Back to kitchen remodel contractors
Corona Remodeling Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2017 to Sep 2026
- Last 24 months
- 13 permits filed
26 permits since 2000: 22 completed, 2 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 8 completed, 1 never finaled. Typically 0 days from filing to permit and 60 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2026 | Completed final sign-off Apr 2026 | 170 Pacific Av | replace kitchen facuet & countertops. install new 1/4" copper water line for refrigerator ice maker. no cabinet replacement, no layout changes - bathrooms (2) replace bathtub in-kind in (e) alcove. replace (1) prefabricated shower pan in-kind. install 2 toilets, replace 2 shower pressure controlDetails
replace kitchen facuet & countertops. install new 1/4" copper water line for refrigerator ice maker. no cabinet replacement, no layout changes - bathrooms (2) replace bathtub in-kind in (e) alcove. replace (1) prefabricated shower pan in-kind. install 2 toilets, replace 2 shower pressure control | $90,000 |
| Sep 5, 2025 | Completed final sign-off Oct 2025 | 50 Montclair Tr | kitchen counter tops replacement, upgrade kitchen electrical, panel, install new angle stops, faucet, sink and garbage disposal. replace demo'd sheet rock with 5/8" type x. not a full kitchen remodel.Details
kitchen counter tops replacement, upgrade kitchen electrical, panel, install new angle stops, faucet, sink and garbage disposal. replace demo'd sheet rock with 5/8" type x. not a full kitchen remodel. | $20,000 |
| Apr 30, 2025 | Completed final sign-off Jun 2025 | 831 45th Av | replace front facade windows in kind. kitchen remodel in kind. new cabinets and new counterrops. bathroom remodel in kind. new tiles, new vanity and new faucets. upgarde electrical system + new panel.Details
replace front facade windows in kind. kitchen remodel in kind. new cabinets and new counterrops. bathroom remodel in kind. new tiles, new vanity and new faucets. upgarde electrical system + new panel. | $60,000 |
| Apr 22, 2025 | Completed final sign-off Jun 2025 | 184 Onondaga Av | kitchen remodel in kind. install new countertops, upgrade electrical, new electrical panel, install new recessed lighting, upgrade gas line for new stove, install new hardwood flooring, install water line for refrigerator ice-maker, new exhaust vent hood.Details
kitchen remodel in kind. install new countertops, upgrade electrical, new electrical panel, install new recessed lighting, upgrade gas line for new stove, install new hardwood flooring, install water line for refrigerator ice-maker, new exhaust vent hood. | $60,000 |
| Apr 17, 2024 | Completed final sign-off Sep 2024 | 2855 Jackson St | remodel kitchen (in kind) replace countertops, install recessed lighting, new cooktop/ hood. remodel primary bathroom in kind replace vanity tile, electrical upgrade replace breaker box panel- remodel guest bathroom in kind. replace tile vanity install fanDetails
remodel kitchen (in kind) replace countertops, install recessed lighting, new cooktop/ hood. remodel primary bathroom in kind replace vanity tile, electrical upgrade replace breaker box panel- remodel guest bathroom in kind. replace tile vanity install fan | $70,000 |
| Feb 26, 2024 | Completed final sign-off Jul 2024 | 883 Sanchez St | remodel kitchen in kind: to replacefuacet/sink/coutertops/cabinets/appliances. to add recessed lights-upgrade electrical panel. add new dedicated circuits for kitchen.Details
remodel kitchen in kind: to replacefuacet/sink/coutertops/cabinets/appliances. to add recessed lights-upgrade electrical panel. add new dedicated circuits for kitchen. | $40,000 |
| Mar 16, 2023 | Completed final sign-off Sep 2023 | 12 Carnelian Wy | rev to pa# 2023-0125-0749; correct story count. re-align closet wall in master bedroom, demo two non-structural walls on kitchen area, relocate electrical panel, upgrade lighting demo partial wall in master bathroom non-structural upgrade kitchen and bathrooms faucets,Details
rev to pa# 2023-0125-0749; correct story count. re-align closet wall in master bedroom, demo two non-structural walls on kitchen area, relocate electrical panel, upgrade lighting demo partial wall in master bathroom non-structural upgrade kitchen and bathrooms faucets, | $25,000 |
| Jan 25, 2023 | Never finaled issued Jan 2023, no final | 12 Carnelian Wy | remodel 3 bathrooms and remodel 1 kitchenDetails
remodel 3 bathrooms and remodel 1 kitchen | $60,000 |
| Jul 2, 2019 | Completed final sign-off Aug 2019 | 110 Alpine Tr | replace cabinets and counter tops in kitchen. relocate existing outlets per code. 12x20Details
replace cabinets and counter tops in kitchen. relocate existing outlets per code. 12x20 | $20,000 |