sign-off Aug 2011 | 1977 Jefferson St | remodel kitchen; new cabinets. remodel master bathroom.Details
remodel kitchen; new cabinets. remodel master bathroom. | $40,000 |
| Jun 7, 2011 | Completed final sign-off Jul 2011 | 185 Evelyn Wy | remove and replace around shower and waincotting. install new vanity.Details
remove and replace around shower and waincotting. install new vanity. | $8,000 |
| Jun 2, 2011 | Completed final sign-off Jun 2011 | 381 Teresita Bl | comply with his complaint 201137161. remove illegal kitchen. legalize existing 1/2 bathroom, storage room, and closetsDetails
comply with his complaint 201137161. remove illegal kitchen. legalize existing 1/2 bathroom, storage room, and closets | $400 |
| Dec 9, 2010 | Completed final sign-off Apr 2011 | 4271 26th St | strengthen existing framing for seismic improvement. replace garage floor framing in kind for seismic improvmentDetails
strengthen existing framing for seismic improvement. replace garage floor framing in kind for seismic improvment | $30,000 |
| Mar 9, 2010 | Completed final sign-off Jul 2010 | 717 Webster St | comply with cc-5703: items 1,2,3,4,5 (stair repair, kitchen remodel, fill holes,handrail)Details
comply with cc-5703: items 1,2,3,4,5 (stair repair, kitchen remodel, fill holes,handrail) | $5,000 |
| Feb 18, 2010 | Completed final sign-off May 2010 | 3527 21st St | remodel (e) half bath at third level: add (n) shower & tub (n) walk-in-closet. (n) laundry room, relocate (e) on-demand water heater. replace (e) rafter ties.Details
remodel (e) half bath at third level: add (n) shower & tub (n) walk-in-closet. (n) laundry room, relocate (e) on-demand water heater. replace (e) rafter ties. | $9,000 |
| Nov 25, 2009 | Completed final sign-off Jan 2010 | 349 Church St | demo bathroom, replace tile around tub, reposition faucets for shower. no new lighting. no structural or relocation of walls.Details
demo bathroom, replace tile around tub, reposition faucets for shower. no new lighting. no structural or relocation of walls. | $4,200 |
| Jul 22, 2009 | Completed final sign-off Nov 2009 | 726 04th Av | replacing kitchen cabinetsDetails
replacing kitchen cabinets | $10,000 |
| Jul 22, 2009 | Completed final sign-off Nov 2009 | 3939 17th St | retiling shower (bathroom remodel) replacing shower valves & fittingsDetails
retiling shower (bathroom remodel) replacing shower valves & fittings | $2,500 |