Corona Remodeling Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2017 to Sep 2026
- Last 24 months
- 13 permits filed
26 permits since 2000: 22 completed, 2 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2026 | In progress issued Sep 2026 | 55 22nd Av | remove wood wall panling and install gypsum board in two bedrooms. each bedroom approx. 13' x 15'. all drywall shall be 5/8" type x.Details
remove wood wall panling and install gypsum board in two bedrooms. each bedroom approx. 13' x 15'. all drywall shall be 5/8" type x. | $8,000 |
| Sep 25, 2026 | Completed final sign-off Oct 2026 | 55 Sanchez St | to comply with nov 202662557: remove existing unpermitted door, door frame, and associated hardware installed within existing 1-hour rated wall between dwelling unit and laundry room. in fill existing door opening and restore wall to a continuous 1-hour fire-resistance-rated wall assembly. patch andDetails
to comply with nov 202662557: remove existing unpermitted door, door frame, and associated hardware installed within existing 1-hour rated wall between dwelling unit and laundry room. in fill existing door opening and restore wall to a continuous 1-hour fire-resistance-rated wall assembly. patch and | $10,000 |
| Aug 12, 2026 | In progress filed Aug 2026, not yet issued | 3730 Clay St | property front retaining wall repair.Details
property front retaining wall repair. | $25,000 |
| Feb 26, 2026 | Completed final sign-off Apr 2026 | 170 Pacific Av | replace kitchen facuet & countertops. install new 1/4" copper water line for refrigerator ice maker. no cabinet replacement, no layout changes - bathrooms (2) replace bathtub in-kind in (e) alcove. replace (1) prefabricated shower pan in-kind. install 2 toilets, replace 2 shower pressure controlDetails
replace kitchen facuet & countertops. install new 1/4" copper water line for refrigerator ice maker. no cabinet replacement, no layout changes - bathrooms (2) replace bathtub in-kind in (e) alcove. replace (1) prefabricated shower pan in-kind. install 2 toilets, replace 2 shower pressure control | $90,000 |
| Nov 7, 2025 | Completed final sign-off Dec 2025 | 194 Onondaga Av | bathroom remodel in kind. (no plan). install new exhaust fan, install new tile floor, tile wainscot & tub surround walls. install new pressure. balanced mixing valve for tub / shower. upgrade electrical outlets & light switches.Details
bathroom remodel in kind. (no plan). install new exhaust fan, install new tile floor, tile wainscot & tub surround walls. install new pressure. balanced mixing valve for tub / shower. upgrade electrical outlets & light switches. | $10,000 |
| Sep 8, 2025 | Completed final sign-off Oct 2025 | 50 Montclair Tr | replacement of 2 garage doors in kind, front of property, street facing.Details
replacement of 2 garage doors in kind, front of property, street facing. | $19,000 |
| Sep 5, 2025 | Completed final sign-off Oct 2025 | 50 Montclair Tr | kitchen counter tops replacement, upgrade kitchen electrical, panel, install new angle stops, faucet, sink and garbage disposal. replace demo'd sheet rock with 5/8" type x. not a full kitchen remodel.Details
kitchen counter tops replacement, upgrade kitchen electrical, panel, install new angle stops, faucet, sink and garbage disposal. replace demo'd sheet rock with 5/8" type x. not a full kitchen remodel. | $20,000 |
| Aug 26, 2025 | Completed final sign-off Oct 2025 | 1616 08th Av | bath remodel in kind. replace vanity, toilet, tile, bathroom exhaust fan,4 recessed lights upgrade elec wiring,replace 2 windows in kind,not visible from street. update electrical sep permit. remove all knobs and tubes, install circuits and upgrade panel.Details
bath remodel in kind. replace vanity, toilet, tile, bathroom exhaust fan,4 recessed lights upgrade elec wiring,replace 2 windows in kind,not visible from street. update electrical sep permit. remove all knobs and tubes, install circuits and upgrade panel. | $50,000 |
| Jun 12, 2025 | Completed final sign-off Jun 2025 | 831 45th Av | to comply with nov 2025536715. removal of rear stairs and removal of corrugated roof on lightwell. build railing.Details
to comply with nov 2025536715. removal of rear stairs and removal of corrugated roof on lightwell. build railing. | $3,000 |
| Apr 30, 2025 | Completed final sign-off Jun 2025 | 831 45th Av | replace front facade windows in kind. kitchen remodel in kind. new cabinets and new counterrops. bathroom remodel in kind. new tiles, new vanity and new faucets. upgarde electrical system + new panel.Details
replace front facade windows in kind. kitchen remodel in kind. new cabinets and new counterrops. bathroom remodel in kind. new tiles, new vanity and new faucets. upgarde electrical system + new panel. | $60,000 |
| Apr 22, 2025 | Completed final sign-off Jun 2025 | 184 Onondaga Av | kitchen remodel in kind. install new countertops, upgrade electrical, new electrical panel, install new recessed lighting, upgrade gas line for new stove, install new hardwood flooring, install water line for refrigerator ice-maker, new exhaust vent hood.Details
kitchen remodel in kind. install new countertops, upgrade electrical, new electrical panel, install new recessed lighting, upgrade gas line for new stove, install new hardwood flooring, install water line for refrigerator ice-maker, new exhaust vent hood. | $60,000 |
| Apr 9, 2025 | Completed final sign-off Apr 2025 | 349 Marina Bl | replace (1) support post in kind and (1) support beam under deck structrue in kind. repair of deck less than 50%Details
replace (1) support post in kind and (1) support beam under deck structrue in kind. repair of deck less than 50% | $1,000 |
| Feb 28, 2025 | Completed final sign-off May 2025 | 2127 Broadway | bathroom remodel in kind. replace bathtub, vanity and toilet same location. relocate (03) gfci outlets/(02) wall sconcesDetails
bathroom remodel in kind. replace bathtub, vanity and toilet same location. relocate (03) gfci outlets/(02) wall sconces | $30,000 |
| Sep 18, 2024 | Completed final sign-off Sep 2024 | 2025 Lyon St | repair stairs and railings on exterior back stairs, less than 50%. in kind. (2 stories)Details
repair stairs and railings on exterior back stairs, less than 50%. in kind. (2 stories) | $8,000 |
| Apr 17, 2024 | Completed final sign-off Sep 2024 | 2855 Jackson St | remodel kitchen (in kind) replace countertops, install recessed lighting, new cooktop/ hood. remodel primary bathroom in kind replace vanity tile, electrical upgrade replace breaker box panel- remodel guest bathroom in kind. replace tile vanity install fanDetails
remodel kitchen (in kind) replace countertops, install recessed lighting, new cooktop/ hood. remodel primary bathroom in kind replace vanity tile, electrical upgrade replace breaker box panel- remodel guest bathroom in kind. replace tile vanity install fan | $70,000 |
| Apr 17, 2024 | Completed final sign-off Jul 2024 | 883 Sanchez St | revision to permit #202402266584: add dry rot repair - approx 72 sq ftDetails
revision to permit #202402266584: add dry rot repair - approx 72 sq ft | $25,000 |
| Feb 26, 2024 | Completed final sign-off Jul 2024 | 883 Sanchez St | remodel kitchen in kind: to replacefuacet/sink/coutertops/cabinets/appliances. to add recessed lights-upgrade electrical panel. add new dedicated circuits for kitchen.Details
remodel kitchen in kind: to replacefuacet/sink/coutertops/cabinets/appliances. to add recessed lights-upgrade electrical panel. add new dedicated circuits for kitchen. | $40,000 |
| Feb 26, 2024 | Completed final sign-off Jul 2024 | 883 Sanchez St | to replace 6 windows and 2 sliding door in kind. 6 windows (visible) alum-cladDetails
to replace 6 windows and 2 sliding door in kind. 6 windows (visible) alum-clad | $25,000 |
| Mar 16, 2023 | Completed final sign-off Sep 2023 | 12 Carnelian Wy | rev to pa# 2023-0125-0749; correct story count. re-align closet wall in master bedroom, demo two non-structural walls on kitchen area, relocate electrical panel, upgrade lighting demo partial wall in master bathroom non-structural upgrade kitchen and bathrooms faucets,Details
rev to pa# 2023-0125-0749; correct story count. re-align closet wall in master bedroom, demo two non-structural walls on kitchen area, relocate electrical panel, upgrade lighting demo partial wall in master bathroom non-structural upgrade kitchen and bathrooms faucets, | $25,000 |
| Jan 25, 2023 | Never finaled issued Jan 2023, no final | 12 Carnelian Wy | remodel 3 bathrooms and remodel 1 kitchenDetails
remodel 3 bathrooms and remodel 1 kitchen | $60,000 |
| Dec 5, 2022 | Completed final sign-off Feb 2023 | 500 Fell St | voluntary barrier removal scope with accessibility improvements at existing ground floor commercial business tenant. no structural, no mep, no sidewalk work.Details
voluntary barrier removal scope with accessibility improvements at existing ground floor commercial business tenant. no structural, no mep, no sidewalk work. | |
| May 6, 2021 | Never finaled issued Nov 2021, no final | 1252 Valencia St | reconfiguration hallway to storage and bathroom. expand prep area. add gfci power outlet. plumbing scope: relocate 1 hand wash sink.Details
reconfiguration hallway to storage and bathroom. expand prep area. add gfci power outlet. plumbing scope: relocate 1 hand wash sink. | $3,000 |
| Jul 2, 2019 | Completed final sign-off Aug 2019 | 110 Alpine Tr | replace cabinets and counter tops in kitchen. relocate existing outlets per code. 12x20Details
replace cabinets and counter tops in kitchen. relocate existing outlets per code. 12x20 | $20,000 |
| Apr 19, 2019 | Completed final sign-off Nov 2019 | 430 26th Av | removed 2 wall between dining and living rooms. relocate oultes and switchesDetails
removed 2 wall between dining and living rooms. relocate oultes and switches | $10,000 |
| Apr 8, 2019 | Completed final sign-off Mar 2020 | 260 Rose St | legalize unpermitted foundation upgradesDetails
legalize unpermitted foundation upgrades | $15,000 |
| Jun 28, 2017 | Completed final sign-off Jan 2018 | 2027 Hayes St | install half restroom on 1st floor.Details
install half restroom on 1st floor. | $13,000 |