Joshua Marrow
- Listed as
- architect, engineer
- Firm
- Partner Engineering
- Based in
- San Francisco
- On San Francisco permits
- Feb 2015 to Sep 2024
8 permits since 2000 (engineer on 7 permits, architect on 1 permit): 8 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2024 | Completed final sign-off Feb 2025 | 667 33rd Av | replace support pole in gargae area due to damage by vehicleDetails
replace support pole in gargae area due to damage by vehicle | $16,000 | |
| Nov 5, 2018 | Completed final sign-off Sep 2020 | 659 Merchant St | Aligned Technologies Llc Dba Aligned Dev | voluntary seismic retrofit to vacant space. disable accessibility upgrade will be filed under separate tenant improvement permit, building will remain vacant, failure to comply will result in issuance of notice of violation per sfbc ab-017.Details
voluntary seismic retrofit to vacant space. disable accessibility upgrade will be filed under separate tenant improvement permit, building will remain vacant, failure to comply will result in issuance of notice of violation per sfbc ab-017. | $45,000 |
| Aug 2, 2018 | Completed final sign-off Oct 2018 | 680 Clay St | Aligned Technologies Llc Dba Aligned Dev | structural repairs upper levelDetails
structural repairs upper level | $25,000 |
| Jul 17, 2018 | Completed final sign-off Apr 2019 | 422 Arguello Bl | Gil Construction & Assoc Inc. | repairing & reconstructing the 1st fl main staircase & adj. part. walls damaged by car collision damage. comply w/nov #201873461. priority given to reconstr of main staircase to allow tenants to move back into bldg. displaced steel beam header above garage opening to be addressed/fixed future permitDetails
repairing & reconstructing the 1st fl main staircase & adj. part. walls damaged by car collision damage. comply w/nov #201873461. priority given to reconstr of main staircase to allow tenants to move back into bldg. displaced steel beam header above garage opening to be addressed/fixed future permit | $35,000 |
| Nov 20, 2017 | Completed final sign-off May 2019 | 146 Portola Dr | Mulhall Construction Inc. | to comply with nov 201719801: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a4Details
to comply with nov 201719801: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a4 | $95,000 |
| Jul 18, 2017 | Completed final sign-off Sep 2018 | 1758 Palou Av | 2nd fl - move kitchen to back right, divide center right room into pantry and closet. remove chimney. remove 2 walls and install a drop header. install bathroom in current kitchen space. reconfigure 1st fl back by expanding back bathroom. add walls to create walk-in closet, widen stair. changeDetails
2nd fl - move kitchen to back right, divide center right room into pantry and closet. remove chimney. remove 2 walls and install a drop header. install bathroom in current kitchen space. reconfigure 1st fl back by expanding back bathroom. add walls to create walk-in closet, widen stair. change | $25,000 | |
| Mar 28, 2017 | Completed final sign-off Oct 2017 | 1153 Leavenworth St | S L M Development Inc. | soft story retrofit per sfbc chapter 4d engineering criteria 2012 iebc appendix a-4. maher naDetails
soft story retrofit per sfbc chapter 4d engineering criteria 2012 iebc appendix a-4. maher na | $25,000 |
| Feb 11, 2015 | Completed final sign-off Apr 2015 | 2727 Polk St | Mulhall Construction Inc. | revision to pa#201501206070 s1.1 relocate shear wall due to (e) obstructions, s1.2 relocate shear wall & extend grade beam due to no footing, s2.2 revised detail due to (e) pipe obstructions, s2.3 add (n) sheet to provide details for unforseen (e) conditions.Details
revision to pa#201501206070 s1.1 relocate shear wall due to (e) obstructions, s1.2 relocate shear wall & extend grade beam due to no footing, s2.2 revised detail due to (e) pipe obstructions, s2.3 add (n) sheet to provide details for unforseen (e) conditions. |