Block 0113, lot 006
200 Green St
- City’s use
- Industrial
- Built
- 1923
- Stories
- 2
- Units
- 1
- Rooms
- 5 bathrooms
- Building
- 18,572 sq ft
- Lot
- 8,403 sq ft
- Zoning
- C2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 6, 2025 | Completed final sign-off May 2025 | 200 Green St | Fog City Roofiing Llc | reroof flat roof, modified bitumen, hot works.Details
reroof flat roof, modified bitumen, hot works. | $119,600 |
| Oct 17, 2024 | In progress issued Oct 2024 | 200 Green St | to obtain final inspection for work approved under pa#: 2016-1129-3630 and 2022-0128-6881 all work is complete.Details
to obtain final inspection for work approved under pa#: 2016-1129-3630 and 2022-0128-6881 all work is complete. | ||
| Jan 28, 2022 | Never finaled issued Jan 2022, no final | 200 Green St | Meylan Construction | revision to permit #202106243158. install new ada automatic door opener system at suite 200 main entrance.Details
revision to permit #202106243158. install new ada automatic door opener system at suite 200 main entrance. | $1,500 |
| Nov 18, 2021 | Expired or cancelled cancelled Jan 2026 | 200 Green St | Tri County Electric Inc | addition of 9 power outlets for new offices, abandon 6 wall power outlets, relocate 5 (e) surface mount light fixtures, install new lighting controls for new officesDetails
addition of 9 power outlets for new offices, abandon 6 wall power outlets, relocate 5 (e) surface mount light fixtures, install new lighting controls for new offices | $6,000 |
| Jun 24, 2021 | Completed final sign-off Feb 2022 | 200 Green St | Meylan Construction | interior work only, add interior non bearing partitoins on 1st fl and cleaned up finishesDetails
interior work only, add interior non bearing partitoins on 1st fl and cleaned up finishes | $48,000 |
| Apr 5, 2021 | Expired or cancelled withdrawn Jul 2021 | 200 Green St | Maven Maintenance Inc | addition of steel/wood formed catchment wall as extension into an (e) concrete site retaining wall for protection from falling small rocks and misc debris.Details
addition of steel/wood formed catchment wall as extension into an (e) concrete site retaining wall for protection from falling small rocks and misc debris. | $16,000 |
| Oct 11, 2018 | Completed final sign-off Apr 2019 | 200 Green St | Vk Construction | add fire rated security door and replace stair door at 2nd fl. with fire rated door. accessibility upgradesDetails
add fire rated security door and replace stair door at 2nd fl. with fire rated door. accessibility upgrades | $14,765 |
| Aug 21, 2017 | Completed final sign-off Apr 2018 | 200 Green St | Tulley Mechanical, Inc | furnish and install hvac system for remodeled offices including ducting, grilles and controls. ref app#201706209842Details
furnish and install hvac system for remodeled offices including ducting, grilles and controls. ref app#201706209842 | $83,000 |
| Jul 20, 2017 | Never finaled issued Jul 2017, no final | 200 Green St | Elson Electric Inc | new lighting off of extg panel. new power off of extg panel. ref app#201706209842Details
new lighting off of extg panel. new power off of extg panel. ref app#201706209842 | $55,000 |
| Jun 20, 2017 | Completed final sign-off Apr 2018 | 200 Green St | D A Pope Inc | construction of non-structural partitions, doors, frames, hardware, millwork, drywall, ceiling and finishes.Details
construction of non-structural partitions, doors, frames, hardware, millwork, drywall, ceiling and finishes. | $369,042 |
| Nov 29, 2016 | Never finaled issued May 2018, no final | 200 Green St | Vk Construction | change in use for 1st floor from manefacturing to office. barrier removal at front entry.Details
change in use for 1st floor from manefacturing to office. barrier removal at front entry. | $6,000 |
| Apr 5, 2016 | Never finaled filed Apr 2016, never issued | 200 Green St | remove 11 operable windows, install exact same new window frames.Details
remove 11 operable windows, install exact same new window frames. | $6,000 | |
| Nov 2, 2015 | Expired or cancelled cancelled Jan 2020 | 200 Green St | Blackline Construction | comply with nov #201278281. change use to office, change lighting. remove (e) walls, add (n) walls, alter hvacDetails
comply with nov #201278281. change use to office, change lighting. remove (e) walls, add (n) walls, alter hvac | $20,000 |
| Aug 26, 2015 | Completed final sign-off Sep 2015 | 200 Green St | Pascual Diaz Construction | to comply with complaint #201278281. remove tile/carpet from floor. hung 3 sliding doors to cover a pipe. run cat 6 wiring. painted floors & walls; framing per plans pa#201508174402.Details
to comply with complaint #201278281. remove tile/carpet from floor. hung 3 sliding doors to cover a pipe. run cat 6 wiring. painted floors & walls; framing per plans pa#201508174402. | $900 |
| Aug 17, 2015 | Completed final sign-off Sep 2015 | 200 Green St | Pascual Diaz Construction | comply with nov 201278281 - new curtain glass partition. no new conditioned space or fenestration or change to building envelope. no electrical, mechanical or plumbing work to be doneDetails
comply with nov 201278281 - new curtain glass partition. no new conditioned space or fenestration or change to building envelope. no electrical, mechanical or plumbing work to be done | $1,000 |
| Jul 13, 2015 | Expired or cancelled withdrawn Aug 2015 | 200 Green St | Blackline Construction | change use from industrial to office space. remove existing walls, build new with 6 meeting roomsDetails
change use from industrial to office space. remove existing walls, build new with 6 meeting rooms | $25,000 |
| Jan 14, 2013 | Completed final sign-off Jul 2015 | 200 Green St | V & J Construction | remove tile and carpet and repair conc. floor. install a track and 3 hanging doors for closet. install shelf in closet. comply with nov#20127828Details
remove tile and carpet and repair conc. floor. install a track and 3 hanging doors for closet. install shelf in closet. comply with nov#20127828 | $1,800 |
| Dec 9, 2003 | Never finaled issued Dec 2003, no final | 200 Green St | Geniali Construction Co | renew 200206179193 for final.Details
renew 200206179193 for final. | |
| Jun 17, 2002 | Never finaled issued Jun 2002, no final | 200 Green St | Geniali Construction Co | oti-1 1/f el lsDetails
oti-1 1/f el ls | $89,600 |
| Aug 8, 2000 | Expired or cancelled expired Feb 2001 | 200 Green St | fire alarm system installationDetails
fire alarm system installation |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Blackline Construction (2), Geniali Construction Co (2), Meylan Construction (2), Pascual Diaz Construction (2), Vk Construction (2), D A Pope Inc, Elson Electric Inc, Fog City Roofiing Llc, Maven Maintenance Inc, Tri County Electric Inc, Tulley Mechanical, Inc, V & J Construction
- Architects
- Albert Costa (2), Louis Felthouse
- Engineers
- David G Kallmeyer
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.