Back to kitchen remodel contractors
Trinity Building Co Llc
- Based in
- San Francisco
- On San Francisco permits
- May 2015 to Mar 2026
- Last 24 months
- 4 permits filed
69 permits since 2000: 62 completed, 1 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
24 kitchen remodel permits: 21 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 7 days from filing to permit and 398 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2024 | Completed final sign-off Sep 2026 | 4444 20th St | new deck and stairs to rear yard. bathroom addition and remodel of kitchen and (e) first floor entertainment room. (no new conditioned space)Details
new deck and stairs to rear yard. bathroom addition and remodel of kitchen and (e) first floor entertainment room. (no new conditioned space) | $250,000 |
| Feb 12, 2024 | In progress issued Mar 2024 | 28 Hill St | ref 202211086104-revision to (e) permit to inlcude adding sliding door at office at 1st floor. remodel kitchen and adding sliding door at family room at second floor. remodel master bathroom at third floor.Details
ref 202211086104-revision to (e) permit to inlcude adding sliding door at office at 1st floor. remodel kitchen and adding sliding door at family room at second floor. remodel master bathroom at third floor. | |
| Jan 20, 2023 | Completed final sign-off Nov 2023 | 2182 Green St | kitchen and (2) bathroom remodels. no structural work.Details
kitchen and (2) bathroom remodels. no structural work. | $100,000 |
| Nov 8, 2022 | Completed final sign-off Jan 2026 | 28 Hill St | 1st flr-reloacate kitchen & remodel bathrm. replace media rm to office. 2nd flr- in-filled light well @ east side of bldg. relocate kitchen, dining rm, fmy rm & living rm. reconfigure interior layout for entire flr. 3rd flr- in-filled lightwell @ east side of bldg. reconfigure interior layout w/...Details
1st flr-reloacate kitchen & remodel bathrm. replace media rm to office. 2nd flr- in-filled light well @ east side of bldg. relocate kitchen, dining rm, fmy rm & living rm. reconfigure interior layout for entire flr. 3rd flr- in-filled lightwell @ east side of bldg. reconfigure interior layout w/... | $100,000 |
| May 16, 2022 | Completed final sign-off Dec 2023 | 170 Junipero Serra Bl | gnd fl kitchen remodel; enclosing an (e) outdoor kitchen dining patio; () windows in kitchen facing rear/side yard; (n) wood guardrail on (e) garage roof; (n) wood guardrail @ (e) guest bedroom deck (to replace (e) stucco guardrail)Details
gnd fl kitchen remodel; enclosing an (e) outdoor kitchen dining patio; () windows in kitchen facing rear/side yard; (n) wood guardrail on (e) garage roof; (n) wood guardrail @ (e) guest bedroom deck (to replace (e) stucco guardrail) | $100,000 |
| Mar 31, 2022 | Completed final sign-off Jul 2024 | 1740 Lake St | replace windows, convert front entrance porch to conditioned space. dig out basement & convert to conditioned space. new interior staircase, kitchen remodel, adding 2 and a half baths, demo & reconfigure 2nd fl layout.Details
replace windows, convert front entrance porch to conditioned space. dig out basement & convert to conditioned space. new interior staircase, kitchen remodel, adding 2 and a half baths, demo & reconfigure 2nd fl layout. | $580,000 |
| Mar 16, 2022 | Completed final sign-off Dec 2022 | 555 11th Av | remodel 2 bathrooms and 1 kitchen. no exterior work. remove 1 wall and add 2 steel beams.Details
remodel 2 bathrooms and 1 kitchen. no exterior work. remove 1 wall and add 2 steel beams. | $50,000 |
| Jan 5, 2021 | Completed final sign-off Feb 2023 | 419 Peru Av | kitchen renovation. mep under separate permit. waterproofing repair at front interior. no exterior work.Details
kitchen renovation. mep under separate permit. waterproofing repair at front interior. no exterior work. | $20,000 |
| Jun 12, 2020 | Completed final sign-off Jan 2022 | 1070 Green St | replace finishes in-kind at 2 bathrooms and 1 kitchen. new wood flooring throughout.Details
replace finishes in-kind at 2 bathrooms and 1 kitchen. new wood flooring throughout. | $49,000 |
| Dec 23, 2019 | Completed final sign-off May 2022 | 751 Haight St | replace (e) window with door to (e) deck. remodel kitchen & master bath, add 1 bath on 2nd floor. misc interior work. replace some windows in kind at front. all wood.Details
replace (e) window with door to (e) deck. remodel kitchen & master bath, add 1 bath on 2nd floor. misc interior work. replace some windows in kind at front. all wood. | $118,000 |
| Aug 2, 2019 | Completed final sign-off Jan 2021 | 400 France Av | all interior work only no exterior work, kitchen remodel, remove and replace (e) kitchen cabinets, sink, dishwasher, stove, add island and install new recessed lights in kitchen dining room and livingroomDetails
all interior work only no exterior work, kitchen remodel, remove and replace (e) kitchen cabinets, sink, dishwasher, stove, add island and install new recessed lights in kitchen dining room and livingroom | $25,000 |
| May 13, 2019 | Completed final sign-off May 2020 | 1434 46th Av | remodel 2nd level including kitchen & bathroom, new electrical & plumbing, remodel of the 1st level including new bathroom and 2 bedrooms, new electrical new windows througout, no alteration or addition to the (e) building envelopeDetails
remodel 2nd level including kitchen & bathroom, new electrical & plumbing, remodel of the 1st level including new bathroom and 2 bedrooms, new electrical new windows througout, no alteration or addition to the (e) building envelope | $95,000 |
| Jan 31, 2019 | Completed final sign-off Aug 2020 | 785 Cole St | addition of 1st floor bedroom & bathroom for guests off of extg garage. relocation of extg laundry facility in garage to the storage room in the garage. remodel of extg kitchen and half bath on the 2nd floor. this will include new electrical and plmg fixtures and new finishes.Details
addition of 1st floor bedroom & bathroom for guests off of extg garage. relocation of extg laundry facility in garage to the storage room in the garage. remodel of extg kitchen and half bath on the 2nd floor. this will include new electrical and plmg fixtures and new finishes. | $80,000 |
| Mar 1, 2018 | Completed final sign-off Mar 2019 | 948 Stanyan St | remodel e baths, kitchen and dining rm, repair dryrot and replace 3 windows in kind not visible from street, new paint and refinished floors throughout. no structural work. new elec plumbing in areas of workDetails
remodel e baths, kitchen and dining rm, repair dryrot and replace 3 windows in kind not visible from street, new paint and refinished floors throughout. no structural work. new elec plumbing in areas of work | $170,000 |
| Dec 28, 2017 | Expired or cancelled expired Mar 2026 | 2617 Pacific Av | expansion of kitchen area and install new finishes. expansion of master bathroom and install new finishes.Details
expansion of kitchen area and install new finishes. expansion of master bathroom and install new finishes. | $80,000 |
| Sep 20, 2017 | Completed final sign-off Nov 2019 | 3317 Washington St | kitchen remodel, update finishes, add exterior door at rear. install (n) washer/dryer. (n) int. doors, (n) enlarged skylight, make rear level 3 guardrail code complaint (36" to 42"). maher naDetails
kitchen remodel, update finishes, add exterior door at rear. install (n) washer/dryer. (n) int. doors, (n) enlarged skylight, make rear level 3 guardrail code complaint (36" to 42"). maher na | $90,000 |
| Aug 31, 2017 | Completed final sign-off Mar 2018 | 3234 Washington St | unit 2: interior alt of (e) area adn capturing unused void space. bathroom remodel, kitchen remodel using (e) appliances. new electrical and new pluming work at bathroom. n/a maher ordinanceDetails
unit 2: interior alt of (e) area adn capturing unused void space. bathroom remodel, kitchen remodel using (e) appliances. new electrical and new pluming work at bathroom. n/a maher ordinance | $40,000 |
| May 31, 2017 | Completed final sign-off May 2018 | 2585 Diamond St | interior remodel of existing structure. kitchen with new finishes, bathroom with new finishes. upgrade electrical, furnace and ductingDetails
interior remodel of existing structure. kitchen with new finishes, bathroom with new finishes. upgrade electrical, furnace and ducting | $90,000 |
| Dec 6, 2016 | Completed final sign-off Apr 2017 | 173 Ellsworth St | kitchen remodel: changing cabinets, countertops and tile backsplashDetails
kitchen remodel: changing cabinets, countertops and tile backsplash | $25,000 |
| Jun 16, 2016 | Completed final sign-off Jul 2017 | 453 Lombard St | interior alteration 0f 2 unit residence located on 1st story of 3 story 2 unit bldg. scope includes updated room, kitchen, master bath, (n) guest bath & select window replacements in kind at locations not facing public right of wayDetails
interior alteration 0f 2 unit residence located on 1st story of 3 story 2 unit bldg. scope includes updated room, kitchen, master bath, (n) guest bath & select window replacements in kind at locations not facing public right of way | $100,000 |
| Jun 15, 2016 | Completed final sign-off Jun 2019 | 2169 Folsom St | 3rd floor, unit #m301: interior remodel to (e) live/work unit located with in the box factory. remodel includes 1.5 baths add 1 full bathroom, kitchen & stair. maher naDetails
3rd floor, unit #m301: interior remodel to (e) live/work unit located with in the box factory. remodel includes 1.5 baths add 1 full bathroom, kitchen & stair. maher na | $400,000 |
| Mar 23, 2016 | Completed final sign-off Dec 2016 | 17 San Andreas Wy | new flooring, lower level, new kitchen cabinets, updated electrical from old knot & tube wiring, pantry wall removed, new kitchen hood attached to existing, min 50% high efficacy, kitchen lighting.Details
new flooring, lower level, new kitchen cabinets, updated electrical from old knot & tube wiring, pantry wall removed, new kitchen hood attached to existing, min 50% high efficacy, kitchen lighting. | $100,000 |
| Dec 30, 2015 | Never finaled issued Jan 2016, no final | 388 Urbano Dr | interior residential alteration - updated kitchen and select window replacements in-kind at a location not facing the public way. no change to existing bldg footprint, height, or area are proposed.Details
interior residential alteration - updated kitchen and select window replacements in-kind at a location not facing the public way. no change to existing bldg footprint, height, or area are proposed. | $40,000 |
| Aug 21, 2015 | Completed final sign-off Mar 2016 | 2109 23rd St | interior kitchen remodel. new electircal & new plumbing. new finishes throughout. replace leaking window with new windowDetails
interior kitchen remodel. new electircal & new plumbing. new finishes throughout. replace leaking window with new window | $25,000 |