Fog City Roofiing Llc
- Based in
- Alameda
- On San Francisco permits
- Jan 2022 to May 2026
- Last 24 months
- 74 permits filed
115 permits since 2000: 104 completed, 7 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 115.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 30, 2026 | In progress issued Jul 2026 | 7630 Geary Bl | unit 201: interior renovation. convert (e) powder room to new full bathroom. install new washer/dryer. extend kitchen cabinets, new kitchen appliances. relocate electrical sub-panel.Details
unit 201: interior renovation. convert (e) powder room to new full bathroom. install new washer/dryer. extend kitchen cabinets, new kitchen appliances. relocate electrical sub-panel. | $9,000 |
| Apr 14, 2026 | Completed final sign-off May 2026 | 210 Church St | reroofing: hot worksDetails
reroofing: hot works | $35,900 |
| Apr 9, 2026 | Completed final sign-off Jun 2026 | 261 Dolores St | tear off existing roofing. install layer of underlayment paper. install layer of shingles. no hot works.Details
tear off existing roofing. install layer of underlayment paper. install layer of shingles. no hot works. | $30,000 |
| Apr 9, 2026 | Completed final sign-off May 2026 | 1052 Filbert St | as an additional to permit bldg-26-332 iuused for siding replacement in the lightwell. we will also reinforce and repair setions of the framing where rot wood is present, less than 50%, not visible sfrom street.Details
as an additional to permit bldg-26-332 iuused for siding replacement in the lightwell. we will also reinforce and repair setions of the framing where rot wood is present, less than 50%, not visible sfrom street. | $12,700 |
| Mar 17, 2026 | Completed final sign-off Apr 2026 | 280 Fair Oaks St | reroofing no hot worksDetails
reroofing no hot works | $31,100 |
| Mar 5, 2026 | Completed final sign-off Jun 2026 | 173 Gambier St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,900 |
| Feb 13, 2026 | Completed final sign-off Mar 2026 | 1160 Pine St | remove and replace skylight in-kind.Details
remove and replace skylight in-kind. | $9,900 |
| Feb 13, 2026 | Completed final sign-off Jul 2026 | 1326 Larkin St | reroofing hotworks: t/o (e) roof, install 1 layer of underlayment, install 1 layer modified bitumen. hot works.Details
reroofing hotworks: t/o (e) roof, install 1 layer of underlayment, install 1 layer modified bitumen. hot works. | $23,800 |
| Feb 4, 2026 | In progress issued Feb 2026 | 817 Clement St | 4 vinyl windows, replacement rear side (south west side) window will be the same size as existing ones. repair rear stais rotten wood will be replaced. stair will be repair like for like (less then 50%) no alteration to its design. we are only replacing the rotten wood to make it safe.Details
4 vinyl windows, replacement rear side (south west side) window will be the same size as existing ones. repair rear stais rotten wood will be replaced. stair will be repair like for like (less then 50%) no alteration to its design. we are only replacing the rotten wood to make it safe. | $30,000 |
| Jan 20, 2026 | Completed final sign-off Mar 2026 | 631 Chenery St | reroof, no hot work.Details
reroof, no hot work. | $25,000 |
| Jan 20, 2026 | Completed final sign-off Feb 2026 | 2512 Sacramento St | reroof, no hot work.Details
reroof, no hot work. | $35,900 |
| Jan 6, 2026 | Completed final sign-off Jun 2026 | 817 Clement St | south west side. remove existing siding, isntall new siding in kind, not visible from streetDetails
south west side. remove existing siding, isntall new siding in kind, not visible from street | $69,900 |
| Dec 3, 2025 | Completed final sign-off Mar 2026 | 200 04th Av | re-roofing ( overlaying composition chingles.) no hot works.Details
re-roofing ( overlaying composition chingles.) no hot works. | $73,900 |
| Nov 26, 2025 | Completed final sign-off Dec 2025 | 2635 Mcallister St | to comply with nov 202544414 items 2 & 3: wood repair to staircase back of bldg. common stairs less than 50% repair.Details
to comply with nov 202544414 items 2 & 3: wood repair to staircase back of bldg. common stairs less than 50% repair. | $6,900 |
| Nov 26, 2025 | Completed final sign-off Dec 2025 | 706 Kearny St | reroofing: roof coating application over entire roof w/associated repairs to deteriorated wood and (e) polycarbonate panels. silicone primer will be applied to the entire roof surface, flashings will be extra sealed & the silicone coating will be applied at 3gal rate per square. no hot works.Details
reroofing: roof coating application over entire roof w/associated repairs to deteriorated wood and (e) polycarbonate panels. silicone primer will be applied to the entire roof surface, flashings will be extra sealed & the silicone coating will be applied at 3gal rate per square. no hot works. | $79,900 |
| Nov 25, 2025 | Completed final sign-off Dec 2025 | 420 Congo St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,500 |
| Nov 24, 2025 | In progress filed Nov 2025, not yet issued | 706 Kearny St | re roofing in light well, no torch down.Details
re roofing in light well, no torch down. | $21,000 |
| Nov 21, 2025 | Completed final sign-off Dec 2025 | 86 Ellington Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $10,250 |
| Nov 6, 2025 | In progress issued Nov 2025 | 6705 California St | partial siding replacement south west side. remove the existing siding. install a new one in kind. not visible from street.Details
partial siding replacement south west side. remove the existing siding. install a new one in kind. not visible from street. | $25,120 |
| Nov 6, 2025 | Completed final sign-off Nov 2025 | 2640 Greenwich St | clean the roof surface. apply primer & silicone coating. roof repair.Details
clean the roof surface. apply primer & silicone coating. roof repair. | $64,300 |
| Nov 6, 2025 | Completed final sign-off Dec 2025 | 6705 California St | reroof. hot works.Details
reroof. hot works. | $19,000 |
| Oct 22, 2025 | Completed final sign-off Dec 2025 | 2 Seymour St | reroofing: tear-off (e) roof. install (1) layer of underlayment papaer. install 1 layer of composition shingles. no hot works.Details
reroofing: tear-off (e) roof. install (1) layer of underlayment papaer. install 1 layer of composition shingles. no hot works. | $15,000 |
| Oct 22, 2025 | Completed final sign-off Dec 2025 | 1813 Polk St | re-roofing with hot worksDetails
re-roofing with hot works | $69,500 |
| Oct 22, 2025 | Completed final sign-off Jan 2026 | 2 Seymour St | facade siding replacement: remove the (e) siding and replace for a new one in-kind. street facing.Details
facade siding replacement: remove the (e) siding and replace for a new one in-kind. street facing. | $35,000 |
| Oct 22, 2025 | Completed final sign-off Nov 2025 | 1028 Sacramento St | re-roofing with hot worksDetails
re-roofing with hot works | $29,800 |
| Oct 22, 2025 | Completed final sign-off Nov 2025 | 2210 Jackson St | facade repair: patch cracks on the stucco and around windows. street facing.Details
facade repair: patch cracks on the stucco and around windows. street facing. | $55,600 |
| Oct 21, 2025 | Completed final sign-off Nov 2025 | 1862 20th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $26,900 |
| Oct 9, 2025 | In progress filed Oct 2025, not yet issued | 3571 16th St | clean and repair sidewalk cracks. apply concrete crack fillerto all visible cracks. smooth the dummy dummyDetails
clean and repair sidewalk cracks. apply concrete crack fillerto all visible cracks. smooth the dummy dummy | |
| Oct 9, 2025 | Completed final sign-off Nov 2025 | 2199 California St | re roofing: tear off existing roof and haul away. instalo one layer of underlayment and paper, install 1 layer of modified bitumen (hot works).Details
re roofing: tear off existing roof and haul away. instalo one layer of underlayment and paper, install 1 layer of modified bitumen (hot works). | $56,000 |
| Oct 3, 2025 | Completed final sign-off Dec 2025 | 1821 Polk St | unit 5: kitchen and bathroom renovation in kind. floor lvt installation. paint whole unit.Details
unit 5: kitchen and bathroom renovation in kind. floor lvt installation. paint whole unit. | $43,800 |
| Sep 26, 2025 | Completed final sign-off Nov 2025 | 668 Clay St | clean the roof and drains, apply primer on the roofing surface, apply silicone coating, no hot worksDetails
clean the roof and drains, apply primer on the roofing surface, apply silicone coating, no hot works | $58,500 |
| Sep 23, 2025 | Completed final sign-off Oct 2025 | 3324 Broderick St | re-roofing: tear off existing roofing, install 1 layer of underlayment paper, install 1 layer of modified bitumen, hot worksDetails
re-roofing: tear off existing roofing, install 1 layer of underlayment paper, install 1 layer of modified bitumen, hot works | $19,800 |
| Sep 16, 2025 | Completed final sign-off Oct 2025 | 1700 Octavia St | facade repair (only front part of the building) patch cracks around the windows and on the concrete to match existing. install sidewalk canopy.Details
facade repair (only front part of the building) patch cracks around the windows and on the concrete to match existing. install sidewalk canopy. | $28,100 |
| Sep 8, 2025 | Completed final sign-off Oct 2025 | 2129 Wawona St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,900 |
| Aug 29, 2025 | Completed final sign-off Sep 2025 | 730 Montgomery St | replace skylight in existing opening. u<=0.30Details
replace skylight in existing opening. u<=0.30 | $5,900 |
| Aug 29, 2025 | Completed final sign-off Sep 2025 | 101 Steiner St | reroofing: tear off the (e) roof and haul away. install 1 layer of underlayment paper. install 1 layer of modified bitumen (flat area). install 1 layer of shingles (steep roof). hot works.Details
reroofing: tear off the (e) roof and haul away. install 1 layer of underlayment paper. install 1 layer of modified bitumen (flat area). install 1 layer of shingles (steep roof). hot works. | $26,400 |
| Aug 26, 2025 | Completed final sign-off Sep 2025 | 1944 Anza St | reroof. hot worksDetails
reroof. hot works | $23,700 |
| Aug 26, 2025 | Completed final sign-off Sep 2025 | 1130 Mason St | reroof. hot worksDetails
reroof. hot works | $15,900 |
| Aug 20, 2025 | Completed final sign-off Nov 2025 | 2207 Fillmore St | re-roofing (w/ hotworks). to comply to partially abate with nov 202535892 items 6 and 7. to comply to partially abate with nov 20254302 items 2 and 3.Details
re-roofing (w/ hotworks). to comply to partially abate with nov 202535892 items 6 and 7. to comply to partially abate with nov 20254302 items 2 and 3. | $23,900 |
| Aug 15, 2025 | Completed final sign-off Sep 2025 | 112 Columbus Av | reroofing with hot work.Details
reroofing with hot work. | $175,000 |
| Aug 11, 2025 | Completed final sign-off Aug 2025 | 749 Jackson St | re-roof. hot work. tear off existing roofing and haul away. install (1) layer of underlayment paper. install (1) layer of modified bitumen.Details
re-roof. hot work. tear off existing roofing and haul away. install (1) layer of underlayment paper. install (1) layer of modified bitumen. | $42,000 |
| Jul 31, 2025 | Completed final sign-off Aug 2025 | 1522 Waller St | re-roof. hot work. overlay. install (1) layer of underlayment paper. install (1) layer of modified bitumen.Details
re-roof. hot work. overlay. install (1) layer of underlayment paper. install (1) layer of modified bitumen. | $19,800 |
| Jul 31, 2025 | Completed final sign-off Oct 2025 | 844 Folsom St | re-roof. hot work. tear off (e) roofinf and haul away. install 1 layere of underlayment paper. install tpo membane.Details
re-roof. hot work. tear off (e) roofinf and haul away. install 1 layere of underlayment paper. install tpo membane. | $33,600 |
| Jul 24, 2025 | Completed final sign-off Aug 2025 | 477 14th St | reroofing with hot works.Details
reroofing with hot works. | $24,900 |
| Jul 24, 2025 | Completed final sign-off Aug 2025 | 3735 Anza St | re-roof. hot work. remove existing roof. install (1) layer of underlayment paper. install (1) layer of modified butimen.Details
re-roof. hot work. remove existing roof. install (1) layer of underlayment paper. install (1) layer of modified butimen. | $27,500 |
| Jul 24, 2025 | Completed final sign-off Aug 2025 | 2258 Market St | remove existing skylight on flat roof and haul away. install new skylight in kind.Details
remove existing skylight on flat roof and haul away. install new skylight in kind. | $1,790 |
| Jul 24, 2025 | Completed final sign-off Aug 2025 | 19 Rausch St | reroofing with hot worksDetails
reroofing with hot works | $64,300 |
| Jul 15, 2025 | Completed final sign-off Aug 2025 | 1938 Jefferson St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,800 |
| Jul 1, 2025 | Completed final sign-off Jul 2025 | 3140 Octavia St | re roofing: tear off existing roofing. install 1 layer of underlayment paper, install 1 layer of modified bitumen. (hot work).Details
re roofing: tear off existing roofing. install 1 layer of underlayment paper, install 1 layer of modified bitumen. (hot work). | $31,000 |
| Jun 26, 2025 | Completed final sign-off Jul 2025 | 625 Guerrero St | reroofing: apply primer on top of the existing roofing.install new modified bitumen membrane on top of the existing one. "hot works"Details
reroofing: apply primer on top of the existing roofing.install new modified bitumen membrane on top of the existing one. "hot works" | $18,700 |
| Jun 3, 2025 | Completed final sign-off Jun 2025 | 477 Oak St | re-roofing. no hot works.Details
re-roofing. no hot works. | $12,000 |
| Jun 3, 2025 | Completed final sign-off Jul 2025 | 367 Ivy St | re-roofing. hot works.Details
re-roofing. hot works. | $49,500 |
| May 22, 2025 | Completed final sign-off Jul 2025 | 534 Pacific Av | re-roofing w/ hot works.Details
re-roofing w/ hot works. | $27,600 |
| Apr 25, 2025 | Completed final sign-off May 2025 | 1821 Polk St | repair existing guardrail in kind, less than 50%. not street visible.Details
repair existing guardrail in kind, less than 50%. not street visible. | $2,450 |
| Apr 14, 2025 | Completed final sign-off May 2025 | 1651 Oak St | re-roofing with hot works. comply w/ item , nov #202313905.Details
re-roofing with hot works. comply w/ item , nov #202313905. | $24,200 |
| Mar 31, 2025 | Completed final sign-off Apr 2025 | 860 Geary St | re-roofing with hot worksDetails
re-roofing with hot works | $51,000 |
| Mar 31, 2025 | Completed final sign-off May 2025 | 2015 Sacramento St | reroofing with hot works.Details
reroofing with hot works. | $28,500 |
| Mar 31, 2025 | Completed final sign-off May 2025 | 5540 California St | re-roofing witth hot worksDetails
re-roofing witth hot works | $18,900 |
| Mar 31, 2025 | Completed final sign-off May 2025 | 1140 Hyde St | reroofing with hot works.Details
reroofing with hot works. | $24,200 |
| Mar 10, 2025 | Completed final sign-off Mar 2025 | 775 27th St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $9,500 |
| Mar 6, 2025 | Completed final sign-off May 2025 | 30 Glover St | reroof with hot works.Details
reroof with hot works. | $12,100 |
| Mar 6, 2025 | Completed final sign-off May 2025 | 200 Green St | reroof flat roof, modified bitumen, hot works.Details
reroof flat roof, modified bitumen, hot works. | $119,600 |
| Feb 26, 2025 | Completed final sign-off May 2025 | 716 28th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $26,900 |
| Feb 20, 2025 | In progress issued Feb 2025 | 486 Grove St | partial siding replacement at front. remove existing siding ad haul away, install 1 layer of underlayment, new siding in kind.Details
partial siding replacement at front. remove existing siding ad haul away, install 1 layer of underlayment, new siding in kind. | $26,400 |
| Feb 20, 2025 | Completed final sign-off Apr 2025 | 486 Grove St | reroofing. hot worksDetails
reroofing. hot works | $19,800 |
| Feb 14, 2025 | Completed final sign-off Mar 2025 | 1054 Filbert St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $18,500 |
| Feb 7, 2025 | Completed final sign-off Mar 2025 | 1052 Filbert St | reroofing (w/ hotworks)Details
reroofing (w/ hotworks) | $16,500 |
| Feb 7, 2025 | Completed final sign-off Mar 2025 | 1321 Columbus Av | reroofing (w/ hotworks)Details
reroofing (w/ hotworks) | $25,000 |
| Jan 7, 2025 | Completed final sign-off Jan 2025 | 640 Douglass St | reroofing - remove (e) roof instll underlayment install shinglesDetails
reroofing - remove (e) roof instll underlayment install shingles | $16,500 |
| Jan 7, 2025 | Completed final sign-off Jan 2025 | 448 Grove St | reroofing torch downDetails
reroofing torch down | $57,600 |
| Dec 6, 2024 | Completed final sign-off Mar 2025 | 817 Clement St | re-roof: no torch down or hot worksDetails
re-roof: no torch down or hot works | $42,000 |
| Dec 5, 2024 | Completed final sign-off Jan 2025 | 33 Hemway Tr | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,900 |
| Nov 4, 2024 | Expired or cancelled cancelled Mar 2025 | 775 27th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $9,500 |
| Oct 11, 2024 | Completed final sign-off Oct 2024 | 1550 33rd Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $10,000 |
| Sep 30, 2024 | In progress filed Sep 2024, not yet issued | 693 Sutter St | reroofing. torch downDetails
reroofing. torch down | $124,000 |
| Sep 5, 2024 | Completed final sign-off Oct 2024 | 4201 Geary Bl | reroofing.Details
reroofing. | $59,500 |
| Sep 5, 2024 | Completed final sign-off Nov 2024 | 102 Baker St | reroofing. to comply with items 2 & 3 for complaint 202290668.Details
reroofing. to comply with items 2 & 3 for complaint 202290668. | $63,600 |
| Aug 6, 2024 | Completed final sign-off Sep 2024 | 2 Foerster St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $23,350 |
| Jul 30, 2024 | Completed final sign-off Sep 2024 | 2190 42nd Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $8,900 |
| Jun 21, 2024 | Completed final sign-off Aug 2024 | 174 Schwerin St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,500 |
| Jun 3, 2024 | Completed final sign-off Jun 2024 | 510 Parker Av | reroofingDetails
reroofing | $29,900 |
| May 20, 2024 | Completed final sign-off Jul 2025 | 205 Collins St | reroofingDetails
reroofing | $89,500 |
| Apr 8, 2024 | Completed final sign-off Dec 2024 | 521 Waller St | reroofingDetails
reroofing | $39,900 |
| Apr 3, 2024 | Completed final sign-off Apr 2024 | 1930 Powell St | silicon coating application on the roofDetails
silicon coating application on the roof | $15,300 |
| Mar 15, 2024 | Completed final sign-off Mar 2024 | 79 Madrone Av | reroofingDetails
reroofing | $11,900 |
| Mar 15, 2024 | Completed final sign-off Apr 2024 | 147 Varennes St | reroofingDetails
reroofing | $7,900 |
| Feb 13, 2024 | Completed final sign-off Mar 2024 | 1665 Chestnut St | reroofingDetails
reroofing | $32,500 |
| Feb 13, 2024 | Completed final sign-off Apr 2024 | 3927 Clay St | re-roofing.Details
re-roofing. | $34,050 |
| Feb 8, 2024 | Completed final sign-off May 2025 | 1023 Kansas St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $32,500 |
| Jan 18, 2024 | Completed final sign-off May 2025 | 2126 20th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $11,200 |
| Jan 18, 2024 | Completed final sign-off Jan 2024 | 2187 39th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $9,000 |
| Dec 12, 2023 | Completed final sign-off Jan 2024 | 830 Lake St | re-roofingDetails
re-roofing | $13,400 |
| Dec 12, 2023 | Completed final sign-off Jan 2024 | 160 Madrone Av | re-roofingDetails
re-roofing | $18,200 |
| Nov 16, 2023 | Completed final sign-off Jan 2024 | 42 Castro St | reroofingDetails
reroofing | $22,650 |
| Nov 8, 2023 | Completed final sign-off Jan 2024 | 2519 38th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $9,000 |
| Nov 2, 2023 | Completed final sign-off Dec 2023 | 1299 Fitzgerald Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $8,800 |
| Sep 5, 2023 | Completed final sign-off Sep 2023 | 1941 Cabrillo St | reroofingDetails
reroofing | $17,000 |
| Aug 3, 2023 | Completed final sign-off Aug 2023 | 2814 Polk St | reroofing. certainteed flintastic integrity system, tear off (e)roof, install 1-layer bse sheet, 1-layer ultra sa, 1-layer flintastic gtaDetails
reroofing. certainteed flintastic integrity system, tear off (e)roof, install 1-layer bse sheet, 1-layer ultra sa, 1-layer flintastic gta | $10,500 |
| Jul 10, 2023 | Completed final sign-off Aug 2023 | 1570 21st Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,900 |
| Jun 22, 2023 | Completed final sign-off Jul 2023 | 98 Broderick St | reroofingDetails
reroofing | $24,000 |