Block 3557, lot 042
349 Church St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 12, 2016 | Never finaled issued May 2016, no final | 349 Church St | street spaceDetails
street space | ||
| Feb 10, 2016 | Never finaled issued Feb 2016, no final | 349 Church St | street spaceDetails
street space | ||
| May 6, 2015 | Never finaled issued May 2015, no final | 351 Church St | street spaceDetails
street space | ||
| Dec 17, 2014 | Completed final sign-off Jun 2016 | 349 Church St | comply with physical inspection report# cc-7248. legalize (e) rear deck & stairs. pull (e) upper deck back to 5' from p.l. build new 1 hour wall @ n. p.l. of lower deck. legalize (e) skylights. restore (e) attic to non-habitable storage space.Details
comply with physical inspection report# cc-7248. legalize (e) rear deck & stairs. pull (e) upper deck back to 5' from p.l. build new 1 hour wall @ n. p.l. of lower deck. legalize (e) skylights. restore (e) attic to non-habitable storage space. | $15,000 | |
| Aug 16, 2013 | Completed final sign-off Oct 2013 | 351 Church St | Grand Finishes | replace (6) windows in kind. (3 in front & 3 in back )Details
replace (6) windows in kind. (3 in front & 3 in back ) | $6,000 |
| Mar 1, 2013 | Completed final sign-off Apr 2013 | 349 Church St | Grand Finishes | drywal lgarage walls & ceiling, for condo conversion .Details
drywal lgarage walls & ceiling, for condo conversion . | $3,000 |
| Dec 14, 2010 | Completed final sign-off Apr 2011 | 351 Church St | Grand Finishes | remodel (e) kitchen, (e) bathroom, add (n) stack washer/dryer. add (n) powder rm. rework three doorways. upgrade eletrical serviceDetails
remodel (e) kitchen, (e) bathroom, add (n) stack washer/dryer. add (n) powder rm. rework three doorways. upgrade eletrical service | $44,484 |
| Nov 25, 2009 | Completed final sign-off Jan 2010 | 349 Church St | Crown Construction | demo bathroom, replace tile around tub, reposition faucets for shower. no new lighting. no structural or relocation of walls.Details
demo bathroom, replace tile around tub, reposition faucets for shower. no new lighting. no structural or relocation of walls. | $4,200 |
| May 26, 2009 | Completed final sign-off Oct 2009 | 351 Church St | replacement of waste pipe in bathroom tub at 2nd floor.Details
replacement of waste pipe in bathroom tub at 2nd floor. | $1,500 | |
| Mar 11, 2009 | Completed final sign-off Jul 2010 | 349 Church St | Tom Can Construction | removed illegal bedroom and bathroom at garage level at rear of garage. no permits. non habitable space. common area only.Details
removed illegal bedroom and bathroom at garage level at rear of garage. no permits. non habitable space. common area only. | $10,000 |
| Jul 30, 2008 | Completed final sign-off Aug 2008 | 349 Church St | San Francisco Summit Roofing | reroofing.Details
reroofing. | $29,300 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.