Trinity Building Co Llc
- Based in
- San Francisco
- On San Francisco permits
- May 2015 to Mar 2026
- Last 24 months
- 4 permits filed
69 permits since 2000: 62 completed, 1 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 6 completed. Typically 179 days from filing to permit and 476 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2024 | Completed final sign-off Sep 2026 | 4444 20th St | new deck and stairs to rear yard. bathroom addition and remodel of kitchen and (e) first floor entertainment room. (no new conditioned space)Details
new deck and stairs to rear yard. bathroom addition and remodel of kitchen and (e) first floor entertainment room. (no new conditioned space) | $250,000 |
| Dec 12, 2023 | Completed final sign-off Jul 2024 | 1740 Lake St | revision to 202302091740. adding landing to front entry stairs, revised balcony guardrail designDetails
revision to 202302091740. adding landing to front entry stairs, revised balcony guardrail design | |
| Feb 9, 2023 | Completed final sign-off Jul 2024 | 1740 Lake St | comply w/planning enf case no 2022-008857 enf rebuild porch per approved pa 2022-0331-1261. adding guardrail to front entry stairs and hogwired balcony guardrailDetails
comply w/planning enf case no 2022-008857 enf rebuild porch per approved pa 2022-0331-1261. adding guardrail to front entry stairs and hogwired balcony guardrail | |
| Mar 31, 2022 | Completed final sign-off Jul 2024 | 1740 Lake St | replace windows, convert front entrance porch to conditioned space. dig out basement & convert to conditioned space. new interior staircase, kitchen remodel, adding 2 and a half baths, demo & reconfigure 2nd fl layout.Details
replace windows, convert front entrance porch to conditioned space. dig out basement & convert to conditioned space. new interior staircase, kitchen remodel, adding 2 and a half baths, demo & reconfigure 2nd fl layout. | $580,000 |
| Jun 15, 2016 | Completed final sign-off Jun 2019 | 2169 Folsom St | 3rd floor, unit #m301: interior remodel to (e) live/work unit located with in the box factory. remodel includes 1.5 baths add 1 full bathroom, kitchen & stair. maher naDetails
3rd floor, unit #m301: interior remodel to (e) live/work unit located with in the box factory. remodel includes 1.5 baths add 1 full bathroom, kitchen & stair. maher na | $400,000 |
| Apr 12, 2016 | Completed final sign-off Mar 2018 | 2215 California St | (n) 409' sqft vertical addition (s) @ rear. (n) 289 sqft roof deck to replace existing. (n) spiral stair (egress) to rear yard. (n) reconfiguration of master bedroom suite.Details
(n) 409' sqft vertical addition (s) @ rear. (n) 289 sqft roof deck to replace existing. (n) spiral stair (egress) to rear yard. (n) reconfiguration of master bedroom suite. | $100,000 |