James Ferguson
- Listed as
- authorized agent-others, contractor
- Firm
- Counterforce Inc.
- Based in
- Oakland
- On San Francisco permits
- Apr 2000 to Mar 2025
71 permits since 2000 (contractor on 71 permits, authorized agent-others on 1 permit): 55 completed, 6 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 13, 2025 | Completed final sign-off Jan 2026 | 1835 Leavenworth St | Counterforce Inc. | (common areas only) replace one dry rotted deck beam. replace a portion of another dry rotted deck beam. less than 50%Details
(common areas only) replace one dry rotted deck beam. replace a portion of another dry rotted deck beam. less than 50% | $28,000 |
| Feb 19, 2025 | Completed final sign-off Mar 2025 | 219 18th Av | Counterforce Inc. | 2nd/fl: remove two dry rotted posts supporting the rear on the 2nd floor "pop out" and install a new perimeter footing and wood framed shear walls below the "pop out" install masonite shingles at new and paint to match existing. area to remain unconditioned storageDetails
2nd/fl: remove two dry rotted posts supporting the rear on the 2nd floor "pop out" and install a new perimeter footing and wood framed shear walls below the "pop out" install masonite shingles at new and paint to match existing. area to remain unconditioned storage | $16,000 |
| Jun 13, 2024 | Completed final sign-off Sep 2024 | 3490 18th St | Counterforce Inc. | to comply with nov: 202421803. repair built up wood framed colum damaged by car impact in-kind. no change to exterior is proposed.Details
to comply with nov: 202421803. repair built up wood framed colum damaged by car impact in-kind. no change to exterior is proposed. | $22,000 |
| Jan 8, 2024 | Completed final sign-off Jul 2024 | 2255 35th Av | Counterforce Inc. | the replacement of 17 lineal feet of the rear foundation.Details
the replacement of 17 lineal feet of the rear foundation. | $16,000 |
| Jul 21, 2023 | Completed final sign-off Feb 2024 | 50 San Pablo Av | Counterforce Inc. | structural: install 6lf of sister foundation. install 35lf of french drain.Details
structural: install 6lf of sister foundation. install 35lf of french drain. | $28,500 |
| Jan 10, 2023 | Never finaled filed Jan 2023, never issued | 2691 18th Av | Counterforce Inc. | retaining wall replacement: a new retaining wall made of concrete 10" thick and 10'0" tall will replace the rear (e) timber-wooden wall which is deteriorating.Details
retaining wall replacement: a new retaining wall made of concrete 10" thick and 10'0" tall will replace the rear (e) timber-wooden wall which is deteriorating. | $69,000 |
| Jan 6, 2023 | Completed final sign-off Mar 2023 | 2255 Lake St | Counterforce Inc. | revision to 201707202413 and 202203210442 to address existing field conditionsDetails
revision to 201707202413 and 202203210442 to address existing field conditions | |
| Oct 25, 2021 | Completed final sign-off Dec 2021 | 1601 Hyde St | Counterforce Inc. | revision to pa# 202001212415 to increase cost of job & add 2" safety strip & automatic opener in compliance with ada per inspector. ** maher: n/a **Details
revision to pa# 202001212415 to increase cost of job & add 2" safety strip & automatic opener in compliance with ada per inspector. ** maher: n/a ** | $10,000 |
| Aug 9, 2021 | Completed final sign-off Jan 2022 | 4162 17th St | Counterforce Inc. | in kind repair of front entry stairs not to exceed 50% . replace (e) pad footings @ bay.Details
in kind repair of front entry stairs not to exceed 50% . replace (e) pad footings @ bay. | $6,500 |
| Apr 7, 2021 | Completed final sign-off Jul 2021 | 1127 Russia Av | Counterforce Inc. | voluntary strengthening of walls at the garage level. addition of plywood sheathing, anchor bolts, holdowns, shear clips.Details
voluntary strengthening of walls at the garage level. addition of plywood sheathing, anchor bolts, holdowns, shear clips. | $12,400 |
| Mar 10, 2021 | Completed final sign-off Mar 2022 | 3300 Clay St | Counterforce Inc. | revision to app#201709137894 for soft story upgrade per cbc 2019, appendix chapter a4Details
revision to app#201709137894 for soft story upgrade per cbc 2019, appendix chapter a4 | |
| Feb 4, 2021 | Completed final sign-off Oct 2021 | 1952 Irving St | Counterforce Inc. | repair existing corner column damaged by car collision. replace existing concrete pilaster with new pad footing.Details
repair existing corner column damaged by car collision. replace existing concrete pilaster with new pad footing. | $2,000 |
| Nov 3, 2020 | Completed final sign-off Nov 2022 | 2733 Mission St | Counterforce Inc. | soft-story retrofit using criteria 5 of iebc a-4. residential spaceDetails
soft-story retrofit using criteria 5 of iebc a-4. residential space | $30,842 |
| Nov 3, 2020 | Completed final sign-off Nov 2022 | 2733 Mission St | Counterforce Inc. | soft-story retrofit using criteria 5 of iebc a-4. commercial space.Details
soft-story retrofit using criteria 5 of iebc a-4. commercial space. | $115,053 |
| Sep 20, 2020 | Never finaled issued Oct 2020, no final | 2255 North Point St | Counterforce Inc. | rev to pa201806152081: wall strengthening in garage.Details
rev to pa201806152081: wall strengthening in garage. | |
| Aug 4, 2020 | Completed final sign-off Apr 2021 | 1400 Greenwich St | Counterforce Inc. | mandatory soft story retrofit of soft story mandate using cebc chapter a-4Details
mandatory soft story retrofit of soft story mandate using cebc chapter a-4 | $50,000 |
| Mar 3, 2020 | Completed final sign-off Jun 2020 | 2550 Fulton St | Counterforce Inc. | soft story retrofit to comply w sfebc ch 4d. based on cebc appendix a4 caluculations. revised sheets to 202001303194.Details
soft story retrofit to comply w sfebc ch 4d. based on cebc appendix a4 caluculations. revised sheets to 202001303194. | $10,000 |
| Feb 13, 2020 | Completed final sign-off Jul 2021 | 3352 18th St | Counterforce Inc. | mandatory soft story retrofit program with sfebc ch.4d using criteria 5 of cebc appendeix a4. to comply with nov201813131. residential.Details
mandatory soft story retrofit program with sfebc ch.4d using criteria 5 of cebc appendeix a4. to comply with nov201813131. residential. | $45,000 |
| Feb 13, 2020 | Never finaled issued Dec 2020, no final | 3350 18th St | Counterforce Inc. | mandatory soft story retrofit program with sfebc ch.4d using criteria 5 of cebc appendeix a4. to comply with nov201813131. commericialDetails
mandatory soft story retrofit program with sfebc ch.4d using criteria 5 of cebc appendeix a4. to comply with nov201813131. commericial | |
| Jan 30, 2020 | Expired or cancelled expired Apr 2026 | 2550 Fulton St | Counterforce Inc. | soft story retorfit per sfebc chapter 4d engineering criteria. 2019 cebc appendix a-4Details
soft story retorfit per sfebc chapter 4d engineering criteria. 2019 cebc appendix a-4 | $10,000 |
| Jan 21, 2020 | Completed final sign-off Oct 2021 | 1601 Hyde St | Counterforce Inc. | residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #202001212415. to comply with nov #201803422.Details
residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #202001212415. to comply with nov #201803422. | $45,000 |
| Jan 21, 2020 | Completed final sign-off Oct 2021 | 1601 Hyde St | Counterforce Inc. | commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #202001212414. to comply with nov #201803422.Details
commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #202001212414. to comply with nov #201803422. | |
| Nov 8, 2019 | Completed final sign-off Nov 2019 | 3590 Washington St | Counterforce Inc. | administrative permit to document compliance with mandatory soft story retrofit for sfebc chapter 4d utilizing 2016 cfbc appendix a-4. all work completed and final under pa2017-05-23-7388. to with nov 201990331Details
administrative permit to document compliance with mandatory soft story retrofit for sfebc chapter 4d utilizing 2016 cfbc appendix a-4. all work completed and final under pa2017-05-23-7388. to with nov 201990331 | |
| Apr 15, 2019 | Completed final sign-off Sep 2019 | 43 Jasper Pl | Counterforce Inc. | voluntary strengthening of the lowest level, incl the replacement of approx 54' of foundation, 800 sqft of concrete slab, 81' of (n) ply shear wall, 15' of (n) grade beam, and various shear clips,anchor bolts & holdownsDetails
voluntary strengthening of the lowest level, incl the replacement of approx 54' of foundation, 800 sqft of concrete slab, 81' of (n) ply shear wall, 15' of (n) grade beam, and various shear clips,anchor bolts & holdowns | $48,000 |
| Feb 22, 2019 | Completed final sign-off Aug 2019 | 910 Steiner St | Counterforce Inc. | voluntary strenghening of the lowest level including plywood sheating, anchor bolts, shear clips and (2) grade beamsDetails
voluntary strenghening of the lowest level including plywood sheating, anchor bolts, shear clips and (2) grade beams | $68,000 |
| Dec 10, 2018 | Never finaled issued Dec 2018, no final | 878 Dolores St | Counterforce Inc. | street spaceDetails
street space | |
| Jul 12, 2018 | Completed final sign-off Mar 2019 | 878 Dolores St | Counterforce Inc. | revision to pa 2017-0817-5145 seismic retrofitDetails
revision to pa 2017-0817-5145 seismic retrofit | $8,000 |
| Jun 15, 2018 | Completed final sign-off Oct 2020 | 2255 North Point St | Counterforce Inc. | soft story mitigation per 2016 cebc appendix ch a4 including strengthening walls at garage/storage lvel. addition f plywood sheathing, anchor bolts, holdowns, shear clipsDetails
soft story mitigation per 2016 cebc appendix ch a4 including strengthening walls at garage/storage lvel. addition f plywood sheathing, anchor bolts, holdowns, shear clips | $40,000 |
| Apr 19, 2018 | Completed final sign-off May 2019 | 1275 Clay St | Counterforce Inc. | compliance w mandatory soft story retrofit program, chapter 4d engineering crigeria cebc 2016 app a4.Details
compliance w mandatory soft story retrofit program, chapter 4d engineering crigeria cebc 2016 app a4. | $20,000 |
| Sep 12, 2017 | Completed final sign-off Jul 2019 | 372 West Portal Av | Counterforce Inc. | compliance with mandatory soft sotry retrofit program, 2016 cebc appendix a-4 **maher n/a**Details
compliance with mandatory soft sotry retrofit program, 2016 cebc appendix a-4 **maher n/a** | $60,000 |
| Jun 21, 2017 | Completed final sign-off Oct 2018 | 1028 Guerrero St | Counterforce Inc. | compliance with mandatory soft story retrofit program, cebc 2016 app a-4, sfbc 2016 chp. 34b.Details
compliance with mandatory soft story retrofit program, cebc 2016 app a-4, sfbc 2016 chp. 34b. | $70,000 |
| May 23, 2017 | Completed final sign-off Sep 2017 | 655 Mississippi St | Counterforce Inc. | voluntary strengthening, partial foundation replacement (74 lineal ft) & the addition of cripple wall plywood shear walls, bolts & clips. n/a maher ordinanceDetails
voluntary strengthening, partial foundation replacement (74 lineal ft) & the addition of cripple wall plywood shear walls, bolts & clips. n/a maher ordinance | $44,000 |
| May 23, 2017 | Completed final sign-off Mar 2019 | 3590 Washington St | Counterforce Inc. | strenghthening of walls at garage/storage level of existing building. specific strengthening includes plywood sheating, anchor bolts, holdows, shear clipsDetails
strenghthening of walls at garage/storage level of existing building. specific strengthening includes plywood sheating, anchor bolts, holdows, shear clips | $84,000 |
| Feb 21, 2017 | Completed final sign-off May 2017 | 3329 22nd St | Counterforce Inc. | replace 5' length of retaining wall, install sister foundation inboard of e brick foundation. install misc shear clipsDetails
replace 5' length of retaining wall, install sister foundation inboard of e brick foundation. install misc shear clips | $38,000 |
| Feb 17, 2017 | Expired or cancelled cancelled Jan 2026 | 2338 Fulton St | Counterforce Inc. | revision to pa #201609238706 - omit shearwall @ garbage breezeway, add shearwalls @ transverse walls @ storage lightwell, add (n) shearwall @ crawlspace lightwell.Details
revision to pa #201609238706 - omit shearwall @ garbage breezeway, add shearwalls @ transverse walls @ storage lightwell, add (n) shearwall @ crawlspace lightwell. | |
| Nov 8, 2016 | Expired or cancelled cancelled Jan 2026 | 130 Irving St | Counterforce Inc. | common area- revision to pa#201609127426, install 13'7" foundation cap, install 8'8" of new foundation, new 18" square foundation pad.Details
common area- revision to pa#201609127426, install 13'7" foundation cap, install 8'8" of new foundation, new 18" square foundation pad. | $4,000 |
| Oct 21, 2016 | Completed final sign-off Dec 2018 | 3316 Laguna St | Counterforce Inc. | soft story mitigationm iebc appx chap 4Details
soft story mitigationm iebc appx chap 4 | $15,000 |
| Oct 20, 2016 | Completed final sign-off Jan 2018 | 1740 Pacific Av | Counterforce Inc. | compliance w/mandatory seismic retrofit program 2012 international (e) building code appx a-4. (2012 iebc appendix a-4.)Details
compliance w/mandatory seismic retrofit program 2012 international (e) building code appx a-4. (2012 iebc appendix a-4.) | $80,000 |
| Sep 23, 2016 | Completed final sign-off May 2017 | 2338 Fulton St | Counterforce Inc. | soft story retrofit per sfbc chapter 34b, engineering criteria, 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b, engineering criteria, 2012 iebc appendix a-4. | $40,000 |
| Sep 12, 2016 | Completed final sign-off Jan 2017 | 130 Irving St | Counterforce Inc. | voluntary strenthening of lowest level: including the addition of plywood shear walls anchor bolts, hold downs, and a hardy panel with the associated grade beam.Details
voluntary strenthening of lowest level: including the addition of plywood shear walls anchor bolts, hold downs, and a hardy panel with the associated grade beam. | $18,500 |
| Aug 17, 2016 | Completed final sign-off Dec 2017 | 1555 Greenwich St | Counterforce Inc. | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $20,000 |
| Nov 19, 2015 | Completed final sign-off Feb 2016 | 1435 Bay St | Counterforce Inc. | revision to app#201411192018. change type of hardy frame panels to accomodate parking clearance extend grade beams. n/a for maher. work is in the garageDetails
revision to app#201411192018. change type of hardy frame panels to accomodate parking clearance extend grade beams. n/a for maher. work is in the garage | $5,200 |
| Jul 15, 2015 | Completed final sign-off Dec 2015 | 1580 Filbert St | Counterforce Inc. | soft story mitigation at the garage/storage level, addition of hardy frame panels, plywood sheathing, anchor bolts, hold downs, shear clips. to comply w/2012 iebc appendix a4.Details
soft story mitigation at the garage/storage level, addition of hardy frame panels, plywood sheathing, anchor bolts, hold downs, shear clips. to comply w/2012 iebc appendix a4. | $70,000 |
| Feb 5, 2015 | Completed final sign-off Aug 2015 | 190 11th Av | Counterforce Inc. | revision to 201409126157 (soft story retrofit shear walls and momement frame) move moment frame to th west and add footing for shearwallDetails
revision to 201409126157 (soft story retrofit shear walls and momement frame) move moment frame to th west and add footing for shearwall | $4,000 |
| Nov 19, 2014 | Completed final sign-off Feb 2016 | 1435 Bay St | Counterforce Inc. | soft story mitigation in accordance with iebc appendix chapter a-4; maher n/aDetails
soft story mitigation in accordance with iebc appendix chapter a-4; maher n/a | $45,000 |
| Oct 31, 2014 | Completed final sign-off Mar 2016 | 756 Arguello Bl | Counterforce Inc. | soft story retrofit per sfbc chapter 34b, fema p-807. new shearwalls.Details
soft story retrofit per sfbc chapter 34b, fema p-807. new shearwalls. | $15,000 |
| Oct 31, 2014 | Completed final sign-off Mar 2016 | 2277 Fulton St | Counterforce Inc. | soft story retrofit per sfbc chapter 34b, fema p-807. new shearwalls. ** maher: compliance with ordinance no# 155-13 not required **Details
soft story retrofit per sfbc chapter 34b, fema p-807. new shearwalls. ** maher: compliance with ordinance no# 155-13 not required ** | $15,000 |
| Oct 31, 2014 | Completed final sign-off Mar 2016 | 300 Arguello Bl | Counterforce Inc. | soft story retrofit per sfbc chapter 34b, fema p-807. new shearwalls. ** maher: compliance with ordinance no# 155-13 not required **Details
soft story retrofit per sfbc chapter 34b, fema p-807. new shearwalls. ** maher: compliance with ordinance no# 155-13 not required ** | $15,000 |
| Sep 12, 2014 | Completed final sign-off Aug 2015 | 190 11th Av | Counterforce Inc. | soft story retrofit per sfbc chapter 34b. fema p-807. soft story retrofit with new shearwalls & moment frames.Details
soft story retrofit per sfbc chapter 34b. fema p-807. soft story retrofit with new shearwalls & moment frames. | $30,000 |
| Feb 5, 2014 | Completed final sign-off May 2014 | 785 Bay St | Counterforce Inc. | soft story retrofit of existing 4 story, 6 unit apartment building including installation of 2 24" wide hardy panels in 1 garage at front wall in addition to plywood shear panels, shear clips, anchor bolts and holdowns. sfbc ch 34b. n/a for the maher ordinance #155-13Details
soft story retrofit of existing 4 story, 6 unit apartment building including installation of 2 24" wide hardy panels in 1 garage at front wall in addition to plywood shear panels, shear clips, anchor bolts and holdowns. sfbc ch 34b. n/a for the maher ordinance #155-13 | $42,000 |
| Jan 21, 2014 | Completed final sign-off Aug 2015 | 1250 Broderick St | Counterforce Inc. | to comply w/sfbc chpt 34b- soft story retrofit. compliance with maher ordinance - extended ordinance no. 155-13 not required. excavation <50 cu.yd.Details
to comply w/sfbc chpt 34b- soft story retrofit. compliance with maher ordinance - extended ordinance no. 155-13 not required. excavation <50 cu.yd. | $60,000 |
| Sep 26, 2013 | Completed final sign-off Apr 2014 | 2 Toledo Wy | Counterforce Inc. | volutary strengthening of garage level walls with plywood sheathing, holdowns, anchor bolts as well as a partial founation replacement. not adding any habitable space under this permitDetails
volutary strengthening of garage level walls with plywood sheathing, holdowns, anchor bolts as well as a partial founation replacement. not adding any habitable space under this permit | $120,000 |
| Jul 27, 2012 | Never finaled issued Oct 2012, no final | 160 Newman St | Counterforce Inc. | increase ceiling height in crawl space from 30" to 8 ft, revision to original permit #201203307215Details
increase ceiling height in crawl space from 30" to 8 ft, revision to original permit #201203307215 | $28,000 |
| Jun 17, 2010 | Completed final sign-off Jun 2010 | 39 Marietta Dr | Counterforce Inc. | revision to p.a. #201002247071: plan revise to show existing seven footings and not eight footings as shown on previous plan.Details
revision to p.a. #201002247071: plan revise to show existing seven footings and not eight footings as shown on previous plan. | |
| Jun 11, 2010 | Completed final sign-off Mar 2012 | 2113 Bush St | Counterforce Inc., D V Rasmussen & Son Inc. | (n) interior stair between 1st & 2nd fl, replace (e) kitchen. merging (e) 2 units building into single family dwelling. (n) bedroom, bathroom and office at basement level with retaining walls and stairs to rear year. horizontal extenstion of 18 feet under (e) rear deck. remodel of bed & bath @3rd flDetails
(n) interior stair between 1st & 2nd fl, replace (e) kitchen. merging (e) 2 units building into single family dwelling. (n) bedroom, bathroom and office at basement level with retaining walls and stairs to rear year. horizontal extenstion of 18 feet under (e) rear deck. remodel of bed & bath @3rd fl | $20,000 |
| May 13, 2010 | Completed final sign-off Sep 2010 | 351 30th St | Counterforce Inc. | ground floor voluntary structural partial strengthening. add plywood, shearwalls and holdowns per plan. provide (n) foundation per planDetails
ground floor voluntary structural partial strengthening. add plywood, shearwalls and holdowns per plan. provide (n) foundation per plan | $15,000 |
| Feb 24, 2010 | Completed final sign-off Jun 2010 | 39 Marietta Dr | Counterforce Inc. | replace post footing. add foundation bolts. all interior work, 8-total footings.Details
replace post footing. add foundation bolts. all interior work, 8-total footings. | $12,000 |
| Jun 18, 2009 | Never finaled issued Sep 2009, no final | 1424 Lake St | Counterforce Inc. | partial foundation replacement. voluntary strengthening of joists/foundation connection. voluntary strengthening of 1st floor (lowest level)framing.Details
partial foundation replacement. voluntary strengthening of joists/foundation connection. voluntary strengthening of 1st floor (lowest level)framing. | $12,000 |
| May 5, 2009 | Completed final sign-off Apr 2010 | 164 Boutwell St | Counterforce Inc. | remove (e) concrete footing around rear extension of building & replace with new concrete footing & piersDetails
remove (e) concrete footing around rear extension of building & replace with new concrete footing & piers | $12,000 |
| Mar 21, 2008 | Completed final sign-off Mar 2008 | 1470 Noe St | Counterforce Inc. | renew pa# 2007/03/26/7156 for final inspection only.Details
renew pa# 2007/03/26/7156 for final inspection only. | |
| Sep 19, 2007 | Completed final sign-off Oct 2007 | 875 Head St | Counterforce Inc. | renew pa# 2007/01/22/2227 for final inspection only.Details
renew pa# 2007/01/22/2227 for final inspection only. | |
| May 15, 2007 | Completed final sign-off Jan 2009 | 2125 19th St | Counterforce Inc. | add second floor, structural revisions at basement/garage. add stair, modify electrical & plumbing, refer to dcp 20051212evDetails
add second floor, structural revisions at basement/garage. add stair, modify electrical & plumbing, refer to dcp 20051212ev | $150,000 |
| Mar 28, 2007 | Completed final sign-off Jul 2007 | 45 Castenada Av | Counterforce Inc. | foundation work to shore up extg foundationDetails
foundation work to shore up extg foundation | $34,900 |
| Aug 2, 2005 | Expired or cancelled expired Nov 2007 | 2661 Broadway | Counterforce Inc., T Baker Construction Inc. | excavate garage level as shown per plans by peterson arch. and dd engineering.Details
excavate garage level as shown per plans by peterson arch. and dd engineering. | $85,000 |
| Dec 16, 2002 | Completed final sign-off Feb 2003 | 1531 Fulton St | Counterforce Inc. | renew expired app 200205317942 for remaining workDetails
renew expired app 200205317942 for remaining work | $12,000 |
| Aug 8, 2002 | Expired or cancelled expired Mar 2006 | 7 Fallon Pl | Counterforce Inc. | kitchen extension to be reinforced, foundation reinforced on existing decksDetails
kitchen extension to be reinforced, foundation reinforced on existing decks | $40,000 |
| Oct 30, 2001 | Expired or cancelled expired May 2002 | 3828 19th St | Counterforce Inc. | garage beam replacement remove postsDetails
garage beam replacement remove posts | $20,000 |
| Oct 11, 2001 | Expired or cancelled expired Feb 2002 | 503 Hoffman Av | Counterforce Inc. | renew 2000/05/23/0699 for final inspection.Details
renew 2000/05/23/0699 for final inspection. | |
| Jul 20, 2000 | Expired or cancelled expired Aug 2001 | 3601 21st St | Counterforce Inc. | remove and replace retaining wallDetails
remove and replace retaining wall | $100,200 |
| May 23, 2000 | Expired or cancelled expired Jul 2001 | 503 Hoffman Av | Counterforce Inc. | replace (e) foundation plumbing and electrical workDetails
replace (e) foundation plumbing and electrical work | $40,000 |
| Apr 25, 2000 | Expired or cancelled expired Nov 2000 | 2423 Green St | Counterforce Inc. | voluntary foundation workDetails
voluntary foundation work | $20,000 |