Back to bathroom remodel contractors
C & M Woodworking Inc Dba C & M General
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Sep 2026
- Last 24 months
- 8 permits filed
55 permits since 2000: 43 completed, 6 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 12 completed, 3 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 266 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 2, 2025 | In progress issued Oct 2025 | 106 08th Av | 2nd/fl: revision to pa#202504114268 reconfiguration of kitchen and bath. first floor convert w.c. into full bath. new electrical and plumbing as required at the area of work only.Details
2nd/fl: revision to pa#202504114268 reconfiguration of kitchen and bath. first floor convert w.c. into full bath. new electrical and plumbing as required at the area of work only. | $3,000 |
| Apr 11, 2025 | In progress issued Apr 2025 | 106 08th Av | unit 106-1/f: reconfiguration of porch + adding a wc & laundry at enterance, 2/f: reconfiguration of kitchen & bath. replacing windows inkind.Details
unit 106-1/f: reconfiguration of porch + adding a wc & laundry at enterance, 2/f: reconfiguration of kitchen & bath. replacing windows inkind. | $100,000 |
| Jan 15, 2025 | In progress issued Jan 2026 | 3884 17th St | convert ground floor wine storage room into sleeping room. relocation existing bathroom and install wet bar. legalize installation of wet bar in response to n.o.v. #202317497.Details
convert ground floor wine storage room into sleeping room. relocation existing bathroom and install wet bar. legalize installation of wet bar in response to n.o.v. #202317497. | $25,000 |
| Dec 2, 2024 | Completed final sign-off Nov 2025 | 260 Holyoke St | in kind bathroom remodel. no change to perimeter walls/footprint- shower, toilet and sinkDetails
in kind bathroom remodel. no change to perimeter walls/footprint- shower, toilet and sink | $1,000 |
| Sep 4, 2024 | Completed final sign-off Aug 2025 | 1020 Union St | unit 27- residential bathroom remodel - no change to (e) wallsDetails
unit 27- residential bathroom remodel - no change to (e) walls | $11,000 |
| Nov 16, 2021 | Completed final sign-off Apr 2023 | 28 Atalaya Tr | convert (e) 1st fl storage space to (n) habitable space connected to (e) 2nd fl via (n) internal stair. renovate & reconfigure 2nd fl bathroom. no work visible from street.Details
convert (e) 1st fl storage space to (n) habitable space connected to (e) 2nd fl via (n) internal stair. renovate & reconfigure 2nd fl bathroom. no work visible from street. | $100,000 |
| Jul 6, 2018 | Completed final sign-off Aug 2019 | 123 Retiro Wy | bathroom remodel, replace fixtures and finishes. repairs andupgrades as needed. no structural work, 2/f bathroom only, 40sf.Details
bathroom remodel, replace fixtures and finishes. repairs andupgrades as needed. no structural work, 2/f bathroom only, 40sf. | $35,000 |
| Dec 6, 2016 | Completed final sign-off May 2018 | 123 Retiro Wy | expand master bath by 17 sq.ft., replace fixtures and finishes; install fire rated wall material; maher n/a new skylightDetails
expand master bath by 17 sq.ft., replace fixtures and finishes; install fire rated wall material; maher n/a new skylight | $75,000 |
| Sep 4, 2015 | Completed final sign-off Mar 2017 | 178 Valley St | demo (e) deck, rear facade, side stair & deck. demo (e) slab on grade @ ground floor. new horizontal extension @ rear yard. excavate (e) 1st floor to provide 8'-6" ceiling height. add new family room, bedroom, bathroom, laundry room, utility room. new interior stair. new patio.Details
demo (e) deck, rear facade, side stair & deck. demo (e) slab on grade @ ground floor. new horizontal extension @ rear yard. excavate (e) 1st floor to provide 8'-6" ceiling height. add new family room, bedroom, bathroom, laundry room, utility room. new interior stair. new patio. | $300,000 |
| Dec 23, 2014 | Never finaled issued Dec 2014, no final | 233 Kensington Wy | bathroom, laundry room remodel & walk-in closet additionDetails
bathroom, laundry room remodel & walk-in closet addition | $40,000 |
| Dec 20, 2007 | Completed final sign-off Jul 2008 | 4069 23rd St | remodel (e) master bath - reconfigure bath fixtures, reconfigure closet. add closet to bedroom. remodel (e) guest bath reconfigure bath fixtures. convert (e) closet into laundry closet. no structural changes.Details
remodel (e) master bath - reconfigure bath fixtures, reconfigure closet. add closet to bedroom. remodel (e) guest bath reconfigure bath fixtures. convert (e) closet into laundry closet. no structural changes. | $85,000 |
| Dec 20, 2007 | Completed final sign-off Apr 2008 | 2694 Folsom St | remodel existing kitchen & bath - change (e) fixtures & cabinets. remove (e) laundry wall enclosure & relocate. add fluorescent under cab lighting. no structural changes.Details
remodel existing kitchen & bath - change (e) fixtures & cabinets. remove (e) laundry wall enclosure & relocate. add fluorescent under cab lighting. no structural changes. | $45,000 |
| May 11, 2006 | Completed final sign-off Nov 2006 | 600 30th St | bathroom remodel. total 2 bathrooms, all l ighting to be floruscentDetails
bathroom remodel. total 2 bathrooms, all l ighting to be floruscent | $25,000 |
| May 29, 2003 | Completed final sign-off Oct 2003 | 1442 Sanchez St | remodel kitchen, master bathroom, repair dry rot under front stairsDetails
remodel kitchen, master bathroom, repair dry rot under front stairs | $77,000 |
| Jun 27, 2002 | Completed final sign-off Nov 2002 | 1027 Hayes St | remodel existing bathroom,bedroom and closet top floor 2nd front of buildingDetails
remodel existing bathroom,bedroom and closet top floor 2nd front of building | $32,940 |
| Apr 2, 2001 | Completed final sign-off Jun 2001 | 1028 Chestnut St | bathroom remodel-replace toilet,vanity,medicine cabinet shower/tub faucet, floor &shower tiles.Details
bathroom remodel-replace toilet,vanity,medicine cabinet shower/tub faucet, floor &shower tiles. | $15,000 |
| Apr 12, 2000 | Expired or cancelled expired Apr 2001 | 390 Yerba Buena Av | basement bath remodel, replace toilet, sink and showerDetails
basement bath remodel, replace toilet, sink and shower | $10,000 |