Claudio Martonffy
- Listed as
- architect
- Firm
- Claudio Martonffy Design
- Based in
- San Francisco
- On San Francisco permits
- Aug 2015 to May 2022
11 permits since 2000 (architect on 11 permits): 9 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 23, 2022 | Never finaled issued May 2022, no final | 730 Polk St | Bevilacqua & Sons | 2/f add fire-rated access door (~8"x8") to existing 2nd floor elevator shaft.Details
2/f add fire-rated access door (~8"x8") to existing 2nd floor elevator shaft. | $2,000 |
| Nov 17, 2021 | Never finaled issued Mar 2022, no final | 1230 Grant Av | paint on sign at from of building. "taqueria el farolito"Details
paint on sign at from of building. "taqueria el farolito" | $1,500 | |
| Aug 9, 2021 | Completed final sign-off Oct 2022 | 1507 California St | Chiang C M Construction Inc. | revision to 201504234504. install remedial measures per vrap(dph). install new in-line fan & air filter system @ roof top. connecting (e) vertical pipe termination @ roof. to comply w/ dph letter. install and connect seismic support and cables. electrical and plumbing under separated permitsDetails
revision to 201504234504. install remedial measures per vrap(dph). install new in-line fan & air filter system @ roof top. connecting (e) vertical pipe termination @ roof. to comply w/ dph letter. install and connect seismic support and cables. electrical and plumbing under separated permits | $5,000 |
| May 21, 2019 | Completed final sign-off Jan 2021 | 3884 17th St | C & M Woodworking Inc Dba C & M General | foundation replacement and voluntary strengthening of the garage. minor excavation to flatten rear patio and parking areas. work to be done on ground fl only.Details
foundation replacement and voluntary strengthening of the garage. minor excavation to flatten rear patio and parking areas. work to be done on ground fl only. | $30,000 |
| Aug 31, 2017 | Completed final sign-off Nov 2019 | 1353 Stevenson St | Edgewood Builders Inc | legalize 1 bedroom, 1 bathroom unit (unit 7) per ord 43-14; lower slab and add bicycleparking.Details
legalize 1 bedroom, 1 bathroom unit (unit 7) per ord 43-14; lower slab and add bicycleparking. | $15,000 |
| Feb 17, 2017 | Completed final sign-off Jun 2017 | 195 Collingwood St | Edgewood Builders Inc | new concrete deck & steps 171 sq ft & 30" from grade at rear of apt bldg.Details
new concrete deck & steps 171 sq ft & 30" from grade at rear of apt bldg. | $8,000 |
| Feb 10, 2017 | Completed final sign-off Jun 2017 | 5811 Mission St | Edgewood Builders Inc | apt 2 - add new partition walls; demo partition walls, relocate /renovate kitchen, repair dry wall as required; add 1 bedroom, no work on facade. add washer and dryer in unitDetails
apt 2 - add new partition walls; demo partition walls, relocate /renovate kitchen, repair dry wall as required; add 1 bedroom, no work on facade. add washer and dryer in unit | $10,000 |
| Aug 15, 2016 | Completed final sign-off Nov 2016 | 5811 Mission St | Edgewood Builders Inc | unit 3 - add new partition wall & demo (e) partition wall. repair drywall as required; add bedroom and studyDetails
unit 3 - add new partition wall & demo (e) partition wall. repair drywall as required; add bedroom and study | $15,000 |
| Jan 14, 2016 | Completed final sign-off Jun 2017 | 195 Collingwood St | Edgewood Builders Inc | add unit per ordinance# 30-15. remodel of existing ground level space into dwelling unit. ref mandatory seismic upgrade pa# 2015/11/13/2496.Details
add unit per ordinance# 30-15. remodel of existing ground level space into dwelling unit. ref mandatory seismic upgrade pa# 2015/11/13/2496. | $30,000 |
| Nov 13, 2015 | Completed final sign-off Dec 2016 | 195 Collingwood St | Edgewood Builders Inc | soft story mandatory seismic retrofit on ground floor per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story mandatory seismic retrofit on ground floor per sfbc chapter 34b, 2012 iebc appendix a-4 | $85,000 |
| Aug 31, 2015 | Completed final sign-off Nov 2020 | 2779 Mission St | J A P Construction | one story horizontal addition for dry storage and refrigerator at the rear of (e) restaurant.Details
one story horizontal addition for dry storage and refrigerator at the rear of (e) restaurant. | $10,000 |