Back to kitchen remodel contractors
Crown Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2009 to Aug 2013
- Last 24 months
- 0 permits filed
18 permits since 2000: 18 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 9 completed. Typically 0 days from filing to permit and 138 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2013 | Completed final sign-off Oct 2014 | 2699 Filbert St | kitchen, bath (4), powder room, other interior remodel. new elec plumbing in remodel areas. water heater upgrade. add batt insulation on the 4th fl. add full bath 4th floor.Details
kitchen, bath (4), powder room, other interior remodel. new elec plumbing in remodel areas. water heater upgrade. add batt insulation on the 4th fl. add full bath 4th floor. | $100,000 |
| Dec 3, 2012 | Completed final sign-off May 2016 | 2420 Pacific Av | 1st floor: interior remodel of kitchen w/ new windows and includes limited structural basement. reloation of (e) 2nd dwellings unit from top floor to basement level. dwelling unit will be reduced in size by 75% from 1958 sq ft to 1468 sq ft. interior renovation througout basement, relocation ofDetails
1st floor: interior remodel of kitchen w/ new windows and includes limited structural basement. reloation of (e) 2nd dwellings unit from top floor to basement level. dwelling unit will be reduced in size by 75% from 1958 sq ft to 1468 sq ft. interior renovation througout basement, relocation of | $250,000 |
| Sep 26, 2012 | Completed final sign-off Jun 2013 | 126 Arguello Bl | interior renovation of kitchen & bathrooms in place in kind. replace all fixtures & finisher. no structural workDetails
interior renovation of kitchen & bathrooms in place in kind. replace all fixtures & finisher. no structural work | $150,000 |
| May 18, 2012 | Completed final sign-off Jan 2013 | 1925 Pacific Av | remodel 2 bathrooms & kitchen, replace electrical and plumbing in bathrooms, new cabinets in kitchen, no change on walls and openings.Details
remodel 2 bathrooms & kitchen, replace electrical and plumbing in bathrooms, new cabinets in kitchen, no change on walls and openings. | $40,000 |
| Jan 26, 2012 | Completed final sign-off Jun 2012 | 121 Spruce St | remodel kitchen at 2nd fl: work includes cabinets, countertops, flooring & sinks. remodel master bath & guest bath on 3rd fl: tiles, flooring, vanities, showers & tub. no wall relocation.Details
remodel kitchen at 2nd fl: work includes cabinets, countertops, flooring & sinks. remodel master bath & guest bath on 3rd fl: tiles, flooring, vanities, showers & tub. no wall relocation. | $50,000 |
| Jul 18, 2011 | Completed final sign-off Aug 2011 | 1977 Jefferson St | remodel kitchen; new cabinets. remodel master bathroom.Details
remodel kitchen; new cabinets. remodel master bathroom. | $40,000 |
| Jun 2, 2011 | Completed final sign-off Jun 2011 | 381 Teresita Bl | comply with his complaint 201137161. remove illegal kitchen. legalize existing 1/2 bathroom, storage room, and closetsDetails
comply with his complaint 201137161. remove illegal kitchen. legalize existing 1/2 bathroom, storage room, and closets | $400 |
| Mar 9, 2010 | Completed final sign-off Jul 2010 | 717 Webster St | comply with cc-5703: items 1,2,3,4,5 (stair repair, kitchen remodel, fill holes,handrail)Details
comply with cc-5703: items 1,2,3,4,5 (stair repair, kitchen remodel, fill holes,handrail) | $5,000 |
| Jul 22, 2009 | Completed final sign-off Nov 2009 | 726 04th Av | replacing kitchen cabinetsDetails
replacing kitchen cabinets | $10,000 |