Kelton Finney
- Listed as
- architect, authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Bonza Engineering
- Based in
- San Francisco
- On San Francisco permits
- Nov 2009 to Sep 2023
74 permits since 2000 (engineer on 67 permits, architect on 5 permits, authorized agent-others on 1 permit, pmt consultant/expediter on 1 permit): 52 completed, 8 never finaled, 14 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2023 | Completed final sign-off Nov 2023 | 2920 Gough St | Bailey General Contracting Co Inc | voluntary lateral strengthening at the ground level.Details
voluntary lateral strengthening at the ground level. | $50,000 |
| Jan 23, 2023 | Expired or cancelled cancelled Aug 2024 | 1798 Mcallister St | commercial soft story retrofit. response to nov #20220540Details
commercial soft story retrofit. response to nov #20220540 | $25,000 | |
| Jan 23, 2023 | Expired or cancelled cancelled Aug 2024 | 700 Baker St | residential soft story retrofit. response to nov #20220540Details
residential soft story retrofit. response to nov #20220540 | $25,000 | |
| Jan 12, 2023 | Completed final sign-off Feb 2024 | 379 Noe St | Fay Construction & Restoration Inc | voluntary lateral strengthening in common area only. not to bring up to codeDetails
voluntary lateral strengthening in common area only. not to bring up to code | $10,000 |
| Jul 26, 2022 | Never finaled issued Oct 2022, no final | 25 Ford St | (e) kitchen, powder room, laundry & bathroom to be remodeled. exterior windows to be replaced in rear. exterior deck to be repaired. voluntary structural work to be included. deck replacement under separate permitDetails
(e) kitchen, powder room, laundry & bathroom to be remodeled. exterior windows to be replaced in rear. exterior deck to be repaired. voluntary structural work to be included. deck replacement under separate permit | $400,000 | |
| Dec 31, 2021 | Completed final sign-off Aug 2025 | 2543 16th Av | to comply with nov# 202182719. revision to no plan pa#. basement conversion. main level remodel of kitchen, bathrooms & bedrooms. alter (e) interior stairway to below work. ground level to include 2 (n) bedrooms, 1 bathroom, (n) rec room, (n) passsage way & door at garage.Details
to comply with nov# 202182719. revision to no plan pa#. basement conversion. main level remodel of kitchen, bathrooms & bedrooms. alter (e) interior stairway to below work. ground level to include 2 (n) bedrooms, 1 bathroom, (n) rec room, (n) passsage way & door at garage. | $269,545 | |
| Oct 25, 2021 | Completed final sign-off Dec 2021 | 1601 Hyde St | Counterforce Inc. | revision to pa# 202001212415 to increase cost of job & add 2" safety strip & automatic opener in compliance with ada per inspector. ** maher: n/a **Details
revision to pa# 202001212415 to increase cost of job & add 2" safety strip & automatic opener in compliance with ada per inspector. ** maher: n/a ** | $10,000 |
| Feb 4, 2021 | Completed final sign-off Oct 2021 | 1952 Irving St | Counterforce Inc. | repair existing corner column damaged by car collision. replace existing concrete pilaster with new pad footing.Details
repair existing corner column damaged by car collision. replace existing concrete pilaster with new pad footing. | $2,000 |
| Jan 28, 2021 | Expired or cancelled cancelled May 2023 | 1541 Grant Av | commercial: soft story retrofit using using cebc appendix a-4. (shared plans with 202101283504)Details
commercial: soft story retrofit using using cebc appendix a-4. (shared plans with 202101283504) | $63,152 | |
| Jan 28, 2021 | Expired or cancelled cancelled May 2023 | 1539 Grant Av | residential: soft story retrofit using using cebc appendix a-4. (shared plans with 202101283505)Details
residential: soft story retrofit using using cebc appendix a-4. (shared plans with 202101283505) | $85,336 | |
| Nov 3, 2020 | Completed final sign-off Nov 2022 | 2733 Mission St | Counterforce Inc. | soft-story retrofit using criteria 5 of iebc a-4. residential spaceDetails
soft-story retrofit using criteria 5 of iebc a-4. residential space | $30,842 |
| Nov 3, 2020 | Never finaled issued Jan 2021, no final | 3608 16th St | remove existing failing site cmu retaining wall. replace with wood retaining wall.Details
remove existing failing site cmu retaining wall. replace with wood retaining wall. | $7,500 | |
| Nov 3, 2020 | Completed final sign-off Nov 2022 | 2733 Mission St | Counterforce Inc. | soft-story retrofit using criteria 5 of iebc a-4. commercial space.Details
soft-story retrofit using criteria 5 of iebc a-4. commercial space. | $115,053 |
| Sep 5, 2020 | Completed final sign-off Apr 2021 | 1375 Hayes St | M F Construction | soft story retrofit per sfbc ch.4d 2016cebc appendix a-4Details
soft story retrofit per sfbc ch.4d 2016cebc appendix a-4 | $40,000 |
| Feb 13, 2020 | Never finaled issued Dec 2020, no final | 3350 18th St | Counterforce Inc. | mandatory soft story retrofit program with sfebc ch.4d using criteria 5 of cebc appendeix a4. to comply with nov201813131. commericialDetails
mandatory soft story retrofit program with sfebc ch.4d using criteria 5 of cebc appendeix a4. to comply with nov201813131. commericial | |
| Feb 13, 2020 | Completed final sign-off Jul 2021 | 3352 18th St | Counterforce Inc. | mandatory soft story retrofit program with sfebc ch.4d using criteria 5 of cebc appendeix a4. to comply with nov201813131. residential.Details
mandatory soft story retrofit program with sfebc ch.4d using criteria 5 of cebc appendeix a4. to comply with nov201813131. residential. | $45,000 |
| Feb 13, 2020 | Completed final sign-off Jul 2023 | 191 Duboce Av | Sgdm Llc | mandatory soft story retrofit per sfebc ch.4d using criteria 5 apendex a4, 2019 cbc; to comply with nov201719001.Details
mandatory soft story retrofit per sfebc ch.4d using criteria 5 apendex a4, 2019 cbc; to comply with nov201719001. | $20,000 |
| Jan 21, 2020 | Completed final sign-off Oct 2021 | 1601 Hyde St | Counterforce Inc. | commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #202001212414. to comply with nov #201803422.Details
commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #202001212414. to comply with nov #201803422. | |
| Jan 21, 2020 | Completed final sign-off Oct 2021 | 1601 Hyde St | Counterforce Inc. | residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #202001212415. to comply with nov #201803422.Details
residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #202001212415. to comply with nov #201803422. | $45,000 |
| Dec 9, 2019 | Completed final sign-off Aug 2022 | 230 Laidley St | Bailey General Contracting Co Inc | remodel of entry stair, addition of door to ground floor study/den & addition of awning to enter area.Details
remodel of entry stair, addition of door to ground floor study/den & addition of awning to enter area. | $94,000 |
| Nov 27, 2019 | Never finaled issued Dec 2019, no final | 137 Claremont Bl | Sinclair Realty Group Inc | all work to be done in rear of bulding. repair/support of (e) rear sun room.Details
all work to be done in rear of bulding. repair/support of (e) rear sun room. | $15,500 |
| Nov 15, 2019 | Expired or cancelled withdrawn Mar 2023 | 1236 Mason St | response to nov #201859272 to replace site retaining wall. to comply with nov #201859272.Details
response to nov #201859272 to replace site retaining wall. to comply with nov #201859272. | $10,000 | |
| Sep 5, 2019 | Completed final sign-off Nov 2019 | 3330 16th St | Bailey General Contracting Co Inc | revision to 201709158532 soft storyDetails
revision to 201709158532 soft story | |
| Aug 8, 2019 | Completed final sign-off Dec 2023 | 3991 24th St | M F Construction | residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $5,000 |
| Aug 8, 2019 | Completed final sign-off Dec 2023 | 3991 24th St | M F Construction | comercial: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
comercial: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $45,000 |
| Apr 8, 2019 | Completed final sign-off Mar 2020 | 260 Rose St | Corona Remodeling Inc | legalize unpermitted foundation upgradesDetails
legalize unpermitted foundation upgrades | $15,000 |
| Oct 16, 2018 | Completed final sign-off Jan 2020 | 135 Albion St | Bailey General Contracting Co Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $35,000 |
| Sep 19, 2018 | Expired or cancelled withdrawn Apr 2019 | 262 Church St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 (retail)Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 (retail) | $30,000 | |
| Sep 19, 2018 | Expired or cancelled withdrawn Apr 2019 | 262 Church St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 (residential)Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 (residential) | $15,000 | |
| Aug 20, 2018 | Completed final sign-off Jun 2019 | 2452 Hyde St | Derry Casey Builders Inc | rebuild (e) roof deck @ 2nd floor lightwell to address water damageDetails
rebuild (e) roof deck @ 2nd floor lightwell to address water damage | $8,000 |
| Jun 25, 2018 | Expired or cancelled cancelled Jan 2026 | 172 Castro St | voluntary ground floor seismic upgrade.Details
voluntary ground floor seismic upgrade. | $15,000 | |
| Jun 5, 2018 | Completed final sign-off Jul 2019 | 2345 Cabrillo St | soft story retrofit using sfebcDetails
soft story retrofit using sfebc | $45,000 | |
| Mar 16, 2018 | Completed final sign-off Dec 2018 | 1291 Sanchez St | partial foundation replacement and 1 hour walls at property line.Details
partial foundation replacement and 1 hour walls at property line. | $15,000 | |
| Feb 23, 2018 | Completed final sign-off Jan 2019 | 1550 Irving St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4; soft story retrofit using steelDetails
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4; soft story retrofit using steel | $45,000 | |
| Dec 18, 2017 | Never finaled issued Feb 2018, no final | 390 28th St | J Fitzsimmons Building Inc. | revision to 201506017636 to reflect framing conditions in the fieldDetails
revision to 201506017636 to reflect framing conditions in the field | |
| Dec 6, 2017 | Expired or cancelled expired Jun 2022 | 132 Clinton Pk | soft story using sfebc ch 4dDetails
soft story using sfebc ch 4d | $40,000 | |
| Nov 20, 2017 | Completed final sign-off Apr 2019 | 540 Clayton St | M F Construction | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4 | $45,000 |
| Nov 10, 2017 | Completed final sign-off May 2018 | 3526 Anza St | partial foundation replacement at east property line.Details
partial foundation replacement at east property line. | $10,000 | |
| Oct 23, 2017 | Never finaled issued Oct 2017, no final | 1485 Noe St | J Fitzsimmons Building Inc. | revision to 201506017636, add shotcrete detail and notesDetails
revision to 201506017636, add shotcrete detail and notes | |
| Sep 15, 2017 | Completed final sign-off Nov 2019 | 3330 16th St | soft story retrofit per sfebc chapter 4d, using 2016 cebc appendix a4Details
soft story retrofit per sfebc chapter 4d, using 2016 cebc appendix a4 | $20,000 | |
| Sep 15, 2017 | Completed final sign-off Nov 2022 | 1253 16th Av | Francisco Zarceno | soft story retrofit using cebc a4Details
soft story retrofit using cebc a4 | $65,000 |
| Sep 15, 2017 | Completed final sign-off Mar 2020 | 342 08th Av | J. Ho Construction Inc | soft story retrofit using cebc a4Details
soft story retrofit using cebc a4 | $65,000 |
| Sep 12, 2017 | Completed final sign-off Jul 2019 | 307 Guerrero St | S F Bay Construction Inc | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $40,000 |
| Sep 12, 2017 | Completed final sign-off Dec 2018 | 3650 Judah St | soft story retrofit using criteria cebc 2016 appendeix a-4Details
soft story retrofit using criteria cebc 2016 appendeix a-4 | $75,000 | |
| Sep 12, 2017 | Completed final sign-off Jun 2019 | 2447 Vallejo St | Sgv Group Construction | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $45,000 |
| Sep 5, 2017 | Completed final sign-off Jan 2019 | 1310 Kearny St | Hong Lee Construction Co Inc | soft story retrofit per sfebc 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc 4d: 2016 cebc appendix a-4 | $40,000 |
| Sep 5, 2017 | Completed final sign-off May 2020 | 37 Lyon St | Cedar House Construction/Brian White, Gorman Construction | soft story retrofit per sfebc 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc 4d: 2016 cebc appendix a-4 | $50,000 |
| Jul 21, 2017 | Completed final sign-off Sep 2017 | 232 Parker Av | revision to app#201612296259. replace extg conc ftg at garage door and front entry stair. new sog at garage. nothing at exterior.Details
revision to app#201612296259. replace extg conc ftg at garage door and front entry stair. new sog at garage. nothing at exterior. | $1,000 | |
| Jul 21, 2017 | Completed final sign-off Sep 2017 | 3662 16th St | Bailey General Contracting Co Inc | to comply with nov 201408721 - front stair landing repair in kindDetails
to comply with nov 201408721 - front stair landing repair in kind | $20,000 |
| Jun 16, 2017 | Expired or cancelled expired Apr 2024 | 650 Diamond St | Success Construction ***See Notes***, Bay Build Design Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $75,000 |
| May 30, 2017 | Completed final sign-off Jun 2017 | 312 Montcalm St | Ken O'sullivan Construction And Renovati | partial foundation replacement.Details
partial foundation replacement. | $4,000 |
| May 8, 2017 | Never finaled issued Sep 2017, no final | 465 Grant Av | Huey Const Mngmt Co Inc - Dba M H Const. | repair existing fire exit stair where steel members have corroded. reinforce connection between existing concrete parapet and 3' extension at top of parapet wallDetails
repair existing fire exit stair where steel members have corroded. reinforce connection between existing concrete parapet and 3' extension at top of parapet wall | $25,000 |
| Mar 17, 2017 | Expired or cancelled expired Jul 2023 | 17 Chattanooga St | S L M Development Inc. | add unit per ordinance no# 162-16 in place of (e) storage & garage area @ street level in an (e) 3 units residential structure. (e) units above to remain unchanged. new units will have 2 bedrooms, 2 baths & 1 kitchen.Details
add unit per ordinance no# 162-16 in place of (e) storage & garage area @ street level in an (e) 3 units residential structure. (e) units above to remain unchanged. new units will have 2 bedrooms, 2 baths & 1 kitchen. | $45,000 |
| Mar 16, 2017 | Completed final sign-off Aug 2017 | 351 30th St | Bailey General Contracting Co Inc | exterior stair & landing repair. repair in kind per planDetails
exterior stair & landing repair. repair in kind per plan | $30,000 |
| Jan 31, 2017 | Expired or cancelled cancelled Apr 2017 | 17 Chattanooga St | Otto Miller Development Inc | voluntary partial foundation replacement, partial central support upgrade, remove & replace (e) 1/f to eliminate (e) car parking, replace with 1 class-1 bicycle parking space, garage door to be fixed.Details
voluntary partial foundation replacement, partial central support upgrade, remove & replace (e) 1/f to eliminate (e) car parking, replace with 1 class-1 bicycle parking space, garage door to be fixed. | $20,000 |
| Dec 29, 2016 | Completed final sign-off Sep 2017 | 232 Parker Av | infill lightwell, infill ground <12' under (e) rear addition. new master bedroom & bathroom @ ground floorDetails
infill lightwell, infill ground <12' under (e) rear addition. new master bedroom & bathroom @ ground floor | $50,000 | |
| Dec 15, 2016 | Completed final sign-off Sep 2017 | 232 Parker Av | Aero Construction Inc | partial foundation replacement (south) prop lineDetails
partial foundation replacement (south) prop line | $18,000 |
| Nov 1, 2016 | Completed final sign-off Aug 2018 | 445 Webster St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. n/a ordinance #155-13Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. n/a ordinance #155-13 | $110,000 | |
| Aug 29, 2016 | Completed final sign-off Feb 2018 | 144 Parnassus Av | soft story retrofit in compliance with sfbc ch34b using criteria 5 iebc a4Details
soft story retrofit in compliance with sfbc ch34b using criteria 5 iebc a4 | $75,000 | |
| Aug 9, 2016 | Completed final sign-off Nov 2018 | 84 Harriet St | soft story retrofit per sfbc ch 34b, adu added under pa 201601086638; 2012 iebc appendix a-4; maher n/aDetails
soft story retrofit per sfbc ch 34b, adu added under pa 201601086638; 2012 iebc appendix a-4; maher n/a | $30,000 | |
| Nov 13, 2015 | Completed final sign-off Dec 2016 | 195 Collingwood St | Edgewood Builders Inc | soft story mandatory seismic retrofit on ground floor per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story mandatory seismic retrofit on ground floor per sfbc chapter 34b, 2012 iebc appendix a-4 | $85,000 |
| Oct 27, 2015 | Completed final sign-off Sep 2016 | 609 Castro St | S And L Tec Construction Co Inc | comply w/ physical inspection report cc-7469, legalize (e) rear deck & stair. legalize (e) back door @ lower level, build (n)) 1-hr wall @ 2nd level deck adj to p.l.Details
comply w/ physical inspection report cc-7469, legalize (e) rear deck & stair. legalize (e) back door @ lower level, build (n)) 1-hr wall @ 2nd level deck adj to p.l. | $6,000 |
| Mar 20, 2015 | Completed final sign-off Oct 2017 | 1945 Eddy St | Fay Construction & Restoration Inc | to comply with physical inspection report #cc-7309. legalize rear deck and stairs.Details
to comply with physical inspection report #cc-7309. legalize rear deck and stairs. | $8,500 |
| Dec 30, 2014 | Completed final sign-off Jun 2016 | 1723 Noe St | comply with physical inspection report# cc-7454. legalize (e) side decks built without permit record @ 1st & 2nd floor.Details
comply with physical inspection report# cc-7454. legalize (e) side decks built without permit record @ 1st & 2nd floor. | $15,000 | |
| Dec 17, 2014 | Completed final sign-off Jun 2016 | 349 Church St | comply with physical inspection report# cc-7248. legalize (e) rear deck & stairs. pull (e) upper deck back to 5' from p.l. build new 1 hour wall @ n. p.l. of lower deck. legalize (e) skylights. restore (e) attic to non-habitable storage space.Details
comply with physical inspection report# cc-7248. legalize (e) rear deck & stairs. pull (e) upper deck back to 5' from p.l. build new 1 hour wall @ n. p.l. of lower deck. legalize (e) skylights. restore (e) attic to non-habitable storage space. | $15,000 | |
| May 19, 2014 | Completed final sign-off Nov 2014 | 22 Rudden Av | Streiffer Burnham Const., Inc. | structural revision to pa #2014.0407.2605 - partial foundaiton replacement, modification to sistered level detail.Details
structural revision to pa #2014.0407.2605 - partial foundaiton replacement, modification to sistered level detail. | $14,000 |
| May 13, 2014 | Expired or cancelled cancelled Dec 2014 | 3839 Mission St | revision to appl #2014.0310.0317 - remodle (e) residential unit over ground floor commercial, no work @ commercial unit. no envelope changes. remodel bathroom & kitchen in kind.Details
revision to appl #2014.0310.0317 - remodle (e) residential unit over ground floor commercial, no work @ commercial unit. no envelope changes. remodel bathroom & kitchen in kind. | $20,000 | |
| Apr 15, 2014 | Completed final sign-off Jun 2014 | 155 29th St | Barrera & Associates Construction Inc | replace (e) brick foundation and install new gyp board with exterior plywood to replace (e) siding @ left side wall (3) stories.Details
replace (e) brick foundation and install new gyp board with exterior plywood to replace (e) siding @ left side wall (3) stories. | $20,000 |
| Nov 19, 2013 | Completed final sign-off Jul 2014 | 260 Rose St | replace existing property line fence bordering page & laguna mini park, replace existing iron security gate to breezeway at front facade. front gate will be no higher than 6 feet.Details
replace existing property line fence bordering page & laguna mini park, replace existing iron security gate to breezeway at front facade. front gate will be no higher than 6 feet. | $20,000 | |
| Nov 19, 2013 | Completed final sign-off Jul 2014 | 287 Page St | Rivera Construction | replace existing property line fence bordering page & laguna mini park, replace existing concrete site retaining wall at front property line and cap with decorative iron fencing.Details
replace existing property line fence bordering page & laguna mini park, replace existing concrete site retaining wall at front property line and cap with decorative iron fencing. | $30,000 |
| Nov 7, 2013 | Completed final sign-off Mar 2015 | 1583 Treat Av | Chenney Construction | addition to remodel of (e) kitchenDetails
addition to remodel of (e) kitchen | $60,000 |
| Jan 2, 2013 | Expired or cancelled withdrawn Sep 2015 | 450 Noe St | unit merger. existing 2 units building convert to single family dwelling.Details
unit merger. existing 2 units building convert to single family dwelling. | $1,000 | |
| Sep 28, 2011 | Completed final sign-off Jun 2012 | 375 Munich St | comply with nov 201150891: new rear stair rebuild with enclosure and lightwell infillDetails
comply with nov 201150891: new rear stair rebuild with enclosure and lightwell infill | $8,000 | |
| Nov 23, 2009 | Never finaled issued Jun 2010, no final | 2807 Bryant St | partial foundation replacement & framing repair replacement/repair of (e) internal stairs.Details
partial foundation replacement & framing repair replacement/repair of (e) internal stairs. | $4,000 |