Block 0208, lot 011
706 Kearny St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
48 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 26, 2025 | Completed final sign-off Dec 2025 | 706 Kearny St | Fog City Roofiing Llc | reroofing: roof coating application over entire roof w/associated repairs to deteriorated wood and (e) polycarbonate panels. silicone primer will be applied to the entire roof surface, flashings will be extra sealed & the silicone coating will be applied at 3gal rate per square. no hot works.Details
reroofing: roof coating application over entire roof w/associated repairs to deteriorated wood and (e) polycarbonate panels. silicone primer will be applied to the entire roof surface, flashings will be extra sealed & the silicone coating will be applied at 3gal rate per square. no hot works. | $79,900 |
| Nov 24, 2025 | In progress filed Nov 2025, not yet issued | 706 Kearny St | Fog City Roofiing Llc | re roofing in light well, no torch down.Details
re roofing in light well, no torch down. | $21,000 |
| Sep 7, 2021 | Completed final sign-off Nov 2021 | 680 Clay St | International Commercial Awning, Inc. | install a new canvas awning over store front with hand paint signage included see plan.Details
install a new canvas awning over store front with hand paint signage included see plan. | $4,800 |
| Sep 7, 2021 | Completed final sign-off Nov 2021 | 680 Clay St | International Commercial Awning, Inc. | hand paint lettering/logo on new canvas awning per plan.Details
hand paint lettering/logo on new canvas awning per plan. | $1,500 |
| Dec 27, 2019 | Never finaled filed Dec 2019, never issued | 700 Kearny St | demolish portion of storefront. install new storefront, new entry doors and automatic door opener maher not reqDetails
demolish portion of storefront. install new storefront, new entry doors and automatic door opener maher not req | $115,000 | |
| Jun 19, 2019 | Never finaled issued Jun 2019, no final | 680 Clay St | Ha Fire Protection | ref pa# 201901079695; as built plans for approved hood & duct fire supression system n/a maherDetails
ref pa# 201901079695; as built plans for approved hood & duct fire supression system n/a maher | |
| May 13, 2019 | Completed final sign-off Jun 2019 | 680 Clay St | San Francisco Fire Protection | add on to (e) fire alarm system, ti addining notification devices throughout restaurantDetails
add on to (e) fire alarm system, ti addining notification devices throughout restaurant | $3,000 |
| Apr 30, 2019 | Completed final sign-off Oct 2019 | 706 Kearny St | Aligned Technologies Llc Dba Aligned Dev | replace (e) plm and lighting fixtures new floor and wall tile in bathrooms, new stair flooring, new kitchen countertop, new handrails at stairs, new infill partitions at (e) wall opening, new hallway flooring.Details
replace (e) plm and lighting fixtures new floor and wall tile in bathrooms, new stair flooring, new kitchen countertop, new handrails at stairs, new infill partitions at (e) wall opening, new hallway flooring. | $130,000 |
| Apr 17, 2019 | Expired or cancelled cancelled Jan 2026 | 708 Kearny St | new electric sign at storefrontDetails
new electric sign at storefront | $2,800 | |
| Apr 17, 2019 | Expired or cancelled cancelled Jan 2026 | 708 Kearny St | new electric sign projectingDetails
new electric sign projecting | $2,800 | |
| Feb 11, 2019 | Expired or cancelled cancelled Jan 2026 | 704 Kearny St | Steve's Awning | new awming frame with canvas cover: burgundy color.Details
new awming frame with canvas cover: burgundy color. | $600 |
| Jan 29, 2019 | Completed final sign-off Mar 2019 | 680 Clay St | Liberty Fire Systems Inc | on 1st floor and mezz -add new fire sprinkler piping to existing system at ground and 2nd fl. ti pa #201811065056.Details
on 1st floor and mezz -add new fire sprinkler piping to existing system at ground and 2nd fl. ti pa #201811065056. | $25,500 |
| Jan 17, 2019 | Never finaled issued Jan 2019, no final | 680 Clay St | Indoor Air Design Inc | furnish and install 2 new heating only systems to serve the proposed restaurant. furnish and install ventilation for the new restrooms. ref pa 201811065056.Details
furnish and install 2 new heating only systems to serve the proposed restaurant. furnish and install ventilation for the new restrooms. ref pa 201811065056. | $28,710 |
| Jan 7, 2019 | Completed final sign-off Jun 2019 | 680 Clay St | Ha Fire Protection | install ul-300 fire suppression system for hood & duct - 15 flow ptsDetails
install ul-300 fire suppression system for hood & duct - 15 flow pts | $3,500 |
| Dec 4, 2018 | Never finaled issued Dec 2018, no final | 680 Clay St | Makita Construction Inc. | mep work attached to app#201811065056. n/a for maherDetails
mep work attached to app#201811065056. n/a for maher | $15,000 |
| Nov 27, 2018 | Never finaled issued Nov 2018, no final | 680 Clay St | street space and sidewalk repair.Details
street space and sidewalk repair. | ||
| Nov 6, 2018 | Completed final sign-off Jun 2019 | 680 Clay St | Makita Construction Inc. | interior t.i. bathroom upgrade to ada. new kitchen hood and outlet. non bearing wall.Details
interior t.i. bathroom upgrade to ada. new kitchen hood and outlet. non bearing wall. | $95,000 |
| Oct 22, 2018 | Completed final sign-off Jan 2019 | 680 Clay St | Makita Construction Inc. | structural remodel- remove (e) wall & install (n) beamDetails
structural remodel- remove (e) wall & install (n) beam | $1,500 |
| Aug 31, 2018 | Never finaled issued Aug 2018, no final | 700 Kearny St | street spaceDetails
street space | ||
| Aug 31, 2018 | Completed final sign-off Oct 2018 | 680 Clay St | Aligned Technologies Llc Dba Aligned Dev | revision to 201808026227 shorten first floor. maher n/a.Details
revision to 201808026227 shorten first floor. maher n/a. | |
| Aug 2, 2018 | Completed final sign-off Oct 2018 | 680 Clay St | Aligned Technologies Llc Dba Aligned Dev | structural repairs upper levelDetails
structural repairs upper level | $25,000 |
| Jul 11, 2018 | Completed final sign-off Feb 2019 | 680 Clay St | Aligned Technologies Llc Dba Aligned Dev | storefront alterations and structural strengthening of existing 1st fl and reframing at existing void in floor to accomodate new door placement.Details
storefront alterations and structural strengthening of existing 1st fl and reframing at existing void in floor to accomodate new door placement. | $26,000 |
| Jun 19, 2018 | Never finaled issued Jun 2018, no final | 700 Kearny St | street spaceDetails
street space | ||
| Jun 19, 2018 | Never finaled issued Jun 2018, no final | 678 Clay St | Aligned Technologies Llc Dba Aligned Dev | remove signs and awnings for paintingDetails
remove signs and awnings for painting | $2,000 |
| May 31, 2018 | Completed final sign-off Jul 2018 | 680 Clay St | Aligned Technologies Llc Dba Aligned Dev | remove & replace beam & post for 1st fl.Details
remove & replace beam & post for 1st fl. | $18,000 |
| Nov 20, 2017 | Never finaled issued Apr 2018, no final | 680 Clay St | Aligned Technologies Llc Dba Aligned Dev | demolition of non structural partitions in vacant 1st floor, mezzanine and basement commercial space in preparation for leasing to future tenant. electrical under seperate permit. no mechanical. n/a for maherDetails
demolition of non structural partitions in vacant 1st floor, mezzanine and basement commercial space in preparation for leasing to future tenant. electrical under seperate permit. no mechanical. n/a for maher | $15,000 |
| Aug 10, 2015 | Expired or cancelled cancelled Jan 2026 | 700 Kearny St | erect a electric projecting double faced sign. n/a for maher ordinance.Details
erect a electric projecting double faced sign. n/a for maher ordinance. | $3,000 | |
| Jan 30, 2015 | Completed final sign-off Nov 2015 | 708 Kearny St | Crown Plumbing & Construction | new prep area, new plumbing for sink, new electrical switch board, new lights, re-tile bathroom, re-finish restroom; maher n/aDetails
new prep area, new plumbing for sink, new electrical switch board, new lights, re-tile bathroom, re-finish restroom; maher n/a | $23,300 |
| Oct 3, 2014 | Completed final sign-off Jan 2016 | 700 Kearny St | Torrance J Collins | scope of work to include new gyp bo through out. new floor, wall finishes. new electrical, minor plumbing and heating. n/a for the maher.Details
scope of work to include new gyp bo through out. new floor, wall finishes. new electrical, minor plumbing and heating. n/a for the maher. | $100,000 |
| Jan 7, 2014 | Never finaled issued Apr 2014, no final | 704 Kearny St | Lushov Construction Inc | revision to pa# 201304295711 change fire escape location.Details
revision to pa# 201304295711 change fire escape location. | $1,200 |
| Oct 18, 2013 | Completed final sign-off Apr 2014 | 706 Kearny St | Precision Design & Drafting Inc | to comply with nov# 201242901 & pnov# 12298. removal of roof top tower stream wifi antenna. (keep 1 otard antenna.). compliance with ordinance no. 155-13 not required.Details
to comply with nov# 201242901 & pnov# 12298. removal of roof top tower stream wifi antenna. (keep 1 otard antenna.). compliance with ordinance no. 155-13 not required. | $500 |
| May 29, 2013 | Completed final sign-off Jun 2013 | 706 Kearny St | Alpha Construction Company | to comply with ordinance 029-13 installation of grab bars in sro at hte following locations, 4 baths and 4 showersDetails
to comply with ordinance 029-13 installation of grab bars in sro at hte following locations, 4 baths and 4 showers | $1,000 |
| Apr 29, 2013 | Never finaled issued Sep 2013, no final | 704 Kearny St | Lushov Construction Inc | change of occupancy. two facials & cellalite weight loss rooms, plus 1 shower room. one (e) handicap restroom; all on street level. basement; build two facials & weight lost rooms plus one shower, one restroom. one (e) mop sink & washer/dryer assets. 1 heater central air & 1 water heater.Details
change of occupancy. two facials & cellalite weight loss rooms, plus 1 shower room. one (e) handicap restroom; all on street level. basement; build two facials & weight lost rooms plus one shower, one restroom. one (e) mop sink & washer/dryer assets. 1 heater central air & 1 water heater. | $20,000 |
| Nov 7, 2011 | Completed final sign-off Nov 2011 | 710 Kearny St | Peninsula Fire Protection Inc | upgrade fire supression system to comply with u.l. 300 standards.Details
upgrade fire supression system to comply with u.l. 300 standards. | $5,000 |
| Nov 4, 2011 | Expired or cancelled cancelled Jan 2026 | 710 Kearny St | remove the wall between the kitchen area. provide (n) handsink, prep sink, 3-comp. sink @ kitchen per health dept. request.Details
remove the wall between the kitchen area. provide (n) handsink, prep sink, 3-comp. sink @ kitchen per health dept. request. | $2,000 | |
| Aug 10, 2011 | Never finaled issued Aug 2011, no final | 710 Kearny St | street space permit.Details
street space permit. | ||
| Jul 15, 2011 | Completed final sign-off May 2012 | 710 Kearny St | Shek's Construction Co | replace floor and wall tiles at kitchen and dining area. new hand sink and prep sink at kitchen. provide (n) service coutner 36" wide x 34" high.Details
replace floor and wall tiles at kitchen and dining area. new hand sink and prep sink at kitchen. provide (n) service coutner 36" wide x 34" high. | $12,000 |
| Oct 29, 2009 | Expired or cancelled expired Dec 2009 | 680 Clay St | All Bay Cities Construction | to obtain final inspection for work approved under pa3200809232348. all work is complete.Details
to obtain final inspection for work approved under pa3200809232348. all work is complete. | |
| May 15, 2009 | Completed final sign-off May 2009 | 700 Kearny St | Pacific Automatic Sprinkler | to obtain final inspection for work approved under pa#200709051762. all work completed.Details
to obtain final inspection for work approved under pa#200709051762. all work completed. | |
| Sep 23, 2008 | Expired or cancelled expired Dec 2009 | 680 Clay St | All Bay Cities Construction | remove cap shower, washer, dryer in basement. to comply w/nov#200860751.Details
remove cap shower, washer, dryer in basement. to comply w/nov#200860751. | $800 |
| May 20, 2008 | Completed final sign-off Jul 2009 | 706 Kearny St | San Francisco Fire Protection | install fire control panel for sprinkler monitoring.Details
install fire control panel for sprinkler monitoring. | $2,000 |
| May 7, 2008 | Never finaled issued May 2008, no final | 700 Kearny St | Grand Roofing Inc. | reroofing.Details
reroofing. | $60,000 |
| Apr 8, 2008 | Never finaled issued Apr 2008, no final | 700 Kearny St | street space & sidewalk permit only.Details
street space & sidewalk permit only. | ||
| Mar 13, 2008 | Never finaled issued Mar 2008, no final | 710 Kearny St | street space & sidewalk permit only.Details
street space & sidewalk permit only. | ||
| Sep 5, 2007 | Expired or cancelled expired May 2009 | 700 Kearny St | Pacific Automatic Sprinkler | install a fire sprinkler system to protect the restaurant basement floor as required by the district fire inspector. (fire sprinkler work only.)Details
install a fire sprinkler system to protect the restaurant basement floor as required by the district fire inspector. (fire sprinkler work only.) | $13,500 |
| Sep 28, 2004 | Never finaled issued Sep 2004, no final | 706 Kearny St | street space & sidewalk permit.Details
street space & sidewalk permit. | ||
| Nov 8, 2002 | Never finaled issued Nov 2002, no final | 706 Kearny St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| May 28, 2002 | Expired or cancelled expired Mar 2004 | 706 Kearny St | Fire Protection Retrofit Specialist | to install fire sprinkler system to comply with ord#165-2 on 2nd flrDetails
to install fire sprinkler system to comply with ord#165-2 on 2nd flr | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Aligned Technologies Llc Dba Aligned Dev (7), Makita Construction Inc. (3), All Bay Cities Construction (2), Fog City Roofiing Llc (2), Ha Fire Protection (2), International Commercial Awning, Inc. (2), Lushov Construction Inc (2), Pacific Automatic Sprinkler (2), San Francisco Fire Protection (2), Alpha Construction Company, Crown Plumbing & Construction, Fire Protection Retrofit Specialist, Grand Roofing Inc., Indoor Air Design Inc, Liberty Fire Systems Inc, Peninsula Fire Protection Inc, Precision Design & Drafting Inc, Shek's Construction Co, Steve's Awning, Torrance J Collins
- Architects
- Sharon Cox (4), Frank Ho
- Engineers
- John Popa (2), Joshua Marrow, Joshua Marrow, Michael Fleming, Ramil Batiancila
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.