Block 3588, lot 063
625 Guerrero St
- City’s use
- Multi-Family Residential
- Built
- 1924
- Stories
- 4
- Units
- 13
- Rooms
- 12 bedrooms, 15 bathrooms
- Building
- 10,432 sq ft
- Lot
- 4,042 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
26 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 26, 2025 | Completed final sign-off Jul 2025 | 625 Guerrero St | Fog City Roofiing Llc | reroofing: apply primer on top of the existing roofing.install new modified bitumen membrane on top of the existing one. "hot works"Details
reroofing: apply primer on top of the existing roofing.install new modified bitumen membrane on top of the existing one. "hot works" | $18,700 |
| Jan 26, 2021 | Completed final sign-off Mar 2021 | 625 Guerrero St | Brighter Bay Builders Inc | unit 4: kitchen remodel & add 1 under counter washer/dryer (new). no structural work; no layout change.Details
unit 4: kitchen remodel & add 1 under counter washer/dryer (new). no structural work; no layout change. | $35,000 |
| Dec 14, 2020 | Expired or cancelled cancelled Jan 2026 | 625 Guerrero St | install (n) ashwood cabinet in foyer to house existing backflow preventer & fire sprinkler piping. no change to lobby, entry door, facade or egress. not visible from street.Details
install (n) ashwood cabinet in foyer to house existing backflow preventer & fire sprinkler piping. no change to lobby, entry door, facade or egress. not visible from street. | $1,500 | |
| Jul 8, 2020 | Never finaled filed Jul 2020, never issued | 625 Guerrero St | street spaceDetails
street space | ||
| Jan 21, 2020 | Never finaled issued Jan 2020, no final | 625 Guerrero St | streetspaceDetails
streetspace | ||
| Dec 12, 2019 | Completed final sign-off Aug 2020 | 625 Guerrero St | Station 1 Fire Protection | as-built drawings piping & reroute add 2 heads, change head type 4 heads. ref pa #201909252626Details
as-built drawings piping & reroute add 2 heads, change head type 4 heads. ref pa #201909252626 | |
| Nov 26, 2019 | Completed final sign-off Jul 2020 | 625 Guerrero St | San Francisco Fire Protection | installing 7 new low frequency sounder in unit on first floor. ref pa #201909262776.Details
installing 7 new low frequency sounder in unit on first floor. ref pa #201909262776. | $4,000 |
| Nov 20, 2019 | Expired or cancelled withdrawn Jan 2020 | 625 Guerrero St | unit 6, 3rd fl - reno new bedroom, new kitchen cabinets and plumbing fixture, new washer/dryer & dishwashers, new lighting @ (e) j-boxes. no change to mechanical. no work to exterior, fire alarm or sprinkler. structural calcs and drwgs providedDetails
unit 6, 3rd fl - reno new bedroom, new kitchen cabinets and plumbing fixture, new washer/dryer & dishwashers, new lighting @ (e) j-boxes. no change to mechanical. no work to exterior, fire alarm or sprinkler. structural calcs and drwgs provided | $65,000 | |
| Nov 15, 2019 | Never finaled issued Nov 2019, no final | 625 Guerrero St | street spaceDetails
street space | ||
| Sep 26, 2019 | Never finaled issued Sep 2019, no final | 625 Guerrero St | San Francisco Fire Protection | f/a: adding 3 low frequency sounders to an existing fire alarm system. ref pa 2018-0924-1201Details
f/a: adding 3 low frequency sounders to an existing fire alarm system. ref pa 2018-0924-1201 | $1,000 |
| Sep 25, 2019 | Completed final sign-off Aug 2020 | 625 Guerrero St | Station 1 Fire Protection | install new nfpa 13 residential fire sprinkler system; 41 sprinklers and new 2" dedicated fire service pro press copper from the sidewalk to riser. ref pa 2017-0622-0138sDetails
install new nfpa 13 residential fire sprinkler system; 41 sprinklers and new 2" dedicated fire service pro press copper from the sidewalk to riser. ref pa 2017-0622-0138s | $22,000 |
| Sep 9, 2019 | Never finaled issued Sep 2019, no final | 625 Guerrero St | street spaceDetails
street space | ||
| Jun 14, 2019 | Never finaled issued Jun 2019, no final | 625 Guerrero St | street space onlyDetails
street space only | ||
| May 8, 2019 | Completed final sign-off Sep 2019 | 625 Guerrero St | Grizzly Builders Inc. | apt 10: renovation of unit on 4/f. new kitchen relocation, relocate (e) bedroom with kitchen, new pl.umbing, new lighting, add washer/dryer, add d/w. no change to mech. no f/a or f/s work. no exterior work.Details
apt 10: renovation of unit on 4/f. new kitchen relocation, relocate (e) bedroom with kitchen, new pl.umbing, new lighting, add washer/dryer, add d/w. no change to mech. no f/a or f/s work. no exterior work. | $25,000 |
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 625 Guerrero St | street space onlyDetails
street space only | ||
| Dec 13, 2018 | Never finaled issued Jan 2019, no final | 625 Guerrero St | revisions related to as-built conditions for pa 201708185312Details
revisions related to as-built conditions for pa 201708185312 | ||
| Sep 24, 2018 | Never finaled issued Sep 2018, no final | 625 Guerrero St | San Francisco Fire Protection | ti i nstall 3 new low frequency sounders in newly remodeled unit #7 & tie-in to existing notification circuit. ref pa 2018-0404-5500 and 2018-0510-8815Details
ti i nstall 3 new low frequency sounders in newly remodeled unit #7 & tie-in to existing notification circuit. ref pa 2018-0404-5500 and 2018-0510-8815 | $2,000 |
| May 21, 2018 | Never finaled issued May 2018, no final | 625 Guerrero St | street spaceDetails
street space | ||
| May 10, 2018 | Never finaled issued May 2018, no final | 625 Guerrero St | Grizzly Builders Inc. | renovation of unit #7 on level 3. new kitchen cabinets. new plumbing fixtures. new lighting at (e) j-box locations. add washer/dryer. no changes to mech. no exterior work. no fire alarm or sprinkler work.Details
renovation of unit #7 on level 3. new kitchen cabinets. new plumbing fixtures. new lighting at (e) j-box locations. add washer/dryer. no changes to mech. no exterior work. no fire alarm or sprinkler work. | $15,000 |
| Apr 4, 2018 | Never finaled issued Apr 2018, no final | 625 Guerrero St | San Francisco Fire Protection | like for like fire system replacent w/ new control unit, smoke detectors & pull staion at the same location. install new power supply & radio communicator, low freq sounders in newly remodeled unit #1 & #11 only. ref. 201706300868Details
like for like fire system replacent w/ new control unit, smoke detectors & pull staion at the same location. install new power supply & radio communicator, low freq sounders in newly remodeled unit #1 & #11 only. ref. 201706300868 | $8,000 |
| Dec 1, 2017 | Never finaled issued Dec 2017, no final | 625 Guerrero St | street spaceDetails
street space | ||
| Aug 18, 2017 | Completed final sign-off Jun 2020 | 625 Guerrero St | Sandbank Construction, Inc | soft story retrofit in accordance with chapter 4a of 2016 cebc. reference app #2017-0622-0138.Details
soft story retrofit in accordance with chapter 4a of 2016 cebc. reference app #2017-0622-0138. | $75,000 |
| Jun 30, 2017 | Completed final sign-off Apr 2018 | 625 Guerrero St | Grizzly Builders Inc. | remodel 2 apartments: unit 1 at 2nd floor, and unit 11 at 4th floor. new structural walls, new kitchen cabinets, new plumbing fixtures, new lighting, electrical and mechanical. no exterior work, no fire alarm or sprinkler work.Details
remodel 2 apartments: unit 1 at 2nd floor, and unit 11 at 4th floor. new structural walls, new kitchen cabinets, new plumbing fixtures, new lighting, electrical and mechanical. no exterior work, no fire alarm or sprinkler work. | $210,000 |
| Jun 22, 2017 | Completed final sign-off Sep 2020 | 625 Guerrero St | Grizzly Builders Inc. | convert (e) basement space to (n) dwelling units per ord 162-16, within (e) envelope. (n) kitchen, baths & entry doors. (n) windows visible from street. no structural work- under separate permit. sprinkler & fire alarm under seperate app.Details
convert (e) basement space to (n) dwelling units per ord 162-16, within (e) envelope. (n) kitchen, baths & entry doors. (n) windows visible from street. no structural work- under separate permit. sprinkler & fire alarm under seperate app. | $75,000 |
| Sep 28, 2006 | Completed final sign-off Nov 2006 | 625 Guerrero St | Safeway Roofing & Siding Co. | reroofingDetails
reroofing | $16,850 |
| Apr 5, 2002 | Completed final sign-off Apr 2002 | 625 Guerrero St | Pioneer Builders | replace deterioratiing stringers at bottom of stairs 2 feet/replace eight treads and risersDetails
replace deterioratiing stringers at bottom of stairs 2 feet/replace eight treads and risers | $700 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Grizzly Builders Inc. (4), San Francisco Fire Protection (4), Station 1 Fire Protection (2), Brighter Bay Builders Inc, Fog City Roofiing Llc, Pioneer Builders, Safeway Roofing & Siding Co., Sandbank Construction, Inc
- Architects
- Jacob Herczeg (6), Kathryn Briggs
- Engineers
- Tyler Moser
Find contractors for work like this