C & M Woodworking Inc Dba C & M General
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Sep 2026
- Last 24 months
- 8 permits filed
55 permits since 2000: 43 completed, 6 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2026 | In progress issued Sep 2026 | 245 Ewing Tr | 50% repair in kind: repair front balcony, reuse existing railing.Details
50% repair in kind: repair front balcony, reuse existing railing. | $2,500 |
| Oct 3, 2025 | In progress issued Oct 2025 | 1020 Union St | unit 27: unit re-wire - bedroom, hallway, dining room, living room, sun room. minor drywall work.Details
unit 27: unit re-wire - bedroom, hallway, dining room, living room, sun room. minor drywall work. | $2,000 |
| Jul 2, 2025 | In progress issued Oct 2025 | 106 08th Av | 2nd/fl: revision to pa#202504114268 reconfiguration of kitchen and bath. first floor convert w.c. into full bath. new electrical and plumbing as required at the area of work only.Details
2nd/fl: revision to pa#202504114268 reconfiguration of kitchen and bath. first floor convert w.c. into full bath. new electrical and plumbing as required at the area of work only. | $3,000 |
| Jun 20, 2025 | In progress issued Oct 2025 | 106 08th Av | 2nd floor. to comply with nov#: 20303047; legalizing window at pl.Details
2nd floor. to comply with nov#: 20303047; legalizing window at pl. | $1,000 |
| Apr 11, 2025 | In progress issued Apr 2025 | 106 08th Av | unit 106-1/f: reconfiguration of porch + adding a wc & laundry at enterance, 2/f: reconfiguration of kitchen & bath. replacing windows inkind.Details
unit 106-1/f: reconfiguration of porch + adding a wc & laundry at enterance, 2/f: reconfiguration of kitchen & bath. replacing windows inkind. | $100,000 |
| Jan 15, 2025 | Completed final sign-off Aug 2026 | 3884 17th St | legalization of rooftop decorative rail in response to nov 202418673. roof to remain unoccupied.Details
legalization of rooftop decorative rail in response to nov 202418673. roof to remain unoccupied. | $5,000 |
| Jan 15, 2025 | In progress issued Jan 2026 | 3884 17th St | convert ground floor wine storage room into sleeping room. relocation existing bathroom and install wet bar. legalize installation of wet bar in response to n.o.v. #202317497.Details
convert ground floor wine storage room into sleeping room. relocation existing bathroom and install wet bar. legalize installation of wet bar in response to n.o.v. #202317497. | $25,000 |
| Dec 2, 2024 | Completed final sign-off Nov 2025 | 260 Holyoke St | in kind bathroom remodel. no change to perimeter walls/footprint- shower, toilet and sinkDetails
in kind bathroom remodel. no change to perimeter walls/footprint- shower, toilet and sink | $1,000 |
| Sep 4, 2024 | Completed final sign-off Aug 2025 | 1020 Union St | unit 27- residential bathroom remodel - no change to (e) wallsDetails
unit 27- residential bathroom remodel - no change to (e) walls | $11,000 |
| Nov 16, 2021 | Completed final sign-off Apr 2023 | 28 Atalaya Tr | convert (e) 1st fl storage space to (n) habitable space connected to (e) 2nd fl via (n) internal stair. renovate & reconfigure 2nd fl bathroom. no work visible from street.Details
convert (e) 1st fl storage space to (n) habitable space connected to (e) 2nd fl via (n) internal stair. renovate & reconfigure 2nd fl bathroom. no work visible from street. | $100,000 |
| May 12, 2021 | Completed final sign-off Apr 2022 | 141 Escolta Wy | 1st fl: interior remodel of e) garge area. (n) storage & laundry at rear of garage. (n) rear exterior sliding door. (n) hvac system to replace (e) furnace. (n) lighting in garage + storage. bolt house to foundation along right side and read side of house.Details
1st fl: interior remodel of e) garge area. (n) storage & laundry at rear of garage. (n) rear exterior sliding door. (n) hvac system to replace (e) furnace. (n) lighting in garage + storage. bolt house to foundation along right side and read side of house. | $30,000 |
| Mar 2, 2020 | Expired or cancelled cancelled Jan 2026 | 260 Holyoke St | replace (e) aluminum window in kind @ ktichen lightwell. window not visible from public wayDetails
replace (e) aluminum window in kind @ ktichen lightwell. window not visible from public way | $1,000 |
| Jan 31, 2020 | Completed final sign-off Jan 2021 | 3884 17th St | revision to pa# 201905211235 - change cost of job, per bldg inspector to add $100000 valuation to job cost. no change to plans, original plans.Details
revision to pa# 201905211235 - change cost of job, per bldg inspector to add $100000 valuation to job cost. no change to plans, original plans. | $100,000 |
| Nov 25, 2019 | Completed final sign-off Nov 2020 | 260 Holyoke St | kitchen remodel. expand extg wall opening. new skylight.Details
kitchen remodel. expand extg wall opening. new skylight. | $34,000 |
| Jul 1, 2019 | Completed final sign-off Jul 2019 | 818 Noe St | install air conditioning system to (3) bedrooms, not visible from street. install per mfg instruction mits.ml2-kp09na interior units, 30 pounds (48"x16" units).Details
install air conditioning system to (3) bedrooms, not visible from street. install per mfg instruction mits.ml2-kp09na interior units, 30 pounds (48"x16" units). | $13,000 |
| May 21, 2019 | Completed final sign-off Jan 2021 | 3884 17th St | foundation replacement and voluntary strengthening of the garage. minor excavation to flatten rear patio and parking areas. work to be done on ground fl only.Details
foundation replacement and voluntary strengthening of the garage. minor excavation to flatten rear patio and parking areas. work to be done on ground fl only. | $30,000 |
| Dec 28, 2018 | Completed final sign-off Apr 2019 | 171 Valley St | install air-conditioning system to 3 bedrooms. work not visible from street. provide access per cmc 304.3. provide guard rails if the unit is within 10' of the roof edge.Details
install air-conditioning system to 3 bedrooms. work not visible from street. provide access per cmc 304.3. provide guard rails if the unit is within 10' of the roof edge. | $13,000 |
| Dec 28, 2018 | Completed final sign-off May 2019 | 2000 Wawona St | replacement of existing driveway, same width with new brick pavers. in compliance with pc sec. 132g.Details
replacement of existing driveway, same width with new brick pavers. in compliance with pc sec. 132g. | $8,000 |
| Sep 27, 2018 | Completed final sign-off Feb 2019 | 3045 Jackson St | kitchen remodel: in kind. no change of existing floor plan. reface existing kitchen cabinets. replace existing kitchen counter tops. replace existing sink.Details
kitchen remodel: in kind. no change of existing floor plan. reface existing kitchen cabinets. replace existing kitchen counter tops. replace existing sink. | $20,000 |
| Jul 6, 2018 | Never finaled issued Jul 2018, no final | 2000 Wawona St | repair stucco/dryrot on side of house, less than 50%, in-kind, not visible from street.Details
repair stucco/dryrot on side of house, less than 50%, in-kind, not visible from street. | $3,000 |
| Jul 6, 2018 | Completed final sign-off Aug 2019 | 123 Retiro Wy | bathroom remodel, replace fixtures and finishes. repairs andupgrades as needed. no structural work, 2/f bathroom only, 40sf.Details
bathroom remodel, replace fixtures and finishes. repairs andupgrades as needed. no structural work, 2/f bathroom only, 40sf. | $35,000 |
| Jun 7, 2018 | Completed final sign-off Nov 2018 | 2000 Wawona St | inkind repair of masonry entry stairs at left side of residenceDetails
inkind repair of masonry entry stairs at left side of residence | $10,000 |
| May 22, 2018 | Expired or cancelled withdrawn Sep 2018 | 2000 Wawona St | replace extg staircase with new, match extg. raise footings at stairs 12" above soil. replace 5 sidewalk squaresDetails
replace extg staircase with new, match extg. raise footings at stairs 12" above soil. replace 5 sidewalk squares | $12,000 |
| Jan 19, 2018 | Completed final sign-off May 2018 | 123 Retiro Wy | infill (e) deck 18.75 sq ft per 2016-1206-4310 not visible from st no other workDetails
infill (e) deck 18.75 sq ft per 2016-1206-4310 not visible from st no other work | $500 |
| Dec 5, 2017 | Completed final sign-off Mar 2018 | 171 Valley St | repair to front staircase dryrot less than 50% repair rear to rear 1st floor deck dryrot in-kind, less than 50%. repair wood stair in-kind.Details
repair to front staircase dryrot less than 50% repair rear to rear 1st floor deck dryrot in-kind, less than 50%. repair wood stair in-kind. | $10,000 |
| Oct 5, 2017 | Completed final sign-off May 2018 | 123 Retiro Wy | revision to pa 2016-1206-4310, changes to guard rail. maher n/aDetails
revision to pa 2016-1206-4310, changes to guard rail. maher n/a | |
| Dec 9, 2016 | Completed final sign-off Mar 2017 | 178 Valley St | revision to pa 2015-0904-6184 s-1, revise heating system from in-floor hydronic to forced air unitDetails
revision to pa 2015-0904-6184 s-1, revise heating system from in-floor hydronic to forced air unit | |
| Dec 6, 2016 | Completed final sign-off May 2018 | 123 Retiro Wy | expand master bath by 17 sq.ft., replace fixtures and finishes; install fire rated wall material; maher n/a new skylightDetails
expand master bath by 17 sq.ft., replace fixtures and finishes; install fire rated wall material; maher n/a new skylight | $75,000 |
| Jul 28, 2016 | Completed final sign-off May 2018 | 123 Retiro Wy | new roof deck: replace window with door from master bedroom; new windows at rear; new skylights; new doors todeck. no changes visible from street.Details
new roof deck: replace window with door from master bedroom; new windows at rear; new skylights; new doors todeck. no changes visible from street. | $67,786 |
| Nov 19, 2015 | Completed final sign-off May 2018 | 123 Retiro Wy | in-kind replacement of extg permitted roof deck on 2nd story roof. replace guardrail with new 42" guardrail. no expansion to roofdeck and no expansion to building envelope.Details
in-kind replacement of extg permitted roof deck on 2nd story roof. replace guardrail with new 42" guardrail. no expansion to roofdeck and no expansion to building envelope. | $5,000 |
| Sep 4, 2015 | Completed final sign-off Mar 2017 | 178 Valley St | demo (e) deck, rear facade, side stair & deck. demo (e) slab on grade @ ground floor. new horizontal extension @ rear yard. excavate (e) 1st floor to provide 8'-6" ceiling height. add new family room, bedroom, bathroom, laundry room, utility room. new interior stair. new patio.Details
demo (e) deck, rear facade, side stair & deck. demo (e) slab on grade @ ground floor. new horizontal extension @ rear yard. excavate (e) 1st floor to provide 8'-6" ceiling height. add new family room, bedroom, bathroom, laundry room, utility room. new interior stair. new patio. | $300,000 |
| Dec 23, 2014 | Never finaled issued Dec 2014, no final | 233 Kensington Wy | bathroom, laundry room remodel & walk-in closet additionDetails
bathroom, laundry room remodel & walk-in closet addition | $40,000 |
| May 29, 2013 | Completed final sign-off Jun 2013 | 600 30th St | replace all siding on back (north) wall. all work in-kind.Details
replace all siding on back (north) wall. all work in-kind. | $10,173 |
| Jun 9, 2010 | Completed final sign-off Jul 2010 | 1825 Church St | replace 5 wooden windows on front side of house, replace in kind, no structural work, no egress affectedDetails
replace 5 wooden windows on front side of house, replace in kind, no structural work, no egress affected | $12,300 |
| Apr 28, 2009 | Completed final sign-off May 2009 | 1401 Guerrero St | provide attachment detail framing detail at 20'-0" high x 6'-0" wide wall with bracing detail as per inspector comments, permit #2008/0826/0027.Details
provide attachment detail framing detail at 20'-0" high x 6'-0" wide wall with bracing detail as per inspector comments, permit #2008/0826/0027. | $500 |
| Jan 20, 2009 | Completed final sign-off May 2009 | 1401 Guerrero St | replace five new footing under existing 4x6 deck posts at rear deck. ref app 200808260027Details
replace five new footing under existing 4x6 deck posts at rear deck. ref app 200808260027 | $1,500 |
| Sep 30, 2008 | Completed final sign-off Oct 2008 | 600 30th St | repair dryrot in garage are-two ceiling joists, 2 studs, header 4x10x42" over exist window.Details
repair dryrot in garage are-two ceiling joists, 2 studs, header 4x10x42" over exist window. | $3,000 |
| Sep 30, 2008 | Completed final sign-off Dec 2008 | 1401 Guerrero St | to complete work and obtain final inspection of work approved under pa#200707187053.Details
to complete work and obtain final inspection of work approved under pa#200707187053. | $2,190 |
| Aug 26, 2008 | Completed final sign-off May 2009 | 1401 Guerrero St | repair (e) railing & screen in kind, replace (e) fence in kind, no structural workDetails
repair (e) railing & screen in kind, replace (e) fence in kind, no structural work | $8,000 |
| Aug 22, 2008 | Completed final sign-off Sep 2008 | 2000 Wawona St | replace existing foundation in garafe on east side of building in 4' section with new foundation.Details
replace existing foundation in garafe on east side of building in 4' section with new foundation. | $20,000 |
| Dec 20, 2007 | Completed final sign-off Jul 2008 | 4069 23rd St | remodel (e) master bath - reconfigure bath fixtures, reconfigure closet. add closet to bedroom. remodel (e) guest bath reconfigure bath fixtures. convert (e) closet into laundry closet. no structural changes.Details
remodel (e) master bath - reconfigure bath fixtures, reconfigure closet. add closet to bedroom. remodel (e) guest bath reconfigure bath fixtures. convert (e) closet into laundry closet. no structural changes. | $85,000 |
| Dec 20, 2007 | Completed final sign-off Apr 2008 | 2694 Folsom St | remodel existing kitchen & bath - change (e) fixtures & cabinets. remove (e) laundry wall enclosure & relocate. add fluorescent under cab lighting. no structural changes.Details
remodel existing kitchen & bath - change (e) fixtures & cabinets. remove (e) laundry wall enclosure & relocate. add fluorescent under cab lighting. no structural changes. | $45,000 |
| Jul 18, 2007 | Expired or cancelled expired Dec 2008 | 1401 Guerrero St | replace (e) main entry door, (e) garage door, 2 (e) upper floor windows; all in the same openings. repaint (e) wood siding. repair & repaint extg stucco. re-clad (e) bay window. no structural work.Details
replace (e) main entry door, (e) garage door, 2 (e) upper floor windows; all in the same openings. repaint (e) wood siding. repair & repaint extg stucco. re-clad (e) bay window. no structural work. | $15,000 |
| Apr 10, 2007 | Completed final sign-off May 2007 | 3886 17th St | reconfigure windows (3) approved in appl#200612210381. revision to original application.Details
reconfigure windows (3) approved in appl#200612210381. revision to original application. | |
| Aug 30, 2006 | Completed final sign-off Dec 2006 | 2530 Diamond St | exterior cosmetic facade makeover.Details
exterior cosmetic facade makeover. | $15,000 |
| May 11, 2006 | Completed final sign-off Nov 2006 | 600 30th St | bathroom remodel. total 2 bathrooms, all l ighting to be floruscentDetails
bathroom remodel. total 2 bathrooms, all l ighting to be floruscent | $25,000 |
| Feb 8, 2006 | Completed final sign-off Mar 2006 | 178 Valley St | install wooden threads & risers over existing front stairs. replace railings. less than 50 percent of stairs maintain rise & run rise 8 & 9 run maintain handrail height min 34 max 38, no openings at ballester grade than 4"Details
install wooden threads & risers over existing front stairs. replace railings. less than 50 percent of stairs maintain rise & run rise 8 & 9 run maintain handrail height min 34 max 38, no openings at ballester grade than 4" | $8,752 |
| Apr 21, 2005 | Completed final sign-off Sep 2005 | 2530 Diamond St | remodel existing bathrm add bay window in the rearDetails
remodel existing bathrm add bay window in the rear | $20,000 |
| Dec 11, 2003 | Completed final sign-off Oct 2004 | 1825 Church St | repair front steps. add awinings & planter. remodel main level & garage level. add skylight in kitchDetails
repair front steps. add awinings & planter. remodel main level & garage level. add skylight in kitch | $150,000 |
| May 29, 2003 | Completed final sign-off Oct 2003 | 1442 Sanchez St | remodel kitchen, master bathroom, repair dry rot under front stairsDetails
remodel kitchen, master bathroom, repair dry rot under front stairs | $77,000 |
| Jun 27, 2002 | Completed final sign-off Nov 2002 | 1027 Hayes St | remodel existing bathroom,bedroom and closet top floor 2nd front of buildingDetails
remodel existing bathroom,bedroom and closet top floor 2nd front of building | $32,940 |
| Aug 16, 2001 | Completed final sign-off Nov 2001 | 3311 Fillmore St | electrical land plumbing hook-ups for wsher and dryer. no structural workDetails
electrical land plumbing hook-ups for wsher and dryer. no structural work | $1,200 |
| Apr 4, 2001 | Completed final sign-off Apr 2001 | 218 Roanoke St | renew expired appn. 9914524sDetails
renew expired appn. 9914524s | |
| Apr 2, 2001 | Completed final sign-off Jun 2001 | 1028 Chestnut St | bathroom remodel-replace toilet,vanity,medicine cabinet shower/tub faucet, floor &shower tiles.Details
bathroom remodel-replace toilet,vanity,medicine cabinet shower/tub faucet, floor &shower tiles. | $15,000 |
| Apr 12, 2000 | Expired or cancelled expired Apr 2001 | 390 Yerba Buena Av | basement bath remodel, replace toilet, sink and showerDetails
basement bath remodel, replace toilet, sink and shower | $10,000 |