Block 1219, lot 018
102 Baker St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 2,680 sq ft
- Lot
- 2,422 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2025 | Completed final sign-off Sep 2025 | 102 Baker St | C & E Electric & Fire Alarm Services | fire alarm system add-on to enable sprinkler system monitoringDetails
fire alarm system add-on to enable sprinkler system monitoring | $6,700 |
| Feb 4, 2025 | Completed final sign-off Sep 2025 | 102 Baker St | G M Building And Construction Inc | recommencement and completion of work approved under bpa#: 2014.1125.2470 and 2019.0514.0612Details
recommencement and completion of work approved under bpa#: 2014.1125.2470 and 2019.0514.0612 | |
| Feb 4, 2025 | Completed final sign-off Sep 2025 | 102 Baker St | G M Building And Construction Inc | recommencement and completion of work approved under bpa#: 2021.0315.6569 and 2021.0824.7053Details
recommencement and completion of work approved under bpa#: 2021.0315.6569 and 2021.0824.7053 | |
| Dec 6, 2024 | Completed final sign-off Aug 2025 | 102 Baker St | O'connor Plumbing & Fire Protection | provide new fire sprinkler system hroughout building w/standpipe and new underground fire service per nfpa 24 ref pa 201411252470Details
provide new fire sprinkler system hroughout building w/standpipe and new underground fire service per nfpa 24 ref pa 201411252470 | $35,000 |
| Sep 5, 2024 | Completed final sign-off Nov 2024 | 102 Baker St | Fog City Roofiing Llc | reroofing. to comply with items 2 & 3 for complaint 202290668.Details
reroofing. to comply with items 2 & 3 for complaint 202290668. | $63,600 |
| Aug 24, 2021 | Expired or cancelled expired Sep 2025 | 102 Baker St | Actually Design Build Inc | localized foundation detail revision to pa# 201905140612Details
localized foundation detail revision to pa# 201905140612 | $4,000 |
| Mar 15, 2021 | Expired or cancelled expired Sep 2025 | 102 Baker St | Actually Design Build Inc | install temporary partial building shoring to accomodate perimeter foundation installation using steel i-beams and wood cribbing. ref pa# 201905140612.Details
install temporary partial building shoring to accomodate perimeter foundation installation using steel i-beams and wood cribbing. ref pa# 201905140612. | $10,000 |
| Dec 18, 2020 | Completed final sign-off Apr 2021 | 102 Baker St | Actually Design Build Inc | geogrout for soil stabilization. ref pa# 201905140612.Details
geogrout for soil stabilization. ref pa# 201905140612. | $15,000 |
| May 14, 2019 | Expired or cancelled expired Sep 2025 | 102 Baker St | Actually Design Build Inc | revision to app#201411252470 s/r4. comply with 2013 edition of sfbc. replace structural drawings with framing alterations. no change to site permit & architectural addendum.Details
revision to app#201411252470 s/r4. comply with 2013 edition of sfbc. replace structural drawings with framing alterations. no change to site permit & architectural addendum. | |
| Nov 25, 2014 | Expired or cancelled expired Sep 2025 | 102 Baker St | covert (e) storage space @ 1st flr into garage w/toilet (under sep permit). rebuild (e) front port & stair (under sep permit). new interior stair to 3rd & 4th flr units. relocate kit & bath at 2nd & 3rd flr. complete remodel of 4th fl-legalize 4th fl (n) unit c. seismic upgrade fire sprinkler systemDetails
covert (e) storage space @ 1st flr into garage w/toilet (under sep permit). rebuild (e) front port & stair (under sep permit). new interior stair to 3rd & 4th flr units. relocate kit & bath at 2nd & 3rd flr. complete remodel of 4th fl-legalize 4th fl (n) unit c. seismic upgrade fire sprinkler system | $50,000 | |
| Nov 1, 2005 | Completed final sign-off Dec 2005 | 102 Baker St | A L V Construction Inc | renew app #200303139537 for final inspectionDetails
renew app #200303139537 for final inspection | |
| Mar 13, 2003 | Expired or cancelled expired Dec 2005 | 102 Baker St | to correct n.o.v./ remove 2 illigal kchn at 1st & 4th floor/rmv illigal bthrm rstore space backDetails
to correct n.o.v./ remove 2 illigal kchn at 1st & 4th floor/rmv illigal bthrm rstore space back | $20,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Actually Design Build Inc (4), G M Building And Construction Inc (2), A L V Construction Inc, C & E Electric & Fire Alarm Services, Fog City Roofiing Llc, O'connor Plumbing & Fire Protection
- Architects
- Joram Altman
- Engineers
- Fareed Himmati (2), Fareed Himmati, Kevin O'connor
Find contractors for work like this