Back to bathroom remodel contractors
Trinity Building Co Llc
- Based in
- San Francisco
- On San Francisco permits
- May 2015 to Mar 2026
- Last 24 months
- 4 permits filed
69 permits since 2000: 62 completed, 1 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
31 bathroom remodel permits: 29 completed, 1 in progress, 1 expired or cancelled. Typically 7 days from filing to permit and 379 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 8, 2025 | Completed final sign-off Sep 2026 | 4444 20th St | revision to 202410152978, field revisions and scope reduction. changes to deck, bathroom layout change. change to french door at deck, tub to shower on 3rd fl.Details
revision to 202410152978, field revisions and scope reduction. changes to deck, bathroom layout change. change to french door at deck, tub to shower on 3rd fl. | |
| Oct 15, 2024 | Completed final sign-off Sep 2026 | 4444 20th St | new deck and stairs to rear yard. bathroom addition and remodel of kitchen and (e) first floor entertainment room. (no new conditioned space)Details
new deck and stairs to rear yard. bathroom addition and remodel of kitchen and (e) first floor entertainment room. (no new conditioned space) | $250,000 |
| Feb 12, 2024 | In progress issued Mar 2024 | 28 Hill St | ref 202211086104-revision to (e) permit to inlcude adding sliding door at office at 1st floor. remodel kitchen and adding sliding door at family room at second floor. remodel master bathroom at third floor.Details
ref 202211086104-revision to (e) permit to inlcude adding sliding door at office at 1st floor. remodel kitchen and adding sliding door at family room at second floor. remodel master bathroom at third floor. | |
| Jan 20, 2023 | Completed final sign-off Nov 2023 | 2182 Green St | kitchen and (2) bathroom remodels. no structural work.Details
kitchen and (2) bathroom remodels. no structural work. | $100,000 |
| Mar 31, 2022 | Completed final sign-off Jul 2024 | 1740 Lake St | replace windows, convert front entrance porch to conditioned space. dig out basement & convert to conditioned space. new interior staircase, kitchen remodel, adding 2 and a half baths, demo & reconfigure 2nd fl layout.Details
replace windows, convert front entrance porch to conditioned space. dig out basement & convert to conditioned space. new interior staircase, kitchen remodel, adding 2 and a half baths, demo & reconfigure 2nd fl layout. | $580,000 |
| Mar 16, 2022 | Completed final sign-off Dec 2022 | 555 11th Av | remodel 2 bathrooms and 1 kitchen. no exterior work. remove 1 wall and add 2 steel beams.Details
remodel 2 bathrooms and 1 kitchen. no exterior work. remove 1 wall and add 2 steel beams. | $50,000 |
| Feb 15, 2022 | Completed final sign-off Dec 2023 | 45 Cole St | expand extg roof deck, new finishes in master bath.Details
expand extg roof deck, new finishes in master bath. | $80,000 |
| Dec 1, 2021 | Completed final sign-off Dec 2023 | 170 Junipero Serra Bl | interior remodel including 4 existing bathroom remodels, 1 new bathroom, new interior finishes, new lighting/electrical fixtures, new radiant heating throughout.Details
interior remodel including 4 existing bathroom remodels, 1 new bathroom, new interior finishes, new lighting/electrical fixtures, new radiant heating throughout. | $500,000 |
| Sep 30, 2021 | Completed final sign-off Dec 2021 | 3317 Washington St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $15,000 |
| Nov 3, 2020 | Completed final sign-off Feb 2023 | 419 Peru Av | voluntary structural upgrade of masonry foundation. addition of bath in basement. all work within (e) footprint. no facade work. no work in public right of way. interior work only.Details
voluntary structural upgrade of masonry foundation. addition of bath in basement. all work within (e) footprint. no facade work. no work in public right of way. interior work only. | $75,000 |
| Jun 12, 2020 | Completed final sign-off Jan 2022 | 1070 Green St | replace finishes in-kind at 2 bathrooms and 1 kitchen. new wood flooring throughout.Details
replace finishes in-kind at 2 bathrooms and 1 kitchen. new wood flooring throughout. | $49,000 |
| Jan 6, 2020 | Completed final sign-off May 2022 | 751 Haight St | new finishes and fixtures @ existing bathroom on upper unit 1st fl. no structural work. same layoutDetails
new finishes and fixtures @ existing bathroom on upper unit 1st fl. no structural work. same layout | $8,000 |
| Dec 23, 2019 | Completed final sign-off May 2022 | 751 Haight St | replace (e) window with door to (e) deck. remodel kitchen & master bath, add 1 bath on 2nd floor. misc interior work. replace some windows in kind at front. all wood.Details
replace (e) window with door to (e) deck. remodel kitchen & master bath, add 1 bath on 2nd floor. misc interior work. replace some windows in kind at front. all wood. | $118,000 |
| May 13, 2019 | Completed final sign-off May 2020 | 1434 46th Av | remodel 2nd level including kitchen & bathroom, new electrical & plumbing, remodel of the 1st level including new bathroom and 2 bedrooms, new electrical new windows througout, no alteration or addition to the (e) building envelopeDetails
remodel 2nd level including kitchen & bathroom, new electrical & plumbing, remodel of the 1st level including new bathroom and 2 bedrooms, new electrical new windows througout, no alteration or addition to the (e) building envelope | $95,000 |
| Jan 31, 2019 | Completed final sign-off Aug 2020 | 785 Cole St | addition of 1st floor bedroom & bathroom for guests off of extg garage. relocation of extg laundry facility in garage to the storage room in the garage. remodel of extg kitchen and half bath on the 2nd floor. this will include new electrical and plmg fixtures and new finishes.Details
addition of 1st floor bedroom & bathroom for guests off of extg garage. relocation of extg laundry facility in garage to the storage room in the garage. remodel of extg kitchen and half bath on the 2nd floor. this will include new electrical and plmg fixtures and new finishes. | $80,000 |
| Sep 27, 2018 | Completed final sign-off Oct 2021 | 333 El Camino Del Mar | vertical addition. 4th fl addition: (n) bathroom, bedroom & office space. the proposal is to maintain the (e) building & construct a 1-story addition.Details
vertical addition. 4th fl addition: (n) bathroom, bedroom & office space. the proposal is to maintain the (e) building & construct a 1-story addition. | $185,000 |
| May 17, 2018 | Completed final sign-off Sep 2018 | 33 Dellbrook Av | 2 bathrooms: replacing fixutres and finsihes inkind.Details
2 bathrooms: replacing fixutres and finsihes inkind. | $20,000 |
| Mar 6, 2018 | Completed final sign-off Nov 2019 | 3317 Washington St | revision to 201709209061. 3rd flr - remodel, add bathroom, infill 12sq ft lightwell.Details
revision to 201709209061. 3rd flr - remodel, add bathroom, infill 12sq ft lightwell. | $50,000 |
| Mar 1, 2018 | Completed final sign-off Mar 2019 | 948 Stanyan St | remodel e baths, kitchen and dining rm, repair dryrot and replace 3 windows in kind not visible from street, new paint and refinished floors throughout. no structural work. new elec plumbing in areas of workDetails
remodel e baths, kitchen and dining rm, repair dryrot and replace 3 windows in kind not visible from street, new paint and refinished floors throughout. no structural work. new elec plumbing in areas of work | $170,000 |
| Jan 9, 2018 | Completed final sign-off Feb 2019 | 1269 05th Av | interior remodel of vestibule, dining/living room, bedroom, bathroom. maher naDetails
interior remodel of vestibule, dining/living room, bedroom, bathroom. maher na | $30,000 |
| Dec 28, 2017 | Expired or cancelled expired Mar 2026 | 2617 Pacific Av | expansion of kitchen area and install new finishes. expansion of master bathroom and install new finishes.Details
expansion of kitchen area and install new finishes. expansion of master bathroom and install new finishes. | $80,000 |
| Sep 7, 2017 | Completed final sign-off Jun 2018 | 1271 05th Av | enclose a 21 sq ft light well at 3rd fl unit. remodel 1 hall bath and add second master bath. new combi boiler and air exchanger. add skylights.Details
enclose a 21 sq ft light well at 3rd fl unit. remodel 1 hall bath and add second master bath. new combi boiler and air exchanger. add skylights. | $72,000 |
| Aug 31, 2017 | Completed final sign-off Mar 2018 | 3234 Washington St | unit 2: interior alt of (e) area adn capturing unused void space. bathroom remodel, kitchen remodel using (e) appliances. new electrical and new pluming work at bathroom. n/a maher ordinanceDetails
unit 2: interior alt of (e) area adn capturing unused void space. bathroom remodel, kitchen remodel using (e) appliances. new electrical and new pluming work at bathroom. n/a maher ordinance | $40,000 |
| May 31, 2017 | Completed final sign-off May 2018 | 2585 Diamond St | interior remodel of existing structure. kitchen with new finishes, bathroom with new finishes. upgrade electrical, furnace and ductingDetails
interior remodel of existing structure. kitchen with new finishes, bathroom with new finishes. upgrade electrical, furnace and ducting | $90,000 |
| Jun 16, 2016 | Completed final sign-off Jul 2017 | 453 Lombard St | interior alteration 0f 2 unit residence located on 1st story of 3 story 2 unit bldg. scope includes updated room, kitchen, master bath, (n) guest bath & select window replacements in kind at locations not facing public right of wayDetails
interior alteration 0f 2 unit residence located on 1st story of 3 story 2 unit bldg. scope includes updated room, kitchen, master bath, (n) guest bath & select window replacements in kind at locations not facing public right of way | $100,000 |
| Jun 15, 2016 | Completed final sign-off Jun 2019 | 2169 Folsom St | 3rd floor, unit #m301: interior remodel to (e) live/work unit located with in the box factory. remodel includes 1.5 baths add 1 full bathroom, kitchen & stair. maher naDetails
3rd floor, unit #m301: interior remodel to (e) live/work unit located with in the box factory. remodel includes 1.5 baths add 1 full bathroom, kitchen & stair. maher na | $400,000 |
| Mar 22, 2016 | Completed final sign-off Jul 2016 | 757 Rockdale Dr | remodel (e) bathroom. new lighting, new plumbing fixtures. new finishes. all lights are leds at least 1. low effeciency to be controled by vacansy sensor. fan is controlled by humdity stat.Details
remodel (e) bathroom. new lighting, new plumbing fixtures. new finishes. all lights are leds at least 1. low effeciency to be controled by vacansy sensor. fan is controlled by humdity stat. | $16,000 |
| Jan 29, 2016 | Completed final sign-off May 2016 | 2557 California St | bathroom remodel: new plumbing fixtures, new tiles, new lighting. no new wall and no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5.Details
bathroom remodel: new plumbing fixtures, new tiles, new lighting. no new wall and no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5. | $10,000 |
| Oct 15, 2015 | Completed final sign-off Feb 2016 | 8400 Oceanview Tr | unit #309: 2 bathroom remodels,all finishes to be replaced,new plumbing fixtures to be installed in 9e)locations,new lighting, no structural work,no wall alteration,all work is within unit #309 only.Details
unit #309: 2 bathroom remodels,all finishes to be replaced,new plumbing fixtures to be installed in 9e)locations,new lighting, no structural work,no wall alteration,all work is within unit #309 only. | $17,500 |
| Jul 8, 2015 | Completed final sign-off May 2016 | 518 Rockdale Dr | remodel (e) bathroom & convert (e) den to bedroom, new office, w/c in (e) envelope, add 120 sf to (e) rear deck. all work @ ground floor levelDetails
remodel (e) bathroom & convert (e) den to bedroom, new office, w/c in (e) envelope, add 120 sf to (e) rear deck. all work @ ground floor level | $120,000 |
| Jun 23, 2015 | Completed final sign-off Oct 2015 | 168 Dolores St | remodel bathroom - replace tub with new; new finishes, replace leaking window in kind. this window is on the light well and cant be seen from the street. to ocmply with cec150.0(k)5; u factor not more than > .32Details
remodel bathroom - replace tub with new; new finishes, replace leaking window in kind. this window is on the light well and cant be seen from the street. to ocmply with cec150.0(k)5; u factor not more than > .32 | $15,000 |