Block 3619, lot 016
878 Dolores St
- City’s use
- Multi-Family Residential
- Built
- 1966
- Stories
- 2
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 4,884 sq ft
- Lot
- 3,250 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 16, 2026 | In progress issued Jul 2026 | 878 Dolores St | unit# 4: kitchen remodel in-kind: replace countertop & cabinet.Details
unit# 4: kitchen remodel in-kind: replace countertop & cabinet. | $25,000 | |
| Jun 17, 2026 | In progress issued Jun 2026 | 878 Dolores St | recommencement and completion of work approved under pa# 202406033575.Details
recommencement and completion of work approved under pa# 202406033575. | ||
| May 20, 2026 | Expired or cancelled cancelled Jul 2026 | 878 Dolores St | unit 4: revision to permit 202406033575. remove all bathroom remodel work from scope.Details
unit 4: revision to permit 202406033575. remove all bathroom remodel work from scope. | ||
| Apr 24, 2026 | In progress issued Apr 2026 | 878 Dolores St | unit# 4 remove nonload bearing wall in kitchen, relocate light switch and intercom.Details
unit# 4 remove nonload bearing wall in kitchen, relocate light switch and intercom. | $1,000 | |
| Jul 24, 2024 | Completed final sign-off Aug 2024 | 878 Dolores St | Z-Con Specialties Services, Inc | unit#1: remove, transport, and dispose of the following asbestos containing material. approx 165 sf of accoustic ceiling in one bedroom.Details
unit#1: remove, transport, and dispose of the following asbestos containing material. approx 165 sf of accoustic ceiling in one bedroom. | $2,354 |
| Jun 3, 2024 | In progress issued Jun 2024 | 878 Dolores St | Z-Con Specialties Services, Inc | unit 4: abestos abatement (removal) for unit #4. remove popcorn ceiling for living room, kitchen & bedroom. mudding and paint ceiling. remove tub wall tile, bathroom wall tile & floor tile. bathroom remodel in-kind.Details
unit 4: abestos abatement (removal) for unit #4. remove popcorn ceiling for living room, kitchen & bedroom. mudding and paint ceiling. remove tub wall tile, bathroom wall tile & floor tile. bathroom remodel in-kind. | $5,500 |
| Sep 1, 2023 | Completed final sign-off Nov 2023 | 878 Dolores St | American Home Renewal Inc | replace (e) wood siding with fiber cement. back left side of building. includes tear off 800 sqft, 40 lft.Details
replace (e) wood siding with fiber cement. back left side of building. includes tear off 800 sqft, 40 lft. | $38,000 |
| May 8, 2023 | Completed final sign-off Aug 2024 | 878 Dolores St | unit 3 - revision to bpa# 202205093816: remodel bathroom: replace bath tub, tub wall, tiles, vanity cabinet, fan. in-kindDetails
unit 3 - revision to bpa# 202205093816: remodel bathroom: replace bath tub, tub wall, tiles, vanity cabinet, fan. in-kind | ||
| May 23, 2022 | Completed final sign-off Aug 2024 | 878 Dolores St | unit #3. revision to bpa #202205093816: valuation of the kitchen cabinets increased (install new kitchen cabinets).Details
unit #3. revision to bpa #202205093816: valuation of the kitchen cabinets increased (install new kitchen cabinets). | $14,000 | |
| May 9, 2022 | Completed final sign-off Aug 2024 | 878 Dolores St | unit #3: repair water damage subfloor for bathroom. install new kitchen cabinets.Details
unit #3: repair water damage subfloor for bathroom. install new kitchen cabinets. | $5,000 | |
| May 2, 2019 | Never finaled issued May 2019, no final | 878 Dolores St | Automatic Garage Door | new garage 8 ft aluminum garage door w/glass at the top w/in existing opening. no other work.Details
new garage 8 ft aluminum garage door w/glass at the top w/in existing opening. no other work. | $5,200 |
| Dec 10, 2018 | Never finaled issued Dec 2018, no final | 878 Dolores St | Counterforce Inc. | street spaceDetails
street space | |
| Sep 28, 2018 | Never finaled issued Sep 2018, no final | 878 Dolores St | street spaceDetails
street space | ||
| Jul 12, 2018 | Completed final sign-off Mar 2019 | 878 Dolores St | Counterforce Inc. | revision to pa 2017-0817-5145 seismic retrofitDetails
revision to pa 2017-0817-5145 seismic retrofit | $8,000 |
| Jan 19, 2018 | Never finaled issued Jan 2018, no final | 878 Dolores St | replace terra20 front entry stairs and landing with tile.Details
replace terra20 front entry stairs and landing with tile. | $2,500 | |
| Aug 17, 2017 | Completed final sign-off Mar 2019 | 878 Dolores St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $118,000 | |
| Jun 7, 2017 | Completed final sign-off Aug 2017 | 878 Dolores St | Abstract Windows Inc. | unit #5: replace (2) windows with new low e windows same size, same location, not visible from streetDetails
unit #5: replace (2) windows with new low e windows same size, same location, not visible from street | $2,262 |
| Apr 19, 2017 | Expired or cancelled withdrawn Apr 2017 | 878 Dolores St | Acme Sunshades Inc | install awnings for 2 windows one at 8' wide and one at 9' wide on the side of the 3rd floor.Details
install awnings for 2 windows one at 8' wide and one at 9' wide on the side of the 3rd floor. | $1,994 |
| Jul 25, 2016 | Completed final sign-off Aug 2016 | 878 Dolores St | Gomez Iron Works | comply with nov 201626223 dated 7/11/2016, install gate at front entry. note: planning's historic planner justin grieving is working with applicant on an approvable design. remove bars 2 feet above & under the handle to increase transparency.Details
comply with nov 201626223 dated 7/11/2016, install gate at front entry. note: planning's historic planner justin grieving is working with applicant on an approvable design. remove bars 2 feet above & under the handle to increase transparency. | $8,000 |
| Jul 20, 2016 | Never finaled issued Jul 2016, no final | 878 Dolores St | street spaceDetails
street space | ||
| Mar 18, 2013 | Completed final sign-off Apr 2013 | 878 Dolores St | Armando Sanchez Construction | reinforce and strengthening of cracked foundation wall. no changes to existing plan. elevation and use of the bldg. repair approx 27' linear ft.Details
reinforce and strengthening of cracked foundation wall. no changes to existing plan. elevation and use of the bldg. repair approx 27' linear ft. | $11,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Counterforce Inc. (2), Z-Con Specialties Services, Inc (2), Abstract Windows Inc., Acme Sunshades Inc, American Home Renewal Inc, Armando Sanchez Construction, Automatic Garage Door, Gomez Iron Works
- Engineers
- Bishwendu Paul
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.