Block 1554, lot 007E
555 11th Ave
- City’s use
- Single Family Residential
- Built
- 1915
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 3,341 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 16, 2022 | Completed final sign-off Dec 2022 | 555 11th Av | Trinity Building Co Llc | remodel 2 bathrooms and 1 kitchen. no exterior work. remove 1 wall and add 2 steel beams.Details
remodel 2 bathrooms and 1 kitchen. no exterior work. remove 1 wall and add 2 steel beams. | $50,000 |
| Feb 9, 2018 | Completed final sign-off May 2018 | 555 11th Av | Hoover Brindmore Inc. | kitchen remodel-remove and replace (e) cabinets, counter tops, backsplash. install new stove, reuse (e) refrigerator and ishwasher. add new under cabinet lights. all lighting to be led. install new toilet and sink in bathroom.Details
kitchen remodel-remove and replace (e) cabinets, counter tops, backsplash. install new stove, reuse (e) refrigerator and ishwasher. add new under cabinet lights. all lighting to be led. install new toilet and sink in bathroom. | $50,000 |
| Dec 14, 2015 | Never finaled issued Dec 2015, no final | 555 11th Av | streetspaceDetails
streetspace | ||
| Jun 8, 2015 | Never finaled issued Jun 2015, no final | 555 11th Av | street spaceDetails
street space | ||
| May 12, 2015 | Completed final sign-off Jul 2015 | 555 11th Av | Maap Corp Dba Save Energy Co | replace 7 window 4 visible from street wood to wood frames 3 not visible wood clad frame no structural changes max u factor <.32 front windows to be double hungDetails
replace 7 window 4 visible from street wood to wood frames 3 not visible wood clad frame no structural changes max u factor <.32 front windows to be double hung | $10,572 |
| Feb 27, 2014 | Completed final sign-off Jun 2016 | 555 11th Av | L H Construction | 1st flr & deck addition to (e) 3 story single family res'd. new work includesl new playroom, new guest bedroom, new bathroom, new mud room, new interior stair to 1st flr. new exterioor spiral stair to rear yard, new flat roof with skylights & new parapet walls.Details
1st flr & deck addition to (e) 3 story single family res'd. new work includesl new playroom, new guest bedroom, new bathroom, new mud room, new interior stair to 1st flr. new exterioor spiral stair to rear yard, new flat roof with skylights & new parapet walls. | $50,000 |
| Dec 13, 2013 | Completed final sign-off Aug 2014 | 555 11th Av | 2nd & 3rd floor: reconfigure master bath, master closet, and bath #1. add new laundry room, replace kitchen countertop and cabinetryDetails
2nd & 3rd floor: reconfigure master bath, master closet, and bath #1. add new laundry room, replace kitchen countertop and cabinetry | $60,000 | |
| Dec 2, 2009 | Completed final sign-off Apr 2010 | 555 11th Av | Morena Llc /Dba: Tony's Windows & Glass | replace wood to upgraded vinyl windows within existing sun room openings. no change in window size or opening. windows cannot be viewed from street. a total of 11 windows.Details
replace wood to upgraded vinyl windows within existing sun room openings. no change in window size or opening. windows cannot be viewed from street. a total of 11 windows. | $4,016 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hoover Brindmore Inc., L H Construction, Maap Corp Dba Save Energy Co, Morena Llc /Dba: Tony's Windows & Glass, Trinity Building Co Llc
- Architects
- Emily Huang (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.