Block 1246, lot 013
1522 Waller St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 3
- Rooms
- 3 bathrooms
- Building
- 3,100 sq ft
- Lot
- 2,513 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 8, 2025 | Completed final sign-off May 2026 | 1522 Waller St | G M Building And Construction Inc | 3rd/f front unit: n) bath, remodel e) kitchen w/wall removal, convert closet to laundry, remove fireplace. 3rd/f rear unit: remodel 2 e) baths, remodel kitchen w/wall removal, convert toilet to laundry, widen bedroom closet door, removel fireplace. 2nd/f unit: remodel 2 e) baths & kitchen remodel w/Details
3rd/f front unit: n) bath, remodel e) kitchen w/wall removal, convert closet to laundry, remove fireplace. 3rd/f rear unit: remodel 2 e) baths, remodel kitchen w/wall removal, convert toilet to laundry, widen bedroom closet door, removel fireplace. 2nd/f unit: remodel 2 e) baths & kitchen remodel w/ | $89,000 |
| Jul 31, 2025 | Completed final sign-off Aug 2025 | 1522 Waller St | Fog City Roofiing Llc | re-roof. hot work. overlay. install (1) layer of underlayment paper. install (1) layer of modified bitumen.Details
re-roof. hot work. overlay. install (1) layer of underlayment paper. install (1) layer of modified bitumen. | $19,800 |
| May 28, 2025 | Completed final sign-off May 2026 | 1524 Waller St | G M Building And Construction Inc | renovate kitchen in kind. renovate 2 bathrooms. electrial and plumbing as needed.Details
renovate kitchen in kind. renovate 2 bathrooms. electrial and plumbing as needed. | $38,500 |
| Aug 14, 2006 | Never finaled issued Aug 2006, no final | 1524 Waller St | Safeway Plumbing & Construction Co | reroofingDetails
reroofing | $8,800 |
| Jun 9, 2006 | Completed final sign-off Nov 2007 | 1524 Waller St | rennovating a basement apartment. tearing down existing setup and building new setup, remodel basement /1 floor apt new kitchen.Details
rennovating a basement apartment. tearing down existing setup and building new setup, remodel basement /1 floor apt new kitchen. | $30,000 | |
| Nov 18, 2003 | Never finaled issued Nov 2003, no final | 1524 Waller St | street spaceDetails
street space | ||
| Nov 5, 2003 | Completed final sign-off Jan 2004 | 1524 Waller St | Rupert Velasquez | repair front entry stairs, same as (e)Details
repair front entry stairs, same as (e) | $3,500 |
| Aug 20, 2003 | Completed final sign-off Jan 2004 | 1524 Waller St | to rebuild existing rotten egress stairs at rear in kind per plansDetails
to rebuild existing rotten egress stairs at rear in kind per plans | $12,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- G M Building And Construction Inc (2), Fog City Roofiing Llc, Rupert Velasquez, Safeway Plumbing & Construction Co
- Architects
- George Fong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.