Trinity Building Co Llc
- Based in
- San Francisco
- On San Francisco permits
- May 2015 to Mar 2026
- Last 24 months
- 4 permits filed
69 permits since 2000: 62 completed, 1 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2026 | Completed final sign-off Sep 2026 | 4444 20th St | to keep existing ground floor storage space to be used for storage purposes only. not to be considered habitable space. also remove the wet bar/sink that has previously installed woithout a permit (pa#2025-0908-4813).Details
to keep existing ground floor storage space to be used for storage purposes only. not to be considered habitable space. also remove the wet bar/sink that has previously installed woithout a permit (pa#2025-0908-4813). | |
| Jan 21, 2026 | Completed final sign-off Jan 2026 | 28 Hill St | to obtain final inspection for work approved under pa# 202402125729. all work is complete.Details
to obtain final inspection for work approved under pa# 202402125729. all work is complete. | |
| Sep 8, 2025 | Completed final sign-off Sep 2026 | 4444 20th St | revision to 202410152978, field revisions and scope reduction. changes to deck, bathroom layout change. change to french door at deck, tub to shower on 3rd fl.Details
revision to 202410152978, field revisions and scope reduction. changes to deck, bathroom layout change. change to french door at deck, tub to shower on 3rd fl. | |
| Oct 15, 2024 | Completed final sign-off Sep 2026 | 4444 20th St | new deck and stairs to rear yard. bathroom addition and remodel of kitchen and (e) first floor entertainment room. (no new conditioned space)Details
new deck and stairs to rear yard. bathroom addition and remodel of kitchen and (e) first floor entertainment room. (no new conditioned space) | $250,000 |
| Feb 12, 2024 | In progress issued Mar 2024 | 28 Hill St | ref 202211086104-revision to (e) permit to inlcude adding sliding door at office at 1st floor. remodel kitchen and adding sliding door at family room at second floor. remodel master bathroom at third floor.Details
ref 202211086104-revision to (e) permit to inlcude adding sliding door at office at 1st floor. remodel kitchen and adding sliding door at family room at second floor. remodel master bathroom at third floor. | |
| Dec 12, 2023 | Completed final sign-off Dec 2023 | 45 Cole St | revision to pa 202202157985. revise guardrail connection.Details
revision to pa 202202157985. revise guardrail connection. | |
| Dec 12, 2023 | Completed final sign-off Jul 2024 | 1740 Lake St | revision to 202302091740. adding landing to front entry stairs, revised balcony guardrail designDetails
revision to 202302091740. adding landing to front entry stairs, revised balcony guardrail design | |
| Oct 16, 2023 | Completed final sign-off Dec 2023 | 170 Junipero Serra Bl | revision to pa# 202205164330, revised structural details for deck guardrail per building inspector request.Details
revision to pa# 202205164330, revised structural details for deck guardrail per building inspector request. | $100 |
| Feb 9, 2023 | Completed final sign-off Jul 2024 | 1740 Lake St | comply w/planning enf case no 2022-008857 enf rebuild porch per approved pa 2022-0331-1261. adding guardrail to front entry stairs and hogwired balcony guardrailDetails
comply w/planning enf case no 2022-008857 enf rebuild porch per approved pa 2022-0331-1261. adding guardrail to front entry stairs and hogwired balcony guardrail | |
| Jan 20, 2023 | Completed final sign-off Nov 2023 | 2182 Green St | kitchen and (2) bathroom remodels. no structural work.Details
kitchen and (2) bathroom remodels. no structural work. | $100,000 |
| Nov 8, 2022 | Completed final sign-off Jan 2026 | 28 Hill St | 1st flr-reloacate kitchen & remodel bathrm. replace media rm to office. 2nd flr- in-filled light well @ east side of bldg. relocate kitchen, dining rm, fmy rm & living rm. reconfigure interior layout for entire flr. 3rd flr- in-filled lightwell @ east side of bldg. reconfigure interior layout w/...Details
1st flr-reloacate kitchen & remodel bathrm. replace media rm to office. 2nd flr- in-filled light well @ east side of bldg. relocate kitchen, dining rm, fmy rm & living rm. reconfigure interior layout for entire flr. 3rd flr- in-filled lightwell @ east side of bldg. reconfigure interior layout w/... | $100,000 |
| May 16, 2022 | Completed final sign-off Dec 2023 | 170 Junipero Serra Bl | revision to permit 202112013399 revised foundation work. addition of simpson strong wall roof framing plan revision.Details
revision to permit 202112013399 revised foundation work. addition of simpson strong wall roof framing plan revision. | $5,000 |
| May 16, 2022 | Completed final sign-off Dec 2023 | 170 Junipero Serra Bl | gnd fl kitchen remodel; enclosing an (e) outdoor kitchen dining patio; () windows in kitchen facing rear/side yard; (n) wood guardrail on (e) garage roof; (n) wood guardrail @ (e) guest bedroom deck (to replace (e) stucco guardrail)Details
gnd fl kitchen remodel; enclosing an (e) outdoor kitchen dining patio; () windows in kitchen facing rear/side yard; (n) wood guardrail on (e) garage roof; (n) wood guardrail @ (e) guest bedroom deck (to replace (e) stucco guardrail) | $100,000 |
| Mar 31, 2022 | Completed final sign-off Jul 2024 | 1740 Lake St | replace windows, convert front entrance porch to conditioned space. dig out basement & convert to conditioned space. new interior staircase, kitchen remodel, adding 2 and a half baths, demo & reconfigure 2nd fl layout.Details
replace windows, convert front entrance porch to conditioned space. dig out basement & convert to conditioned space. new interior staircase, kitchen remodel, adding 2 and a half baths, demo & reconfigure 2nd fl layout. | $580,000 |
| Mar 16, 2022 | Completed final sign-off Dec 2022 | 555 11th Av | remodel 2 bathrooms and 1 kitchen. no exterior work. remove 1 wall and add 2 steel beams.Details
remodel 2 bathrooms and 1 kitchen. no exterior work. remove 1 wall and add 2 steel beams. | $50,000 |
| Feb 15, 2022 | Completed final sign-off Dec 2023 | 45 Cole St | expand extg roof deck, new finishes in master bath.Details
expand extg roof deck, new finishes in master bath. | $80,000 |
| Feb 15, 2022 | Completed final sign-off Apr 2022 | 160 Corona St | to comply with planning enforcement case #2019-015029enf. restore removed historic site wall & exterior decorative elements @ front facade.Details
to comply with planning enforcement case #2019-015029enf. restore removed historic site wall & exterior decorative elements @ front facade. | $15,000 |
| Dec 1, 2021 | Completed final sign-off Dec 2023 | 170 Junipero Serra Bl | interior remodel including 4 existing bathroom remodels, 1 new bathroom, new interior finishes, new lighting/electrical fixtures, new radiant heating throughout.Details
interior remodel including 4 existing bathroom remodels, 1 new bathroom, new interior finishes, new lighting/electrical fixtures, new radiant heating throughout. | $500,000 |
| Sep 30, 2021 | Completed final sign-off Dec 2021 | 3317 Washington St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $15,000 |
| Jan 5, 2021 | Completed final sign-off Feb 2023 | 419 Peru Av | kitchen renovation. mep under separate permit. waterproofing repair at front interior. no exterior work.Details
kitchen renovation. mep under separate permit. waterproofing repair at front interior. no exterior work. | $20,000 |
| Nov 3, 2020 | Completed final sign-off Feb 2023 | 419 Peru Av | voluntary structural upgrade of masonry foundation. addition of bath in basement. all work within (e) footprint. no facade work. no work in public right of way. interior work only.Details
voluntary structural upgrade of masonry foundation. addition of bath in basement. all work within (e) footprint. no facade work. no work in public right of way. interior work only. | $75,000 |
| Sep 22, 2020 | Completed final sign-off Aug 2022 | 751 Haight St | revision to pa# 201912230435 to include lowering of basement floor & expand area of existing second unit within existing unconditioned space. misc improvemtns due to site conditions.Details
revision to pa# 201912230435 to include lowering of basement floor & expand area of existing second unit within existing unconditioned space. misc improvemtns due to site conditions. | $155,000 |
| Jun 12, 2020 | Completed final sign-off Jan 2022 | 1070 Green St | replace finishes in-kind at 2 bathrooms and 1 kitchen. new wood flooring throughout.Details
replace finishes in-kind at 2 bathrooms and 1 kitchen. new wood flooring throughout. | $49,000 |
| Jan 6, 2020 | Completed final sign-off May 2022 | 751 Haight St | new finishes and fixtures @ existing bathroom on upper unit 1st fl. no structural work. same layoutDetails
new finishes and fixtures @ existing bathroom on upper unit 1st fl. no structural work. same layout | $8,000 |
| Dec 23, 2019 | Completed final sign-off May 2022 | 751 Haight St | replace (e) window with door to (e) deck. remodel kitchen & master bath, add 1 bath on 2nd floor. misc interior work. replace some windows in kind at front. all wood.Details
replace (e) window with door to (e) deck. remodel kitchen & master bath, add 1 bath on 2nd floor. misc interior work. replace some windows in kind at front. all wood. | $118,000 |
| Sep 13, 2019 | Completed final sign-off Jan 2021 | 400 France Av | dry rot repair to the north elevation exterior wall only ~approx 25sf. remove and replace inkind, reuse (e) siding. in kind replacementDetails
dry rot repair to the north elevation exterior wall only ~approx 25sf. remove and replace inkind, reuse (e) siding. in kind replacement | $1,500 |
| Sep 3, 2019 | Completed final sign-off May 2020 | 1434 46th Av | rev to pa# 201905130404Details
rev to pa# 201905130404 | $3,500 |
| Aug 2, 2019 | Completed final sign-off Jan 2021 | 400 France Av | all interior work only no exterior work, kitchen remodel, remove and replace (e) kitchen cabinets, sink, dishwasher, stove, add island and install new recessed lights in kitchen dining room and livingroomDetails
all interior work only no exterior work, kitchen remodel, remove and replace (e) kitchen cabinets, sink, dishwasher, stove, add island and install new recessed lights in kitchen dining room and livingroom | $25,000 |
| Aug 1, 2019 | Completed final sign-off May 2020 | 1434 46th Av | rebuild rear deck new 1 hr wallDetails
rebuild rear deck new 1 hr wall | $10,000 |
| Jun 19, 2019 | Completed final sign-off May 2020 | 1434 46th Av | in revision to app#201905130404 adding a new concrete slab in garageDetails
in revision to app#201905130404 adding a new concrete slab in garage | $2,000 |
| Jun 12, 2019 | Completed final sign-off May 2020 | 1434 46th Av | revision to pa 2019-0513-0404 revised structural concrete details. new footings being added because they do not exist as was assumed with original structural drawings. replace existing slabDetails
revision to pa 2019-0513-0404 revised structural concrete details. new footings being added because they do not exist as was assumed with original structural drawings. replace existing slab | $10,000 |
| May 13, 2019 | Completed final sign-off May 2020 | 1434 46th Av | remodel 2nd level including kitchen & bathroom, new electrical & plumbing, remodel of the 1st level including new bathroom and 2 bedrooms, new electrical new windows througout, no alteration or addition to the (e) building envelopeDetails
remodel 2nd level including kitchen & bathroom, new electrical & plumbing, remodel of the 1st level including new bathroom and 2 bedrooms, new electrical new windows througout, no alteration or addition to the (e) building envelope | $95,000 |
| Apr 22, 2019 | Completed final sign-off Jul 2019 | 728 Duncan St | replace front balcony deck waterproofing. deck is being replaced in-kind, less than 50% of deck is being replced.Details
replace front balcony deck waterproofing. deck is being replaced in-kind, less than 50% of deck is being replced. | $1,000 |
| Apr 19, 2019 | Completed final sign-off Aug 2020 | 785 Cole St | add required structural modifications discovered after demolition to pa 2019-0131-1787Details
add required structural modifications discovered after demolition to pa 2019-0131-1787 | $2,500 |
| Mar 1, 2019 | Completed final sign-off Nov 2022 | 2553 Bryant St | renovation & addition to (e) duplex by vertical & horizontal additions to increase square footage of both units. (n) exterior materials, windows & doors for entire home.Details
renovation & addition to (e) duplex by vertical & horizontal additions to increase square footage of both units. (n) exterior materials, windows & doors for entire home. | $250,000 |
| Jan 31, 2019 | Completed final sign-off Aug 2020 | 785 Cole St | addition of 1st floor bedroom & bathroom for guests off of extg garage. relocation of extg laundry facility in garage to the storage room in the garage. remodel of extg kitchen and half bath on the 2nd floor. this will include new electrical and plmg fixtures and new finishes.Details
addition of 1st floor bedroom & bathroom for guests off of extg garage. relocation of extg laundry facility in garage to the storage room in the garage. remodel of extg kitchen and half bath on the 2nd floor. this will include new electrical and plmg fixtures and new finishes. | $80,000 |
| Dec 20, 2018 | Never finaled issued Aug 2021, no final | 2741 Hyde St | vertical & horizontal expansion w/ facade & fenestration improvements & interior renovation. total of 1637 sq.ft of flr area added. add an additional 3rd unit at ground flr. **maher n/a**Details
vertical & horizontal expansion w/ facade & fenestration improvements & interior renovation. total of 1637 sq.ft of flr area added. add an additional 3rd unit at ground flr. **maher n/a** | $1,200,000 |
| Dec 20, 2018 | Expired or cancelled withdrawn Jan 2019 | 2741 Hyde St | new a 623 sq.ft adu per ord# 162-16 @ ground flr and horizontal expansion @ rear as part of full building renovation under separate permit# 2018-1220-8879 s. **maher n/a**Details
new a 623 sq.ft adu per ord# 162-16 @ ground flr and horizontal expansion @ rear as part of full building renovation under separate permit# 2018-1220-8879 s. **maher n/a** | $150,000 |
| Sep 27, 2018 | Completed final sign-off Oct 2021 | 333 El Camino Del Mar | vertical addition. 4th fl addition: (n) bathroom, bedroom & office space. the proposal is to maintain the (e) building & construct a 1-story addition.Details
vertical addition. 4th fl addition: (n) bathroom, bedroom & office space. the proposal is to maintain the (e) building & construct a 1-story addition. | $185,000 |
| Sep 11, 2018 | Completed final sign-off Nov 2019 | 3317 Washington St | revision to 201803063015 deck extension at rear. supported by post less than 10' above grade and within the allowable rear yard setback; title 24 report revision based on "mep" scope revisiont zoned ac system - complete radiant heating system - revised electricalDetails
revision to 201803063015 deck extension at rear. supported by post less than 10' above grade and within the allowable rear yard setback; title 24 report revision based on "mep" scope revisiont zoned ac system - complete radiant heating system - revised electrical | $20,000 |
| Jul 13, 2018 | Completed final sign-off Nov 2019 | 3317 Washington St | revision to pa 2018-0306-3015 reduction in structural concrete footing scope of work, modification of framing dertailsDetails
revision to pa 2018-0306-3015 reduction in structural concrete footing scope of work, modification of framing dertails | |
| Jun 27, 2018 | Expired or cancelled expired Mar 2026 | 2617 Pacific Av | revision to approved pa 201712287554. per inspector request, documents revised framing of shearwall at grid line b.6Details
revision to approved pa 201712287554. per inspector request, documents revised framing of shearwall at grid line b.6 | |
| May 25, 2018 | Completed final sign-off Sep 2018 | 33 Dellbrook Av | removal and replacement of dry rot damaged wood sidingDetails
removal and replacement of dry rot damaged wood siding | $15,000 |
| May 17, 2018 | Completed final sign-off Sep 2018 | 33 Dellbrook Av | 2 bathrooms: replacing fixutres and finsihes inkind.Details
2 bathrooms: replacing fixutres and finsihes inkind. | $20,000 |
| Mar 6, 2018 | Completed final sign-off Nov 2019 | 3317 Washington St | revision to 201709209061. 3rd flr - remodel, add bathroom, infill 12sq ft lightwell.Details
revision to 201709209061. 3rd flr - remodel, add bathroom, infill 12sq ft lightwell. | $50,000 |
| Mar 1, 2018 | Completed final sign-off Mar 2019 | 948 Stanyan St | remodel e baths, kitchen and dining rm, repair dryrot and replace 3 windows in kind not visible from street, new paint and refinished floors throughout. no structural work. new elec plumbing in areas of workDetails
remodel e baths, kitchen and dining rm, repair dryrot and replace 3 windows in kind not visible from street, new paint and refinished floors throughout. no structural work. new elec plumbing in areas of work | $170,000 |
| Jan 9, 2018 | Completed final sign-off Feb 2019 | 1269 05th Av | interior remodel of vestibule, dining/living room, bedroom, bathroom. maher naDetails
interior remodel of vestibule, dining/living room, bedroom, bathroom. maher na | $30,000 |
| Dec 28, 2017 | Expired or cancelled expired Mar 2026 | 2617 Pacific Av | expansion of kitchen area and install new finishes. expansion of master bathroom and install new finishes.Details
expansion of kitchen area and install new finishes. expansion of master bathroom and install new finishes. | $80,000 |
| Sep 20, 2017 | Completed final sign-off Nov 2019 | 3317 Washington St | kitchen remodel, update finishes, add exterior door at rear. install (n) washer/dryer. (n) int. doors, (n) enlarged skylight, make rear level 3 guardrail code complaint (36" to 42"). maher naDetails
kitchen remodel, update finishes, add exterior door at rear. install (n) washer/dryer. (n) int. doors, (n) enlarged skylight, make rear level 3 guardrail code complaint (36" to 42"). maher na | $90,000 |
| Sep 7, 2017 | Completed final sign-off Jun 2018 | 1271 05th Av | enclose a 21 sq ft light well at 3rd fl unit. remodel 1 hall bath and add second master bath. new combi boiler and air exchanger. add skylights.Details
enclose a 21 sq ft light well at 3rd fl unit. remodel 1 hall bath and add second master bath. new combi boiler and air exchanger. add skylights. | $72,000 |
| Aug 31, 2017 | Completed final sign-off Mar 2018 | 3234 Washington St | unit 2: interior alt of (e) area adn capturing unused void space. bathroom remodel, kitchen remodel using (e) appliances. new electrical and new pluming work at bathroom. n/a maher ordinanceDetails
unit 2: interior alt of (e) area adn capturing unused void space. bathroom remodel, kitchen remodel using (e) appliances. new electrical and new pluming work at bathroom. n/a maher ordinance | $40,000 |
| Aug 24, 2017 | Completed final sign-off May 2018 | 2585 Diamond St | to comply with nov201798631. tear off (e) flat roof based on bad (e) framing condition. refram the flat roof and install new roofing membrane. revision to/added scope to pa#201705317973.Details
to comply with nov201798631. tear off (e) flat roof based on bad (e) framing condition. refram the flat roof and install new roofing membrane. revision to/added scope to pa#201705317973. | $20,000 |
| Jun 7, 2017 | Completed final sign-off Feb 2018 | 2585 Diamond St | removal of leaking windows and exterior doors and replacement in-kind. removal of all stucco in order to waterproof the windows and side walls. new stucco coats. wood siding at window areas to be replaced in kind. new wood sectinoal roll-up garage door.Details
removal of leaking windows and exterior doors and replacement in-kind. removal of all stucco in order to waterproof the windows and side walls. new stucco coats. wood siding at window areas to be replaced in kind. new wood sectinoal roll-up garage door. | $40,000 |
| May 31, 2017 | Completed final sign-off May 2018 | 2585 Diamond St | interior remodel of existing structure. kitchen with new finishes, bathroom with new finishes. upgrade electrical, furnace and ductingDetails
interior remodel of existing structure. kitchen with new finishes, bathroom with new finishes. upgrade electrical, furnace and ducting | $90,000 |
| Dec 6, 2016 | Completed final sign-off Jul 2017 | 453 Lombard St | voluntary seismic upgrade. revisions to permit #2016-0616-0083Details
voluntary seismic upgrade. revisions to permit #2016-0616-0083 | $52,000 |
| Dec 6, 2016 | Completed final sign-off Apr 2017 | 173 Ellsworth St | kitchen remodel: changing cabinets, countertops and tile backsplashDetails
kitchen remodel: changing cabinets, countertops and tile backsplash | $25,000 |
| Jun 23, 2016 | Completed final sign-off Dec 2016 | 17 San Andreas Wy | revision to (e) pa 2016-0323-2875 - after deconstruction and review of design constraints, additional structural framing work was required. structural framing plans and calculations are being added to permit record.Details
revision to (e) pa 2016-0323-2875 - after deconstruction and review of design constraints, additional structural framing work was required. structural framing plans and calculations are being added to permit record. | $10,000 |
| Jun 16, 2016 | Completed final sign-off Jul 2017 | 453 Lombard St | interior alteration 0f 2 unit residence located on 1st story of 3 story 2 unit bldg. scope includes updated room, kitchen, master bath, (n) guest bath & select window replacements in kind at locations not facing public right of wayDetails
interior alteration 0f 2 unit residence located on 1st story of 3 story 2 unit bldg. scope includes updated room, kitchen, master bath, (n) guest bath & select window replacements in kind at locations not facing public right of way | $100,000 |
| Jun 15, 2016 | Completed final sign-off Jun 2019 | 2169 Folsom St | 3rd floor, unit #m301: interior remodel to (e) live/work unit located with in the box factory. remodel includes 1.5 baths add 1 full bathroom, kitchen & stair. maher naDetails
3rd floor, unit #m301: interior remodel to (e) live/work unit located with in the box factory. remodel includes 1.5 baths add 1 full bathroom, kitchen & stair. maher na | $400,000 |
| Apr 12, 2016 | Completed final sign-off Mar 2018 | 2215 California St | (n) 409' sqft vertical addition (s) @ rear. (n) 289 sqft roof deck to replace existing. (n) spiral stair (egress) to rear yard. (n) reconfiguration of master bedroom suite.Details
(n) 409' sqft vertical addition (s) @ rear. (n) 289 sqft roof deck to replace existing. (n) spiral stair (egress) to rear yard. (n) reconfiguration of master bedroom suite. | $100,000 |
| Mar 23, 2016 | Completed final sign-off Dec 2016 | 17 San Andreas Wy | new flooring, lower level, new kitchen cabinets, updated electrical from old knot & tube wiring, pantry wall removed, new kitchen hood attached to existing, min 50% high efficacy, kitchen lighting.Details
new flooring, lower level, new kitchen cabinets, updated electrical from old knot & tube wiring, pantry wall removed, new kitchen hood attached to existing, min 50% high efficacy, kitchen lighting. | $100,000 |
| Mar 22, 2016 | Completed final sign-off Jul 2016 | 757 Rockdale Dr | remodel (e) bathroom. new lighting, new plumbing fixtures. new finishes. all lights are leds at least 1. low effeciency to be controled by vacansy sensor. fan is controlled by humdity stat.Details
remodel (e) bathroom. new lighting, new plumbing fixtures. new finishes. all lights are leds at least 1. low effeciency to be controled by vacansy sensor. fan is controlled by humdity stat. | $16,000 |
| Jan 29, 2016 | Completed final sign-off May 2016 | 2557 California St | bathroom remodel: new plumbing fixtures, new tiles, new lighting. no new wall and no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5.Details
bathroom remodel: new plumbing fixtures, new tiles, new lighting. no new wall and no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5. | $10,000 |
| Dec 30, 2015 | Never finaled issued Jan 2016, no final | 388 Urbano Dr | interior residential alteration - updated kitchen and select window replacements in-kind at a location not facing the public way. no change to existing bldg footprint, height, or area are proposed.Details
interior residential alteration - updated kitchen and select window replacements in-kind at a location not facing the public way. no change to existing bldg footprint, height, or area are proposed. | $40,000 |
| Oct 15, 2015 | Completed final sign-off Feb 2016 | 8400 Oceanview Tr | unit #309: 2 bathroom remodels,all finishes to be replaced,new plumbing fixtures to be installed in 9e)locations,new lighting, no structural work,no wall alteration,all work is within unit #309 only.Details
unit #309: 2 bathroom remodels,all finishes to be replaced,new plumbing fixtures to be installed in 9e)locations,new lighting, no structural work,no wall alteration,all work is within unit #309 only. | $17,500 |
| Aug 21, 2015 | Completed final sign-off Mar 2016 | 2109 23rd St | interior kitchen remodel. new electircal & new plumbing. new finishes throughout. replace leaking window with new windowDetails
interior kitchen remodel. new electircal & new plumbing. new finishes throughout. replace leaking window with new window | $25,000 |
| Jul 8, 2015 | Completed final sign-off May 2016 | 518 Rockdale Dr | remodel (e) bathroom & convert (e) den to bedroom, new office, w/c in (e) envelope, add 120 sf to (e) rear deck. all work @ ground floor levelDetails
remodel (e) bathroom & convert (e) den to bedroom, new office, w/c in (e) envelope, add 120 sf to (e) rear deck. all work @ ground floor level | $120,000 |
| Jun 23, 2015 | Completed final sign-off Oct 2015 | 168 Dolores St | remodel bathroom - replace tub with new; new finishes, replace leaking window in kind. this window is on the light well and cant be seen from the street. to ocmply with cec150.0(k)5; u factor not more than > .32Details
remodel bathroom - replace tub with new; new finishes, replace leaking window in kind. this window is on the light well and cant be seen from the street. to ocmply with cec150.0(k)5; u factor not more than > .32 | $15,000 |
| May 1, 2015 | Expired or cancelled cancelled Jan 2026 | 3916 Sacramento St | installation of new 1hr rated window at the adjoining property line wallDetails
installation of new 1hr rated window at the adjoining property line wall | $5,000 |